| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$8,000.00 |
$41,000.00 |
$15,000.00 |
$12,133.34 |
$15,000.00 |
$15,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,113.94 | CY |
$10.00 |
$23.96 |
$12.00 |
$19.01 |
$28.00 |
$29.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 7,181 | LF |
$1.38 |
$4.68 |
$2.50 |
$4.99 |
$2.00 |
$4.75 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 430 | LF |
$6.00 |
$20.88 |
$8.00 |
$10.50 |
$8.00 |
$21.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 14,111.11 | SY |
$3.65 |
$5.18 |
$7.30 |
$5.46 |
$4.00 |
$5.20 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,890.56 | CY |
$46.70 |
$43.00 |
$31.00 |
$57.89 |
$65.00 |
$65.00 |
| 7 | 311(B) 0152 |
PROCESSING EXISTING BASE & SURFACE, METHOD B | 4,820 | LF |
$4.00 |
$5.09 |
$7.50 |
$4.75 |
$14.00 |
$5.00 |
| 8 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 15,707.8 | SY |
$3.25 |
$1.52 |
$3.00 |
$1.11 |
$2.50 |
$2.50 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 625 | TON |
$33.00 |
$22.11 |
$17.30 |
$31.68 |
$26.00 |
$33.00 |
| 10 | 407(B) 0250 |
TACK COAT | 2,076 | GAL |
$2.00 |
$2.06 |
$2.50 |
$2.99 |
$2.00 |
$0.0100 |
| 11 | 408 5774 |
PRIME COAT | 7,051 | GAL |
$3.00 |
$2.46 |
$1.50 |
$4.78 |
$1.26 |
$0.0100 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,106.68 | TON |
$85.00 |
$59.05 |
$89.50 |
$90.59 |
$88.49 |
$83.00 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,563.42 | TON |
$87.00 |
$70.24 |
$96.00 |
$97.36 |
$95.05 |
$95.00 |
| 14 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 606.5 | SY |
$40.00 |
$45.00 |
$55.00 |
$31.82 |
$40.00 |
$34.00 |
| 15 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 101.1 | CY |
$175.00 |
$175.00 |
$215.00 |
$202.73 |
$250.00 |
$165.00 |
| 16 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 0.98 | CY |
$750.00 |
$2,000.00 |
$2,700.00 |
$1,244.90 |
$1,000.00 |
$300.00 |
| 17 | 509(D) 0325 |
CLASS C CONCRETE | 11.7 | CY |
$350.00 |
$400.00 |
$507.50 |
$366.00 |
$1,000.00 |
$1,600.00 |
| 18 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 90.4 | TON |
$60.00 |
$61.80 |
$38.00 |
$61.00 |
$45.00 |
$70.00 |
| 19 | 609(B) 1513 |
1'-8" COMB. CURB & GUTTER (6" BARRIER) | 9,189 | LF |
$25.00 |
$16.00 |
$26.50 |
$23.55 |
$22.50 |
$30.00 |
| 20 | 611(G) 5100 |
INLET CI DES. 1 (STD) | 2 | EA |
$2,850.00 |
$2,900.00 |
$1,750.00 |
$2,829.18 |
$3,000.00 |
$3,200.00 |
| 21 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 1 | EA |
$2,500.00 |
$4,200.00 |
$2,600.00 |
$4,184.36 |
$5,000.00 |
$4,600.00 |
| 22 | 611(G) 6000 |
INLET (SMD-TYPE 1) | 1 | EA |
$3,500.00 |
$3,470.00 |
$2,000.00 |
$3,479.44 |
$5,600.00 |
$3,900.00 |
| 23 | 611(L) 0487 |
JUNCTION BOXES | 20.22 | CF |
$100.00 |
$236.50 |
$1,800.00 |
$158.20 |
$130.00 |
$1,700.00 |
| 24 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 103.98 | LF |
$30.00 |
$61.04 |
$35.00 |
$56.62 |
$60.00 |
$60.00 |
| 25 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 235.66 | LF |
$69.00 |
$85.14 |
$68.00 |
$75.25 |
$70.00 |
$68.00 |
| 26 | 613(A) 4499 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 42 | LF |
$170.00 |
$212.00 |
$124.60 |
$217.03 |
$275.00 |
$181.00 |
| 27 | 613(A) 4505 |
24" X 38" R.C.PIPE ELLIPTICAL CLASS HE-III | 40 | LF |
$105.00 |
$117.39 |
$35.00 |
$134.53 |
$175.00 |
$152.00 |
| 28 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 332 | LF |
$34.85 |
$42.29 |
$44.50 |
$53.28 |
$60.00 |
$59.00 |
| 29 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 1,200 | LF |
$7.50 |
$18.80 |
$3.00 |
$7.32 |
$14.00 |
$15.00 |
| 30 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 60 | LF |
$5.50 |
$18.80 |
$4.00 |
$6.10 |
$13.00 |
$45.00 |
| 31 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 18 | EA |
$350.21 |
$881.00 |
$165.00 |
$365.40 |
$200.00 |
$580.00 |
| 32 | 613(L) 4540 |
51" X 31" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$2,000.00 |
$3,300.00 |
$2,900.00 |
$3,717.94 |
$4,000.00 |
$3,535.00 |
| 33 | 613(L) 5820 |
24" X 38" PREFAB. CULVERT END SEC., ELLIPTICAL | 2 | EA |
$3,605.00 |
$1,487.00 |
$1,500.00 |
$1,765.94 |
$1,200.00 |
$1,450.00 |
| 34 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 6 | EA |
$350.00 |
$700.00 |
$1,800.00 |
$610.00 |
$200.00 |
$500.00 |
| 35 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 856.5 | SY |
$12.00 |
$5.89 |
$4.00 |
$12.05 |
$5.00 |
$6.00 |
| 36 | 619(C) 0924 |
SAWING PAVEMENT | 255 | LF |
$8.91 |
$3.09 |
$8.00 |
$8.57 |
$6.00 |
$8.50 |
| 37 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 7 | EA |
$125.00 |
$150.00 |
$200.00 |
$157.50 |
$150.00 |
$150.00 |
| 38 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 141 | SF |
$17.52 |
$10.00 |
$11.00 |
$10.50 |
$10.00 |
$10.50 |
| 39 | 851(C) 8324 |
2" SQUARE TUBE POST | 247 | LF |
$9.19 |
$6.00 |
$7.00 |
$6.30 |
$6.00 |
$6.25 |
| 40 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 19,358 | LF |
$0.1500 |
$0.1800 |
$0.2000 |
$0.1900 |
$0.1800 |
$0.1800 |
| 41 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,695.00 |
$14,600.00 |
$4,500.00 |
$6,405.00 |
$3,600.00 |
$40,000.00 |
| 42 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$17,600.00 |
$28,000.00 |
$9,215.13 |
$25,000.00 |
$30,000.00 |
| 43 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$5,000.00 |
$2,000.00 |
$2,832.42 |
$2,500.00 |
$10,000.00 |
| 44 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$113,922.00 |
$102,380.00 |
$40,000.00 |
$65,189.65 |
$90,000.00 |
$100,000.00 |