| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$60,000.00 |
$66,500.00 |
$40,150.00 |
$47,300.00 |
$160,000.00 |
$126,989.21 |
| 2 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 25,584.1 | CY |
$14.00 |
$16.00 |
$7.40 |
$7.50 |
$10.00 |
$11.00 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 40 | CY |
$70.00 |
$122.00 |
$46.50 |
$100.00 |
$40.00 |
$18.38 |
| 4 | 202(D) 1302 |
UNCLASSIFIED BORROW | 5,286.8 | CY |
$18.00 |
$14.00 |
$14.75 |
$26.00 |
$20.00 |
$11.50 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 8,179 | LF |
$1.75 |
$1.00 |
$2.50 |
$4.00 |
$2.40 |
$2.25 |
| 6 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 30.9 | CY |
$205.00 |
$161.00 |
$60.00 |
$160.00 |
$100.00 |
$122.24 |
| 7 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 4.5 | CY |
$540.00 |
$250.00 |
$65.00 |
$260.00 |
$100.00 |
$481.11 |
| 8 | 221(K) 0600 |
TEMPORARY FIBER LOG | 1,020 | LF |
$5.25 |
$2.00 |
$5.00 |
$3.00 |
$12.00 |
$10.94 |
| 9 | 227 0300 |
(SP)TURF REINFORCEMENT MAT | 3,595 | SY |
$65.00 |
$49.50 |
$75.00 |
$55.00 |
$90.00 |
$88.42 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 28,099 | SY |
$3.50 |
$3.50 |
$4.00 |
$3.50 |
$3.50 |
$3.27 |
| 11 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 6 | EA |
$2,500.00 |
$2,175.00 |
$750.00 |
$2,000.00 |
$1,250.00 |
$9,989.34 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,993.8 | CY |
$45.00 |
$68.00 |
$71.30 |
$92.00 |
$95.00 |
$83.40 |
| 13 | 310(B) 0149 |
SUBGRADE, METHOD B | 17,962.4 | SY |
$1.90 |
$1.50 |
$4.95 |
$2.00 |
$2.00 |
$2.75 |
| 14 | 325 5271 |
SEPARATOR FABRIC | 500 | SY |
$4.00 |
$1.20 |
$2.00 |
$1.50 |
$3.00 |
$1.59 |
| 15 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 500 | SY |
$8.00 |
$1.65 |
$4.00 |
$3.00 |
$5.00 |
$1.74 |
| 16 | 509(A) 0319 |
CLASS AA CONCRETE | 78.2 | CY |
$670.00 |
$434.00 |
$695.00 |
$1,230.00 |
$900.00 |
$643.36 |
| 17 | 510(A) 6336 |
BLOCK RETAINING WALL & CAP | 2,533.8 | SF |
$40.00 |
$48.00 |
$30.00 |
$45.00 |
$75.00 |
$38.25 |
| 18 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 92.2 | TON |
$70.00 |
$67.00 |
$60.00 |
$83.00 |
$75.00 |
$95.88 |
| 19 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 96.9 | SY |
$6.00 |
$5.00 |
$40.00 |
$2.00 |
$3.00 |
$3.57 |
| 20 | 610(A) 0605 |
6" CONCRETE SIDEWALK | 14,910.3 | SY |
$48.00 |
$57.00 |
$59.75 |
$80.50 |
$60.00 |
$64.80 |
| 21 | 610(B) 0399 |
6" CONCRETE DRIVEWAY (H.E.S.) | 70 | SY |
$80.00 |
$60.00 |
$65.00 |
$103.00 |
$65.00 |
$72.92 |
| 22 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 221 | SF |
$39.00 |
$17.00 |
$27.00 |
$48.00 |
$25.00 |
$44.49 |
| 23 | 611(G) 6000 |
INLET (SMD-TYPE 1) | 1 | EA |
$3,000.00 |
$4,125.00 |
$3,000.00 |
$3,500.00 |
$3,500.00 |
$3,070.65 |
| 24 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 43 | LF |
$85.00 |
$50.00 |
$55.00 |
$83.00 |
$70.00 |
$65.95 |
| 25 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 44 | LF |
$110.00 |
$62.00 |
$63.00 |
$91.00 |
$95.00 |
$86.71 |
| 26 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 130 | LF |
$150.00 |
$115.00 |
$81.00 |
$126.00 |
$160.00 |
$140.63 |
| 27 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 112 | LF |
$85.00 |
$90.00 |
$80.00 |
$90.00 |
$100.00 |
$87.51 |
| 28 | 613(L) 4506 |
22" X 13" PREFAB. CULVERT END SEC., ARCH | 8 | EA |
$1,000.00 |
$723.00 |
$750.00 |
$1,350.00 |
$1,250.00 |
$804.95 |
| 29 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$650.00 |
$730.00 |
$750.00 |
$1,300.00 |
$1,250.00 |
$804.61 |
| 30 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$750.00 |
$863.00 |
$850.00 |
$1,350.00 |
$1,500.00 |
$959.86 |
| 31 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$850.00 |
$1,600.00 |
$1,400.00 |
$2,000.00 |
$2,900.00 |
$1,736.07 |
| 32 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$1,200.00 |
$2,950.00 |
$1,200.00 |
$2,100.00 |
$1,100.00 |
$3,587.37 |
| 33 | 615(H) 0110 |
SANITARY SEWER LINE RELOCATION | 1 | LSUM |
$20,000.00 |
$3,200.00 |
$5,500.00 |
$28,800.00 |
$16,500.00 |
$4,981.22 |
| 34 | 616(C) 0868 |
3/4" COPPER WATER SERVICE PIPE | 376.2 | LF |
$24.00 |
$9.25 |
$35.70 |
$45.00 |
$155.00 |
$44.28 |
| 35 | 619(B) 4725 |
REMOVAL OF FENCE | 289 | LF |
$10.00 |
$3.70 |
$8.00 |
$3.00 |
$10.00 |
$1.59 |
| 36 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 22 | SY |
$13.00 |
$67.00 |
$15.00 |
$27.00 |
$10.00 |
$21.69 |
| 37 | 622(A) 4746 |
PIPE RAILING | 408 | LF |
$115.00 |
$34.00 |
$95.00 |
$100.00 |
$70.00 |
$145.85 |
| 38 | 624 4100 |
(PL) ORNAMENTAL FENCE | 252 | LF |
$40.00 |
$42.00 |
$55.00 |
$33.00 |
$45.00 |
$31.55 |
| 39 | 624(E) 4293 |
FENCE-STYLE CLF (6'HIGH, CLASS B) | 180 | LF |
$27.00 |
$30.00 |
$45.00 |
$23.00 |
$30.00 |
$22.14 |
| 40 | 631(A) 0200 |
(SP)STATIONARY BOLLARD | 10 | EA |
$1,200.00 |
$683.00 |
$350.00 |
$750.00 |
$400.00 |
$666.06 |
| 41 | 631(A) 0210 |
(SP)REMOVABLE BOLLARD | 7 | EA |
$1,400.00 |
$1,450.00 |
$480.00 |
$1,500.00 |
$1,900.00 |
$1,773.56 |
| 42 | 632 0300 |
(PL) SITESCAPING | 1 | LSUM |
$24,000.00 |
$33,000.00 |
$15,985.00 |
$29,900.00 |
$50,000.00 |
$34,868.53 |
| 43 | 643 0500 |
WIRELESS SOLAR LIGHTING | 934 | EA |
$75.00 |
$53.00 |
$95.00 |
$76.00 |
$80.00 |
$91.32 |
| 44 | 805(D) 8744 |
(PL)REMOVE & RESET LIGHT POLE | 2 | EA |
$3,000.00 |
$3,800.00 |
$3,450.00 |
$2,900.00 |
$8,500.00 |
$3,486.86 |
| 45 | 829(A) 8200 |
(PL) PEDESTRIAN / CYCLIST COUNTER | 3 | EA |
$9,000.00 |
$14,300.00 |
$12,200.00 |
$8,900.00 |
$15,000.00 |
$13,117.21 |
| 46 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 58.2 | SF |
$26.00 |
$24.00 |
$30.00 |
$30.00 |
$38.00 |
$28.78 |
| 47 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 230 | LF |
$16.00 |
$18.00 |
$11.00 |
$10.00 |
$18.00 |
$9.96 |
| 48 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 2,896.5 | LF |
$2.85 |
$2.40 |
$1.67 |
$1.25 |
$3.00 |
$1.20 |
| 49 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 324 | LF |
$6.00 |
$4.75 |
$3.00 |
$2.00 |
$6.00 |
$1.66 |
| 50 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 215 | LF |
$6.00 |
$14.25 |
$3.75 |
$4.00 |
$15.00 |
$3.32 |
| 51 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 52 | EA |
$400.00 |
$360.00 |
$295.00 |
$305.00 |
$225.00 |
$293.34 |
| 52 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,000.00 |
$4,200.00 |
$10,150.00 |
$6,000.00 |
$25,000.00 |
$8,700.00 |
| 53 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$12,300.00 |
$22,200.00 |
$15,000.00 |
$60,000.00 |
$76,683.09 |
| 54 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$30,000.00 |
$538.00 |
$1,500.00 |
$2,500.00 |
$5,000.00 |
$12,872.32 |
| 55 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$173,368.00 |
$67,500.00 |
$78,200.00 |
$75,000.00 |
$150,000.00 |
$237,962.04 |
| 56 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$60,000.00 |
$14,750.00 |
$35,000.00 |
$30,000.00 |
$75,000.00 |
$69,305.79 |
| 57 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 4,911.7 | CY |
$14.00 |
$14.50 |
$8.20 |
$7.50 |
$10.00 |
$11.00 |
| 58 | 202(C) 0182 |
ROCK EXCAVATION | 40 | CY |
$70.00 |
$134.00 |
$46.50 |
$100.00 |
$40.00 |
$18.38 |
| 59 | 202(D) 1302 |
UNCLASSIFIED BORROW | 2,212.3 | CY |
$18.00 |
$14.00 |
$14.75 |
$26.00 |
$20.00 |
$11.50 |
| 60 | 221(C) 2801 |
TEMPORARY SILT FENCE | 6,126.6 | LF |
$1.75 |
$1.00 |
$2.50 |
$4.00 |
$2.40 |
$2.25 |
| 61 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 3.1 | CY |
$540.00 |
$207.00 |
$60.00 |
$260.00 |
$100.00 |
$481.37 |
| 62 | 221(K) 0600 |
TEMPORARY FIBER LOG | 120 | LF |
$5.25 |
$2.00 |
$2.50 |
$3.00 |
$12.00 |
$10.94 |
| 63 | 227 0300 |
(SP)TURF REINFORCEMENT MAT | 185.3 | SY |
$65.00 |
$49.50 |
$53.00 |
$55.00 |
$90.00 |
$88.42 |
| 64 | 230(A) 2806 |
SOLID SLAB SODDING | 8,012.3 | SY |
$3.50 |
$3.50 |
$4.50 |
$3.50 |
$3.50 |
$3.27 |
| 65 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 2 | EA |
$2,500.00 |
$2,175.00 |
$1,000.00 |
$2,000.00 |
$1,250.00 |
$9,989.34 |
| 66 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,421.8 | CY |
$45.00 |
$68.00 |
$71.30 |
$92.00 |
$95.00 |
$83.40 |
| 67 | 310(B) 0149 |
SUBGRADE, METHOD B | 8,531.6 | SY |
$1.90 |
$1.45 |
$4.95 |
$2.00 |
$2.00 |
$2.75 |
| 68 | 325 5271 |
SEPARATOR FABRIC | 500 | SY |
$4.00 |
$1.35 |
$2.00 |
$1.50 |
$3.00 |
$1.59 |
| 69 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 500 | SY |
$8.00 |
$1.65 |
$4.00 |
$3.00 |
$5.00 |
$1.74 |
| 70 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 697 | TON |
$110.00 |
$197.00 |
$176.00 |
$127.00 |
$120.00 |
$149.64 |
| 71 | 411(D) 5970 |
SUPERPAVE, TYPE S5(PG 70-28 OK) | 25.4 | TON |
$100.00 |
$306.00 |
$518.00 |
$138.00 |
$120.00 |
$235.05 |
| 72 | 412 5267 |
COLD MILLING PAVEMENT | 6,223.4 | SY |
$3.50 |
$2.50 |
$5.00 |
$5.50 |
$2.00 |
$5.51 |
| 73 | 610(A) 0605 |
6" CONCRETE SIDEWALK | 7,036.6 | SY |
$62.00 |
$57.00 |
$59.75 |
$80.50 |
$60.00 |
$64.80 |
| 74 | 610(B) 0399 |
6" CONCRETE DRIVEWAY (H.E.S.) | 130.8 | SY |
$80.00 |
$61.00 |
$65.00 |
$103.00 |
$65.00 |
$72.92 |
| 75 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 70 | SF |
$39.00 |
$16.00 |
$27.00 |
$48.00 |
$25.00 |
$44.50 |
| 76 | 611(A) 2658 |
MANHOLE (5' DIAMETER) | 1 | EA |
$3,500.00 |
$3,575.00 |
$1,900.00 |
$3,000.00 |
$3,500.00 |
$2,744.23 |
| 77 | 611(G) 6000 |
INLET (SMD-TYPE 1) | 2 | EA |
$3,000.00 |
$4,125.00 |
$3,750.00 |
$3,500.00 |
$3,500.00 |
$3,069.24 |
| 78 | 612(E) 0647 |
VALVE BOXES ADJUST TO GRADE | 1 | EA |
$500.00 |
$850.00 |
$250.00 |
$500.00 |
$300.00 |
$166.04 |
| 79 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 29 | LF |
$85.00 |
$56.00 |
$60.50 |
$83.00 |
$70.00 |
$65.97 |
| 80 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 179 | LF |
$110.00 |
$65.00 |
$65.00 |
$91.00 |
$95.00 |
$86.70 |
| 81 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 85 | LF |
$85.00 |
$90.00 |
$80.00 |
$94.00 |
$100.00 |
$87.52 |
| 82 | 613(L) 4506 |
22" X 13" PREFAB. CULVERT END SEC., ARCH | 4 | EA |
$1,000.00 |
$725.00 |
$750.00 |
$1,350.00 |
$1,250.00 |
$804.68 |
| 83 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$650.00 |
$725.00 |
$750.00 |
$1,250.00 |
$1,250.00 |
$804.61 |
| 84 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$750.00 |
$860.00 |
$850.00 |
$1,350.00 |
$1,500.00 |
$959.86 |
| 85 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$12,000.00 |
$2,500.00 |
$13,500.00 |
$11,200.00 |
$2,500.00 |
$15,482.59 |
| 86 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$900.00 |
$1,200.00 |
$750.00 |
$1,300.00 |
$1,500.00 |
$1,008.19 |
| 87 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 408 | SY |
$13.00 |
$7.00 |
$12.00 |
$21.00 |
$10.00 |
$10.85 |
| 88 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 75 | LF |
$8.00 |
$7.00 |
$10.00 |
$6.00 |
$10.00 |
$2.88 |
| 89 | 622(A) 4746 |
PIPE RAILING | 265.4 | LF |
$115.00 |
$34.00 |
$95.00 |
$98.00 |
$70.00 |
$145.69 |
| 90 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 217.3 | LF |
$75.00 |
$30.00 |
$30.00 |
$26.00 |
$30.00 |
$23.69 |
| 91 | 624 4100 |
(PL) ORNAMENTAL FENCE | 455 | LF |
$40.00 |
$42.00 |
$65.00 |
$33.00 |
$45.00 |
$31.55 |
| 92 | 631(A) 0200 |
(SP)STATIONARY BOLLARD | 4 | EA |
$1,200.00 |
$680.00 |
$350.00 |
$890.00 |
$400.00 |
$666.14 |
| 93 | 631(A) 0210 |
(SP)REMOVABLE BOLLARD | 5 | EA |
$1,400.00 |
$1,443.00 |
$480.00 |
$1,800.00 |
$1,900.00 |
$1,771.00 |
| 94 | 632 0300 |
(PL) SITESCAPING | 1 | LSUM |
$12,000.00 |
$9,250.00 |
$17,985.00 |
$8,200.00 |
$20,000.00 |
$10,515.91 |
| 95 | 643 0500 |
WIRELESS SOLAR LIGHTING | 506 | EA |
$75.00 |
$53.00 |
$95.00 |
$76.00 |
$80.00 |
$91.32 |
| 96 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 122 | SF |
$26.00 |
$24.00 |
$29.00 |
$30.00 |
$38.00 |
$28.78 |
| 97 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 290 | LF |
$16.00 |
$18.00 |
$11.00 |
$10.00 |
$18.00 |
$9.96 |
| 98 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 2,414.4 | LF |
$2.85 |
$2.40 |
$2.60 |
$2.00 |
$3.00 |
$2.32 |
| 99 | 855(B) 8824 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 25 | EA |
$400.00 |
$360.00 |
$358.00 |
$375.00 |
$350.00 |
$359.75 |
| 100 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 1,886.2 | LF |
$2.85 |
$2.40 |
$1.65 |
$1.25 |
$3.00 |
$1.20 |
| 101 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 216 | LF |
$6.00 |
$4.75 |
$2.20 |
$2.00 |
$6.00 |
$1.66 |
| 102 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 285.7 | LF |
$6.00 |
$14.00 |
$4.00 |
$4.00 |
$15.00 |
$3.32 |
| 103 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 27 | EA |
$400.00 |
$360.00 |
$295.00 |
$305.00 |
$225.00 |
$293.34 |
| 104 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,000.00 |
$4,200.00 |
$10,150.00 |
$6,000.00 |
$25,000.00 |
$8,700.00 |