| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$26,572.97 |
$15,330.00 |
$1,045.00 |
$51,555.00 |
$11,000.00 |
$27,500.00 |
$10,500.00 |
$26,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 63,855 | CY |
$6.99 |
$4.21 |
$4.75 |
$4.40 |
$5.85 |
$4.25 |
$8.25 |
$6.30 |
$5.40 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 4,940 | CY |
$12.94 |
$1.03 |
$1.10 |
$4.70 |
$2.00 |
$5.00 |
$1.00 |
$1.05 |
$8.40 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$30,000.00 |
$11,536.00 |
$9,975.00 |
$1,464.00 |
$50,000.00 |
$15,750.00 |
$27,870.00 |
$14,175.00 |
$18,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,720 | LF |
$1.67 |
$3.09 |
$3.07 |
$3.10 |
$3.55 |
$2.75 |
$1.75 |
$3.15 |
$2.99 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$259.55 |
$515.00 |
$406.85 |
$515.00 |
$706.00 |
$200.00 |
$1,250.00 |
$525.00 |
$395.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 238 | LF |
$8.00 |
$15.45 |
$21.00 |
$15.50 |
$21.20 |
$7.25 |
$9.00 |
$15.75 |
$18.95 |
| 8 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 50 | CY |
$90.00 |
$309.00 |
$45.00 |
$309.00 |
$91.00 |
$70.00 |
$75.00 |
$315.00 |
$145.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 8,880 | SY |
$1.57 |
$3.09 |
$3.04 |
$3.10 |
$3.65 |
$3.10 |
$3.75 |
$3.15 |
$2.95 |
| 10 | 232(B) 2814 |
SEEDING METHOD B | 28 | AC |
$260.00 |
$1,545.00 |
$6,885.00 |
$1,545.00 |
$3,930.00 |
$4,950.00 |
$350.00 |
$1,575.00 |
$6,750.00 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 28 | AC |
$410.19 |
$927.00 |
$6,885.00 |
$927.00 |
$3,930.00 |
$4,950.00 |
$350.00 |
$945.00 |
$6,750.00 |
| 12 | 241 2832 |
MOWING | 12 | AC |
$81.91 |
$103.00 |
$150.00 |
$103.00 |
$111.00 |
$150.00 |
$55.00 |
$105.00 |
$99.00 |
| 13 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 3,245 | CY |
$52.56 |
$46.53 |
$49.64 |
$47.30 |
$48.25 |
$41.00 |
$45.65 |
$61.95 |
$53.00 |
| 14 | 307(K) 4300 |
STABILIZED SUBGRADE | 22,302 | SY |
$5.98 |
$4.83 |
$6.12 |
$4.95 |
$4.45 |
$7.25 |
$6.25 |
$5.09 |
$4.85 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 17,776 | SY |
$1.39 |
$2.41 |
$1.40 |
$2.50 |
$1.50 |
$1.50 |
$0.9900 |
$1.31 |
$1.85 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,097 | TON |
$30.54 |
$27.15 |
$33.95 |
$28.20 |
$28.75 |
$21.00 |
$23.75 |
$23.39 |
$29.00 |
| 17 | 407(B) 0250 |
TACK COAT | 2,636 | GAL |
$3.22 |
$3.55 |
$3.59 |
$3.60 |
$3.30 |
$2.10 |
$3.96 |
$3.78 |
$2.00 |
| 18 | 408 5774 |
PRIME COAT | 11,283 | GAL |
$3.86 |
$4.64 |
$4.68 |
$6.85 |
$4.60 |
$3.15 |
$3.50 |
$7.25 |
$3.00 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,718 | TON |
$78.54 |
$58.61 |
$59.18 |
$60.20 |
$54.75 |
$60.00 |
$67.76 |
$64.05 |
$61.26 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,135 | TON |
$93.84 |
$67.88 |
$68.54 |
$72.60 |
$63.85 |
$70.00 |
$82.56 |
$78.75 |
$70.67 |
| 21 | 412 5267 |
COLD MILLING PAVEMENT | 3,541 | SY |
$5.76 |
$2.52 |
$2.55 |
$3.65 |
$2.15 |
$3.00 |
$5.50 |
$5.20 |
$3.00 |
| 22 | 509(A) 0319 |
CLASS AA CONCRETE | 250 | CY |
$500.00 |
$396.55 |
$375.00 |
$656.50 |
$440.00 |
$420.00 |
$495.00 |
$652.58 |
$600.00 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 46 | CY |
$330.20 |
$360.50 |
$300.00 |
$533.50 |
$353.00 |
$365.00 |
$275.00 |
$436.03 |
$350.00 |
| 24 | 511(A) 0332 |
REINFORCING STEEL | 35,330 | LB |
$0.9800 |
$1.03 |
$0.9000 |
$1.45 |
$1.10 |
$0.9000 |
$1.00 |
$1.00 |
$1.05 |
| 25 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 325 | TON |
$56.01 |
$44.12 |
$42.95 |
$45.60 |
$60.45 |
$55.00 |
$41.22 |
$44.48 |
$45.00 |
| 26 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 110 | TON |
$50.72 |
$33.99 |
$33.40 |
$38.80 |
$65.50 |
$35.00 |
$35.66 |
$31.75 |
$33.00 |
| 27 | 611(G) 5704 |
INLET CDI RCP DES. 1 | 1 | EA |
$2,500.00 |
$3,588.52 |
$3,000.00 |
$3,659.00 |
$3,225.00 |
$3,500.00 |
$2,750.00 |
$2,362.50 |
$3,400.00 |
| 28 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 18 | LF |
$67.24 |
$76.10 |
$40.00 |
$77.40 |
$57.80 |
$40.00 |
$49.95 |
$31.50 |
$39.00 |
| 29 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 181 | LF |
$69.53 |
$93.90 |
$52.50 |
$96.20 |
$72.15 |
$65.00 |
$99.00 |
$50.40 |
$45.00 |
| 30 | 613(B) 0693 |
42" CORR. GALV. STEEL PIPE | 41 | LF |
$28.48 |
$51.50 |
$55.09 |
$52.30 |
$58.90 |
$38.00 |
$42.00 |
$50.40 |
$56.00 |
| 31 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$961.63 |
$1,545.00 |
$1,500.00 |
$1,568.00 |
$1,015.00 |
$1,200.00 |
$1,250.00 |
$1,177.58 |
$875.00 |
| 32 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 4 | EA |
$1,804.56 |
$1,957.00 |
$1,200.00 |
$1,284.00 |
$2,015.00 |
$1,850.00 |
$1,750.00 |
$2,019.15 |
$1,750.00 |
| 33 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$1,545.00 |
$5,500.00 |
$1,568.00 |
$12,535.00 |
$1,500.00 |
$7,750.00 |
$5,250.00 |
$4,600.00 |
| 34 | 619(B) 0291 |
REMOVAL OF HEADWALL | 1 | EA |
$1,679.15 |
$309.00 |
$1,500.00 |
$313.50 |
$1,260.00 |
$12,500.00 |
$5,250.00 |
$2,625.00 |
$3,500.00 |
| 35 | 619(B) 4725 |
REMOVAL OF FENCE | 4,500 | LF |
$2.45 |
$0.8800 |
$1.00 |
$0.8900 |
$3.55 |
$1.75 |
$1.00 |
$0.5300 |
$1.20 |
| 36 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 14,697 | SY |
$4.17 |
$1.44 |
$3.00 |
$4.10 |
$1.40 |
$1.50 |
$2.00 |
$4.20 |
$3.80 |
| 37 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 958 | LF |
$3.42 |
$3.61 |
$3.00 |
$3.10 |
$3.50 |
$3.75 |
$2.00 |
$5.25 |
$6.00 |
| 38 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 362.5 | LF |
$18.64 |
$17.51 |
$21.00 |
$17.50 |
$22.20 |
$21.00 |
$22.00 |
$17.85 |
$17.00 |
| 39 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,306.19 |
$2,214.50 |
$2,500.00 |
$2,214.00 |
$2,370.00 |
$2,600.00 |
$2,820.00 |
$2,257.50 |
$2,150.00 |
| 40 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,842.70 |
$1,411.10 |
$2,100.00 |
$1,411.00 |
$1,765.00 |
$1,700.00 |
$1,870.00 |
$1,438.50 |
$1,370.00 |
| 41 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 1,989 | LF |
$4.99 |
$4.07 |
$4.45 |
$4.05 |
$4.00 |
$6.00 |
$4.40 |
$4.15 |
$3.95 |
| 42 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 567 | LF |
$6.54 |
$4.53 |
$5.40 |
$4.55 |
$4.50 |
$6.50 |
$4.95 |
$4.62 |
$4.40 |
| 43 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$195.44 |
$206.00 |
$250.00 |
$206.00 |
$101.00 |
$150.00 |
$220.00 |
$210.00 |
$200.00 |
| 44 | 629(C) 4960 |
MAILBOX | 2 | EA |
$45.77 |
$25.75 |
$50.00 |
$25.80 |
$50.40 |
$100.00 |
$100.00 |
$26.25 |
$25.00 |
| 45 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 2 | EA |
$43.53 |
$51.50 |
$75.00 |
$51.50 |
$25.20 |
$50.00 |
$100.00 |
$52.50 |
$50.00 |
| 46 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 16 | EA |
$13.16 |
$15.45 |
$16.70 |
$15.50 |
$20.15 |
$12.00 |
$15.00 |
$15.75 |
$10.00 |
| 47 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 186 | CY |
$19.61 |
$20.60 |
$12.00 |
$17.00 |
$12.10 |
$20.00 |
$25.00 |
$22.00 |
$15.00 |
| 48 | 501(G) 6309 |
CLSM BACKFILL | 196 | CY |
$155.46 |
$214.87 |
$173.50 |
$142.50 |
$175.00 |
$180.00 |
$133.00 |
$139.49 |
$150.00 |
| 49 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 836 | LF |
$212.56 |
$203.44 |
$195.92 |
$205.50 |
$198.00 |
$220.00 |
$203.65 |
$205.75 |
$222.00 |
| 50 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$173.39 |
$223.28 |
$183.72 |
$228.50 |
$186.10 |
$165.00 |
$156.33 |
$236.62 |
$250.00 |
| 51 | 504(B) 1305 |
SAW-CUT GROOVING | 1,209.8 | SY |
$4.47 |
$5.00 |
$4.04 |
$3.95 |
$4.10 |
$15.00 |
$4.25 |
$4.24 |
$3.85 |
| 52 | 504(C) 6250 |
SEALED EXPANSION JOINT | 43.2 | LF |
$336.76 |
$237.11 |
$276.40 |
$246.50 |
$278.50 |
$330.00 |
$235.00 |
$272.86 |
$275.00 |
| 53 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 544.4 | LF |
$91.90 |
$86.94 |
$78.00 |
$89.20 |
$78.60 |
$85.00 |
$66.54 |
$76.78 |
$75.00 |
| 54 | 506(A) 1322 |
STRUCTURAL STEEL | 1,380 | LB |
$3.02 |
$2.20 |
$3.10 |
$3.20 |
$3.15 |
$2.10 |
$2.99 |
$3.07 |
$3.00 |
| 55 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$2,135.97 |
$1,434.56 |
$860.00 |
$1,245.00 |
$866.45 |
$1,820.00 |
$1,675.00 |
$1,336.21 |
$1,800.00 |
| 56 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$1,709.31 |
$1,434.56 |
$860.00 |
$1,245.00 |
$866.45 |
$1,820.00 |
$1,675.00 |
$1,336.21 |
$1,800.00 |
| 57 | 509(A) 1326 |
CLASS AA CONCRETE | 247.8 | CY |
$610.23 |
$551.70 |
$515.00 |
$531.50 |
$545.00 |
$630.00 |
$595.00 |
$585.41 |
$575.00 |
| 58 | 509(B) 1328 |
CLASS A CONCRETE | 197.3 | CY |
$626.36 |
$551.70 |
$515.00 |
$742.00 |
$545.00 |
$630.00 |
$595.00 |
$640.41 |
$575.00 |
| 59 | 509(D) 1331 |
CLASS C CONCRETE | 6 | CY |
$697.26 |
$515.00 |
$300.00 |
$795.00 |
$305.00 |
$550.00 |
$1,000.00 |
$846.12 |
$400.00 |
| 60 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 80,040 | LB |
$1.11 |
$1.07 |
$1.04 |
$1.20 |
$1.10 |
$1.10 |
$1.12 |
$1.02 |
$1.05 |
| 61 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 424 | LF |
$36.06 |
$25.94 |
$26.53 |
$35.70 |
$26.75 |
$42.00 |
$44.23 |
$31.43 |
$40.00 |
| 62 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 806 | LF |
$42.64 |
$31.36 |
$28.56 |
$37.00 |
$28.80 |
$46.00 |
$48.23 |
$38.87 |
$48.00 |
| 63 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 424 | LF |
$13.97 |
$12.36 |
$12.00 |
$20.10 |
$12.10 |
$42.00 |
$10.00 |
$13.20 |
$10.00 |
| 64 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 806 | LF |
$16.03 |
$12.36 |
$10.00 |
$18.20 |
$10.10 |
$42.00 |
$10.00 |
$15.40 |
$10.00 |
| 65 | 514(K) 6260 |
(PL)PILOT HOLES | 250 | LF |
$141.64 |
$88.86 |
$101.80 |
$100.00 |
$102.60 |
$220.00 |
$125.00 |
$93.40 |
$125.00 |
| 66 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 67 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 999 | SY |
$4.12 |
$4.79 |
$3.83 |
$3.75 |
$3.90 |
$6.00 |
$4.00 |
$4.02 |
$3.65 |
| 68 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 222 | LF |
$733.75 |
$1,048.42 |
$681.94 |
$701.00 |
$722.00 |
$675.00 |
$880.00 |
$949.10 |
$775.00 |
| 69 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,052.28 |
$2,729.50 |
$2,700.00 |
$4,436.00 |
$2,721.00 |
$3,500.00 |
$50,000.00 |
$7,315.00 |
$3,500.00 |
| 70 | 523(A) 6550 |
SEALER CRACK PREPARATION | 40.8 | LF |
$5.62 |
$6.18 |
$5.15 |
$5.15 |
$5.20 |
$8.00 |
$5.00 |
$5.50 |
$5.00 |
| 71 | 523(B) 6560 |
SEALER RESIN | 0.5 | GAL |
$100.35 |
$221.45 |
$220.00 |
$206.00 |
$222.00 |
$220.00 |
$250.00 |
$220.00 |
$200.00 |
| 72 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 960 | TON |
$42.96 |
$44.12 |
$43.95 |
$45.80 |
$44.30 |
$55.00 |
$42.33 |
$43.29 |
$47.00 |
| 73 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 160 | TON |
$35.29 |
$33.99 |
$35.60 |
$34.30 |
$35.90 |
$35.00 |
$35.66 |
$31.06 |
$35.00 |
| 74 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$27.93 |
$30.90 |
$30.53 |
$63.30 |
$30.80 |
$25.00 |
$25.00 |
$29.25 |
$30.00 |
| 75 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$22.34 |
$30.90 |
$25.00 |
$32.00 |
$25.20 |
$25.00 |
$25.00 |
$29.25 |
$30.00 |
| 76 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$75,000.00 |
$31,456.20 |
$24,500.00 |
$43,190.00 |
$71,030.00 |
$40,000.00 |
$52,500.00 |
$93,500.00 |
$20,000.00 |
| 77 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 17,630 | LF |
$0.1600 |
$0.1300 |
$0.1500 |
$0.1300 |
$0.1000 |
$0.1500 |
$0.1500 |
$0.1400 |
$0.1300 |
| 78 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 2,500 | EA |
$0.7300 |
$0.4700 |
$0.4700 |
$0.4600 |
$0.5000 |
$0.5000 |
$0.5500 |
$0.4700 |
$0.4500 |
| 79 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,000 | LF |
$0.3600 |
$0.2100 |
$0.2100 |
$0.2100 |
$0.1000 |
$0.2500 |
$0.2500 |
$0.2100 |
$0.2000 |
| 80 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 400 | SD |
$13.35 |
$3.09 |
$3.15 |
$3.10 |
$15.15 |
$3.20 |
$3.50 |
$3.15 |
$3.00 |
| 81 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 650 | LF |
$23.62 |
$18.54 |
$27.30 |
$26.80 |
$24.40 |
$28.00 |
$30.00 |
$36.75 |
$26.00 |
| 82 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 450 | LF |
$5.50 |
$5.15 |
$2.06 |
$2.05 |
$13.20 |
$3.00 |
$5.00 |
$10.50 |
$2.00 |
| 83 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,700 | SD |
$0.2400 |
$0.1600 |
$0.1700 |
$0.1500 |
$0.3500 |
$0.2000 |
$0.1800 |
$0.1600 |
$0.1500 |
| 84 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,000 | SD |
$0.4700 |
$0.5200 |
$0.5200 |
$0.5100 |
$1.10 |
$0.6000 |
$0.5500 |
$0.5300 |
$0.5000 |
| 85 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,800 | SD |
$1.20 |
$0.2600 |
$0.2700 |
$0.2600 |
$2.05 |
$0.3000 |
$0.2800 |
$0.2600 |
$0.2500 |
| 86 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,500 | SD |
$0.4300 |
$0.5200 |
$0.5300 |
$0.5100 |
$1.55 |
$0.6000 |
$0.6000 |
$0.5300 |
$0.5000 |
| 87 | 880(C) 8848 |
WING BARRICADES | 420 | SD |
$1.12 |
$1.03 |
$1.10 |
$1.05 |
$5.05 |
$1.10 |
$1.20 |
$1.05 |
$1.00 |
| 88 | 880(D) 8854 |
VERTICAL PANELS | 10,500 | SD |
$0.1600 |
$0.1000 |
$0.1500 |
$0.1000 |
$0.1000 |
$0.1500 |
$0.1200 |
$0.1100 |
$0.1000 |
| 89 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,000 | SD |
$0.3300 |
$4.12 |
$4.15 |
$4.10 |
$0.3500 |
$4.30 |
$4.40 |
$4.20 |
$4.00 |
| 90 | 880(F) 8878 |
DRUMS | 2,500 | SD |
$0.2300 |
$0.2600 |
$0.2800 |
$0.2600 |
$0.3500 |
$0.3000 |
$0.3000 |
$0.2600 |
$0.2500 |
| 91 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 420 | SD |
$11.77 |
$10.30 |
$12.00 |
$10.30 |
$15.15 |
$12.00 |
$12.00 |
$115.50 |
$10.00 |
| 92 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 5,455 | LF |
$0.5500 |
$0.4100 |
$1.00 |
$0.4100 |
$1.05 |
$1.35 |
$0.4800 |
$0.4200 |
$0.4000 |
| 93 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$957.76 |
$515.00 |
$500.00 |
$515.00 |
$252.00 |
$500.00 |
$550.00 |
$525.00 |
$500.00 |
| 94 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 35.5 | SF |
$21.30 |
$25.75 |
$28.75 |
$25.80 |
$15.15 |
$27.00 |
$30.00 |
$26.25 |
$25.00 |
| 95 | 851(C) 8324 |
2" SQUARE TUBE POST | 58 | LF |
$9.80 |
$10.30 |
$12.00 |
$10.30 |
$5.05 |
$12.00 |
$12.00 |
$10.50 |
$10.00 |
| 96 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 17,310 | LF |
$0.6500 |
$0.4600 |
$0.4700 |
$0.4600 |
$0.4500 |
$0.5000 |
$0.5300 |
$0.4700 |
$0.4500 |
| 97 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$60,000.00 |
$28,140.00 |
$25,000.00 |
$14,985.00 |
$17,200.00 |
$28,000.00 |
$42,500.00 |
$15,277.50 |
$15,000.00 |
| 98 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,000.00 |
$3,300.00 |
$3,500.00 |
$2,961.00 |
$8,630.00 |
$3,500.00 |
$32,750.00 |
$4,200.00 |
$1,275.00 |
| 99 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$11,405.64 |
$2,750.00 |
$6,000.00 |
$3,347.00 |
$8,630.00 |
$1,500.00 |
$17,582.00 |
$12,862.50 |
$15,000.00 |
| 100 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$163,924.30 |
$121,000.00 |
$259,244.82 |
$162,510.00 |
$130,000.00 |
$125,000.00 |
$171,650.59 |
$206,000.00 |