| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$75,000.00 |
$33,000.00 |
$28,000.00 |
$40,000.00 |
$196,829.01 |
$8,515.64 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 51,686 | CY |
$6.00 |
$10.00 |
$6.00 |
$7.00 |
$6.72 |
$8.00 |
$16.99 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$9.00 |
$10.00 |
$7.40 |
$15.00 |
$1.00 |
$11.00 |
$16.41 |
| 4 | 205(A) 4230 |
TYPE A-SALVAGED TOPSOIL | 12,295 | CY |
$8.00 |
$4.00 |
$8.40 |
$7.50 |
$8.32 |
$4.00 |
$10.05 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 38,954 | LF |
$1.50 |
$1.80 |
$2.05 |
$2.10 |
$2.47 |
$1.00 |
$2.00 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 6 | EA |
$65.00 |
$250.00 |
$258.50 |
$265.00 |
$140.84 |
$100.00 |
$165.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,148 | LF |
$9.70 |
$15.00 |
$15.50 |
$15.00 |
$8.47 |
$6.50 |
$3.65 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 500 | LF |
$3.00 |
$4.00 |
$4.10 |
$4.25 |
$4.57 |
$10.00 |
$8.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 900 | SY |
$5.00 |
$7.00 |
$7.20 |
$7.35 |
$7.96 |
$3.50 |
$11.50 |
| 10 | 232(B) 2814 |
SEEDING METHOD B | 32.12 | AC |
$170.00 |
$1,200.00 |
$3,051.00 |
$3,100.00 |
$3,380.37 |
$2,800.00 |
$1,000.00 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 32.12 | AC |
$288.00 |
$1,200.00 |
$1,500.00 |
$1,500.00 |
$1,661.54 |
$1,990.00 |
$950.00 |
| 12 | 241 2832 |
MOWING | 82.91 | AC |
$60.00 |
$80.00 |
$81.70 |
$80.00 |
$90.53 |
$85.00 |
$79.00 |
| 13 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 19,636 | CY |
$35.00 |
$32.00 |
$36.75 |
$39.00 |
$35.33 |
$40.00 |
$43.48 |
| 14 | 307(K) 4300 |
STABILIZED SUBGRADE | 99,565 | SY |
$4.00 |
$4.00 |
$5.50 |
$5.50 |
$3.98 |
$5.75 |
$4.98 |
| 15 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 99,543 | SY |
$2.00 |
$3.00 |
$3.10 |
$3.25 |
$4.52 |
$4.00 |
$3.82 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 6,863 | TON |
$18.00 |
$15.00 |
$17.70 |
$18.00 |
$16.78 |
$20.00 |
$22.14 |
| 17 | 407(B) 0250 |
TACK COAT | 9,531 | GAL |
$2.00 |
$2.00 |
$2.10 |
$2.10 |
$4.34 |
$2.30 |
$2.10 |
| 18 | 408 5774 |
PRIME COAT | 40,075 | GAL |
$2.00 |
$0.5000 |
$2.75 |
$2.75 |
$5.00 |
$3.10 |
$2.85 |
| 19 | 409(A) 4242 |
FABRIC REINFORCEMENT | 13,169 | SY |
$1.90 |
$1.00 |
$1.40 |
$1.50 |
$3.44 |
$1.60 |
$1.40 |
| 20 | 409(B) 4268 |
BITUMINOUS BINDER | 2,634 | GAL |
$2.00 |
$3.00 |
$2.00 |
$3.25 |
$5.73 |
$2.40 |
$2.15 |
| 21 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 6,802 | TON |
$68.00 |
$51.00 |
$59.40 |
$62.00 |
$68.29 |
$69.00 |
$62.00 |
| 22 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 20,512 | TON |
$60.00 |
$51.00 |
$55.30 |
$57.00 |
$57.85 |
$67.50 |
$58.00 |
| 23 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 2,221 | TON |
$75.00 |
$70.00 |
$76.50 |
$76.00 |
$82.73 |
$89.00 |
$80.75 |
| 24 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,517 | TON |
$67.00 |
$61.00 |
$57.20 |
$61.00 |
$65.75 |
$65.00 |
$58.85 |
| 25 | 411(F) 6100 |
STONE MATRIX ASPHALT | 4,457 | TON |
$100.00 |
$92.00 |
$87.25 |
$92.00 |
$97.70 |
$100.00 |
$90.00 |
| 26 | 412 5267 |
COLD MILLING PAVEMENT | 44,846 | SY |
$1.80 |
$1.00 |
$1.30 |
$1.40 |
$1.51 |
$1.50 |
$1.35 |
| 27 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 14,558 | SY |
$15.00 |
$15.00 |
$10.80 |
$10.00 |
$10.16 |
$13.00 |
$13.76 |
| 28 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 22,138 | SY |
$17.00 |
$14.50 |
$15.50 |
$14.00 |
$16.16 |
$16.00 |
$18.72 |
| 29 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 9,366 | CY |
$120.00 |
$100.00 |
$106.40 |
$126.00 |
$123.87 |
$130.00 |
$100.00 |
| 30 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 118 | CY |
$20.00 |
$20.00 |
$36.50 |
$37.00 |
$5.73 |
$30.00 |
$16.14 |
| 31 | 509(A) 0319 |
CLASS AA CONCRETE | 267 | CY |
$400.00 |
$600.00 |
$635.00 |
$645.00 |
$1,441.35 |
$605.00 |
$621.01 |
| 32 | 509(D) 0325 |
CLASS C CONCRETE | 34 | CY |
$380.00 |
$625.00 |
$612.00 |
$990.00 |
$338.04 |
$485.00 |
$723.20 |
| 33 | 511(A) 0332 |
REINFORCING STEEL | 32,699 | LB |
$1.50 |
$1.50 |
$0.5500 |
$0.5500 |
$0.7500 |
$0.8500 |
$1.21 |
| 34 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 34 | TON |
$35.00 |
$30.00 |
$129.50 |
$41.00 |
$57.30 |
$60.00 |
$35.83 |
| 35 | 609(A) 0287 |
CONCRETE CURB (4" MNTBLE-INTEGRAL) | 2,084 | LF |
$10.00 |
$5.00 |
$16.10 |
$10.00 |
$1.79 |
$4.00 |
$3.28 |
| 36 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 179 | LF |
$23.00 |
$8.00 |
$19.75 |
$13.00 |
$2.84 |
$15.00 |
$23.86 |
| 37 | 609(B) 1523 |
2'-8" COMB. CURB & GUTTER (4" MNTBLE) | 2,200 | LF |
$24.00 |
$18.00 |
$16.15 |
$23.00 |
$27.02 |
$16.25 |
$16.75 |
| 38 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 210 | SY |
$45.00 |
$90.00 |
$68.60 |
$55.00 |
$51.44 |
$50.00 |
$33.06 |
| 39 | 610(C) 0609 |
6" CONCRETE DIVIDING STRIP | 71 | SY |
$60.00 |
$90.00 |
$56.75 |
$68.00 |
$52.29 |
$43.00 |
$33.06 |
| 40 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 1 | EA |
$3,500.00 |
$4,000.00 |
$3,165.00 |
$2,840.00 |
$3,148.52 |
$4,550.00 |
$2,700.40 |
| 41 | 611(G) 5113 |
INLET CI DES. 2 (B) | 1 | EA |
$4,000.00 |
$4,655.80 |
$4,223.00 |
$3,480.00 |
$3,242.29 |
$4,850.00 |
$2,898.96 |
| 42 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$3,000.00 |
$3,000.00 |
$2,639.00 |
$2,245.00 |
$2,069.61 |
$3,115.00 |
$2,953.58 |
| 43 | 611(G) 6004 |
INLET (SMD-TYPE 2A) | 1 | EA |
$3,500.00 |
$3,200.00 |
$2,639.00 |
$2,750.00 |
$2,268.08 |
$3,585.00 |
$3,514.15 |
| 44 | 611(G) 6006 |
INLET (SMD-TYPE 2B) | 2 | EA |
$3,500.00 |
$3,383.35 |
$2,639.00 |
$3,000.00 |
$2,959.97 |
$4,550.00 |
$3,918.42 |
| 45 | 611(L) 0487 |
JUNCTION BOXES | 202 | CF |
$35.00 |
$100.00 |
$52.80 |
$46.00 |
$62.49 |
$46.50 |
$58.82 |
| 46 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 8 | LF |
$70.00 |
$75.00 |
$52.80 |
$75.00 |
$108.21 |
$81.00 |
$50.98 |
| 47 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 84 | LF |
$62.00 |
$80.00 |
$68.60 |
$79.00 |
$117.68 |
$95.00 |
$52.85 |
| 48 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 48 | LF |
$80.00 |
$85.00 |
$89.75 |
$92.00 |
$98.28 |
$100.00 |
$65.15 |
| 49 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 436 | LF |
$90.00 |
$105.00 |
$110.85 |
$98.00 |
$112.21 |
$135.00 |
$92.90 |
| 50 | 613(A) 0500 |
72" R.C.PIPE CLASS III | 160 | LF |
$200.00 |
$320.00 |
$306.20 |
$230.00 |
$324.13 |
$380.00 |
$283.83 |
| 51 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 230 | LF |
$95.00 |
$95.00 |
$73.90 |
$83.00 |
$70.31 |
$83.00 |
$59.87 |
| 52 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 624 | LF |
$100.00 |
$100.00 |
$89.75 |
$94.00 |
$83.36 |
$120.00 |
$75.53 |
| 53 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 180 | LF |
$105.00 |
$115.00 |
$110.85 |
$109.00 |
$115.64 |
$120.00 |
$89.20 |
| 54 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 532 | LF |
$120.00 |
$145.00 |
$153.10 |
$139.00 |
$136.19 |
$150.00 |
$113.77 |
| 55 | 613(A) 4499 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 50 | LF |
$200.00 |
$170.00 |
$177.40 |
$165.00 |
$158.80 |
$224.00 |
$160.46 |
| 56 | 613(A) 4501 |
65" X 40" R.C.PIPE ARCH CLASS A-III | 140 | LF |
$250.00 |
$220.00 |
$237.50 |
$190.00 |
$314.07 |
$294.00 |
$218.97 |
| 57 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 52 | LF |
$40.00 |
$55.00 |
$42.25 |
$58.00 |
$48.61 |
$41.00 |
$40.81 |
| 58 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 222 | LF |
$30.00 |
$60.00 |
$58.05 |
$62.00 |
$48.28 |
$50.00 |
$65.93 |
| 59 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 2,775 | LF |
$5.00 |
$8.00 |
$8.00 |
$13.00 |
$21.06 |
$13.00 |
$18.01 |
| 60 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 925 | LF |
$7.00 |
$5.00 |
$8.85 |
$13.00 |
$12.75 |
$13.00 |
$17.71 |
| 61 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 4,284 | LF |
$9.00 |
$8.00 |
$7.75 |
$10.00 |
$8.18 |
$12.00 |
$18.88 |
| 62 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 176 | LF |
$20.00 |
$5.00 |
$12.15 |
$10.00 |
$12.00 |
$12.00 |
$18.88 |
| 63 | 613(L) 4506 |
22" X 13" PREFAB. CULVERT END SEC., ARCH | 10 | EA |
$800.00 |
$900.00 |
$1,030.00 |
$980.00 |
$920.85 |
$800.00 |
$693.88 |
| 64 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 16 | EA |
$1,200.00 |
$1,000.00 |
$1,108.00 |
$1,035.00 |
$1,117.03 |
$1,000.00 |
$880.17 |
| 65 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 16 | EA |
$1,400.00 |
$300.00 |
$1,108.00 |
$280.00 |
$1,271.88 |
$370.00 |
$880.17 |
| 66 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 6 | EA |
$1,800.00 |
$1,200.00 |
$1,425.00 |
$1,325.00 |
$1,411.31 |
$1,400.00 |
$1,159.61 |
| 67 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 14 | EA |
$1,600.00 |
$1,800.00 |
$2,164.00 |
$1,880.00 |
$1,887.98 |
$1,700.00 |
$1,477.60 |
| 68 | 613(L) 4540 |
51" X 31" PREFAB. CULVERT END SECTION, ARCH | 1 | EA |
$2,400.00 |
$2,000.00 |
$2,586.00 |
$2,220.00 |
$2,483.31 |
$2,500.00 |
$2,042.88 |
| 69 | 613(L) 4552 |
65" X 40" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$3,000.00 |
$2,500.00 |
$3,035.00 |
$2,565.00 |
$3,584.05 |
$3,300.00 |
$2,835.25 |
| 70 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,100.00 |
$400.00 |
$659.00 |
$680.00 |
$977.08 |
$950.00 |
$799.91 |
| 71 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 3 | EA |
$1,450.00 |
$500.00 |
$1,425.00 |
$1,290.00 |
$1,644.34 |
$1,600.00 |
$1,471.26 |
| 72 | 613(L) 5746 |
72" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$3,500.00 |
$1,000.00 |
$3,695.00 |
$4,300.00 |
$5,011.50 |
$4,750.00 |
$4,190.67 |
| 73 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$1,400.00 |
$1,500.00 |
$1,847.00 |
$1,000.00 |
$1,276.63 |
$1,750.00 |
$2,044.62 |
| 74 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 18 | EA |
$261.00 |
$500.00 |
$414.50 |
$850.00 |
$284.95 |
$480.00 |
$631.83 |
| 75 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$55,000.00 |
$44,750.00 |
$60,000.00 |
$12,785.25 |
$80,000.00 |
$26,075.16 |
| 76 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 109 | LF |
$7.00 |
$10.00 |
$11.60 |
$11.00 |
$9.62 |
$5.50 |
$3.46 |
| 77 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 3,779 | SY |
$6.00 |
$7.00 |
$14.60 |
$7.00 |
$3.34 |
$10.30 |
$4.82 |
| 78 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 16,183 | SY |
$5.00 |
$3.00 |
$3.80 |
$4.00 |
$2.96 |
$9.65 |
$7.26 |
| 79 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 4 | EA |
$50.00 |
$500.00 |
$1,289.00 |
$130.00 |
$343.77 |
$185.00 |
$100.00 |
| 80 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 21,000 | LF |
$0.2000 |
$0.1100 |
$0.4500 |
$0.1500 |
$0.1100 |
$0.1100 |
$0.1000 |
| 81 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,000 | LF |
$0.2000 |
$0.1100 |
$0.1000 |
$0.1500 |
$0.1100 |
$0.1100 |
$0.2500 |
| 82 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 150 | SD |
$8.00 |
$11.00 |
$10.35 |
$11.00 |
$11.46 |
$11.00 |
$10.00 |
| 83 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 345 | SD |
$23.00 |
$6.00 |
$5.20 |
$5.30 |
$5.73 |
$5.70 |
$5.00 |
| 84 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,250 | LF |
$25.00 |
$12.00 |
$6.45 |
$26.00 |
$23.12 |
$15.25 |
$25.10 |
| 85 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,250 | LF |
$3.00 |
$6.00 |
$4.20 |
$8.00 |
$3.50 |
$7.40 |
$2.00 |
| 86 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 345 | SD |
$6.00 |
$11.00 |
$10.35 |
$10.65 |
$11.46 |
$11.00 |
$5.00 |
| 87 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 12,075 | SD |
$0.3500 |
$0.4000 |
$0.3500 |
$0.4000 |
$0.4000 |
$0.4000 |
$1.00 |
| 88 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 10,350 | SD |
$0.6500 |
$0.5500 |
$0.5000 |
$0.5500 |
$0.5700 |
$0.5500 |
$1.00 |
| 89 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 17,250 | SD |
$1.00 |
$1.10 |
$1.00 |
$1.05 |
$1.15 |
$1.10 |
$0.2500 |
| 90 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 8,625 | SD |
$1.00 |
$0.6000 |
$0.5000 |
$0.5500 |
$0.5700 |
$0.5500 |
$0.5000 |
| 91 | 880(C) 8848 |
WING BARRICADES | 1,380 | SD |
$1.00 |
$3.30 |
$3.10 |
$3.20 |
$3.44 |
$3.40 |
$5.00 |
| 92 | 880(D) 8854 |
VERTICAL PANELS | 1,000 | SD |
$0.2500 |
$0.6000 |
$0.5000 |
$0.5500 |
$0.5700 |
$0.5500 |
$0.5000 |
| 93 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 24,150 | SD |
$0.3000 |
$0.3000 |
$0.2500 |
$0.3000 |
$0.2900 |
$0.2800 |
$0.1000 |
| 94 | 880(F) 8878 |
DRUMS | 34,500 | SD |
$0.3000 |
$0.1700 |
$0.1500 |
$0.2000 |
$0.1700 |
$0.1600 |
$0.0700 |
| 95 | 880(G) 8890 |
CHANNELIZER CONES | 69,000 | SD |
$0.3000 |
$0.1700 |
$0.1500 |
$0.2000 |
$0.1700 |
$0.1600 |
$0.0700 |
| 96 | 880(I) 8902 |
FLAGGER | 175 | SD |
$150.00 |
$125.00 |
$76.30 |
$35.00 |
$189.07 |
$170.00 |
$306.46 |
| 97 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,436 | SD |
$13.00 |
$6.00 |
$5.20 |
$5.30 |
$5.73 |
$5.50 |
$8.00 |
| 98 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 18 | EA |
$300.00 |
$55.00 |
$51.70 |
$53.00 |
$57.30 |
$57.00 |
$100.00 |
| 99 | 805(D) 8760 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN | 1 | EA |
$450.00 |
$55.00 |
$51.70 |
$53.00 |
$57.30 |
$57.00 |
$2,500.00 |
| 100 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 171.72 | SF |
$18.00 |
$17.50 |
$15.50 |
$16.00 |
$17.19 |
$17.00 |
$20.00 |
| 101 | 851(C) 8324 |
2" SQUARE TUBE POST | 466 | LF |
$10.00 |
$4.40 |
$4.10 |
$4.25 |
$4.58 |
$4.50 |
$8.00 |
| 102 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 95,200 | LF |
$0.5000 |
$0.5000 |
$0.4500 |
$0.5000 |
$0.5200 |
$0.5000 |
$0.4000 |
| 103 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 9,000 | LF |
$0.6000 |
$0.9500 |
$0.8500 |
$0.9000 |
$0.9700 |
$0.9000 |
$1.00 |
| 104 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,575 | LF |
$1.25 |
$1.10 |
$1.00 |
$1.05 |
$1.15 |
$1.10 |
$1.10 |
| 105 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 600 | LF |
$2.50 |
$2.20 |
$2.00 |
$2.15 |
$2.29 |
$2.25 |
$2.00 |
| 106 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 136 | LF |
$7.00 |
$11.00 |
$10.30 |
$10.65 |
$11.46 |
$11.00 |
$10.00 |
| 107 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 24 | EA |
$150.00 |
$110.00 |
$103.45 |
$106.00 |
$114.59 |
$110.00 |
$125.00 |
| 108 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 3 | EA |
$500.00 |
$110.00 |
$103.45 |
$106.00 |
$114.59 |
$110.00 |
$500.00 |
| 109 | 880(G) 8900 |
TUBE CHANNELIZERS | 45 | EA |
$70.00 |
$100.00 |
$77.50 |
$80.00 |
$85.94 |
$85.00 |
$190.00 |
| 110 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$60,000.00 |
$55,000.00 |
$15,365.00 |
$73,775.00 |
$57,000.00 |
$7,000.00 |
$43,685.00 |
| 111 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$11,090.00 |
$13,500.00 |
$4,000.00 |
$500.00 |
$29,120.59 |
| 112 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$10,000.00 |
$12,020.00 |
$21,171.38 |
$3,000.00 |
$2,500.00 |
$12,847.62 |
| 113 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$365,000.00 |
$370,000.00 |
$124,522.21 |
$400,000.00 |
$410,000.00 |
$20,000.00 |
$349,888.00 |