| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$87,000.00 |
$98,886.15 |
$245,000.00 |
$220,000.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 94,028 | CY |
$10.00 |
$8.85 |
$8.51 |
$7.40 |
$7.50 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,000 | CY |
$14.00 |
$27.20 |
$11.92 |
$1.00 |
$7.50 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$316,000.00 |
$195,000.00 |
$181,031.14 |
$294,995.00 |
$192,000.00 |
| 50 | 210 0121 |
OBLITERATING ABANDONED ROAD | 6,661 | LF |
$22.00 |
$13.50 |
$13.33 |
$40.00 |
$9.00 |
| 60 | 221(C) 2801 |
TEMPORARY SILT FENCE | 11,455 | LF |
$3.00 |
$2.05 |
$2.10 |
$2.10 |
$2.05 |
| 70 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,624 | LF |
$15.00 |
$8.85 |
$8.95 |
$9.00 |
$9.00 |
| 80 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 5 | CY |
$125.00 |
$517.50 |
$526.85 |
$565.00 |
$275.00 |
| 90 | 230(A) 2806 |
SOLID SLAB SODDING | 253,402 | SY |
$5.00 |
$2.05 |
$2.07 |
$2.10 |
$2.20 |
| 100 | 232(B) 2814 |
SEEDING METHOD B | 47.8 | AC |
$1,400.00 |
$618.50 |
$626.53 |
$634.00 |
$650.00 |
| 110 | 233(A) 2817 |
VEGETATIVE MULCHING | 47.8 | AC |
$1,750.00 |
$618.50 |
$626.53 |
$634.00 |
$650.00 |
| 120 | 241 2832 |
MOWING | 95.6 | AC |
$60.00 |
$255.00 |
$257.98 |
$260.00 |
$275.00 |
| 130 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 4 | EA |
$2,500.00 |
$2,600.00 |
$1,524.32 |
$3,740.00 |
$2,900.00 |
| 140 | 307(K) 4300 |
STABILIZED SUBGRADE | 48,514 | SY |
$6.00 |
$7.70 |
$5.49 |
$8.50 |
$6.25 |
| 150 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 300 | TON |
$30.00 |
$97.00 |
$46.95 |
$92.41 |
$41.00 |
| 160 | 407(B) 0250 |
TACK COAT | 24,578 | GAL |
$4.00 |
$2.60 |
$3.09 |
$2.50 |
$3.00 |
| 170 | 408 5774 |
PRIME COAT | 16,368 | GAL |
$5.00 |
$6.75 |
$3.42 |
$2.50 |
$3.00 |
| 180 | 409(A) 4242 |
FABRIC REINFORCEMENT | 5,530 | SY |
$2.00 |
$4.90 |
$1.94 |
$3.10 |
$5.00 |
| 190 | 409(B) 4268 |
BITUMINOUS BINDER | 1,103 | GAL |
$3.00 |
$10.80 |
$5.99 |
$5.70 |
$12.50 |
| 200 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 12,374 | TON |
$70.00 |
$78.60 |
$92.04 |
$84.65 |
$94.00 |
| 210 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 12,904 | TON |
$75.00 |
$69.60 |
$84.04 |
$81.10 |
$88.00 |
| 220 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 8,287 | TON |
$80.00 |
$87.70 |
$98.91 |
$95.30 |
$108.00 |
| 230 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,077 | TON |
$85.00 |
$77.70 |
$94.05 |
$95.30 |
$126.00 |
| 240 | 412 5267 |
COLD MILLING PAVEMENT | 33,175 | SY |
$3.00 |
$2.60 |
$3.78 |
$1.80 |
$1.15 |
| 250 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 5 | CY |
$750.00 |
$511.00 |
$156.76 |
$1,600.00 |
$700.00 |
| 260 | 509(D) 0325 |
CLASS C CONCRETE | 381 | CY |
$450.00 |
$394.50 |
$405.90 |
$266.50 |
$390.00 |
| 270 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 38 | TON |
$66.00 |
$83.90 |
$89.98 |
$107.00 |
$91.00 |
| 280 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 13 | TON |
$55.00 |
$81.40 |
$60.62 |
$107.00 |
$125.00 |
| 290 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 120 | SY |
$75.00 |
$65.00 |
$65.14 |
$107.00 |
$120.00 |
| 300 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 3 | EA |
$2,500.00 |
$3,700.00 |
$2,346.67 |
$2,665.00 |
$4,800.00 |
| 310 | 611(L) 0487 |
JUNCTION BOXES | 333 | CF |
$75.00 |
$101.50 |
$65.43 |
$69.30 |
$107.00 |
| 320 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 314 | LF |
$70.00 |
$67.50 |
$70.91 |
$48.00 |
$105.00 |
| 330 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 325 | LF |
$80.00 |
$93.40 |
$80.36 |
$64.00 |
$122.00 |
| 340 | 613(A) 0584 |
30" R.C.PIPE CLASS IV | 242 | LF |
$90.00 |
$137.00 |
$85.37 |
$160.00 |
$144.00 |
| 350 | 613(A) 0585 |
36" R.C.PIPE CLASS IV | 150 | LF |
$110.00 |
$158.00 |
$121.33 |
$213.00 |
$169.00 |
| 352 | 613(A) 0595 |
24" R.C.PIPE CLASS V | 75 | LF |
$100.00 |
$87.30 |
$60.28 |
$69.00 |
$76.00 |
| 354 | 613(A) 0597 |
36" R.C.PIPE CLASS V | 150 | LF |
$150.00 |
$122.50 |
$108.39 |
$111.00 |
$119.00 |
| 360 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 2,514 | LF |
$35.00 |
$46.10 |
$52.39 |
$48.00 |
$64.00 |
| 370 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 230 | LF |
$40.00 |
$77.20 |
$61.85 |
$64.00 |
$81.00 |
| 380 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 3 | EA |
$1,000.00 |
$1,832.00 |
$1,619.96 |
$1,066.00 |
$1,100.00 |
| 390 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,500.00 |
$2,476.00 |
$1,806.29 |
$1,280.00 |
$2,400.00 |
| 400 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 3 | EA |
$1,550.00 |
$1,788.00 |
$1,720.23 |
$960.00 |
$1,400.00 |
| 410 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 1 | EA |
$1,700.00 |
$2,629.00 |
$2,128.96 |
$1,600.00 |
$2,100.00 |
| 420 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 3 | EA |
$2,000.00 |
$3,050.00 |
$2,809.87 |
$1,815.00 |
$2,800.00 |
| 430 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 3 | EA |
$1,600.00 |
$2,839.00 |
$1,878.73 |
$1,280.00 |
$2,100.00 |
| 440 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 3 | EA |
$1,900.00 |
$3,365.00 |
$2,268.19 |
$1,920.00 |
$2,300.00 |
| 450 | 613(V) 1180 |
TRENCH EXCAVATION | 538 | CY |
$7.00 |
$32.70 |
$3.21 |
$16.00 |
$19.00 |
| 460 | 613(W) 4500 |
24" JACKED CONDUIT | 75 | LF |
$350.00 |
$398.50 |
$742.36 |
$375.00 |
$900.00 |
| 470 | 613(W) 4504 |
36" JACKED CONDUIT | 150 | LF |
$800.00 |
$547.00 |
$984.54 |
$520.00 |
$1,200.00 |
| 480 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$100,000.00 |
$94,525.00 |
$68,975.33 |
$131,576.10 |
$30,000.00 |
| 490 | 619(B) 0291 |
REMOVAL OF HEADWALL | 21 | EA |
$500.00 |
$2,647.00 |
$553.31 |
$550.00 |
$1,200.00 |
| 500 | 619(B) 4725 |
REMOVAL OF FENCE | 22,685 | LF |
$1.00 |
$4.15 |
$1.05 |
$1.60 |
$1.10 |
| 510 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 8,453 | SY |
$5.50 |
$5.70 |
$4.76 |
$5.00 |
$4.25 |
| 520 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 100 | SY |
$25.00 |
$75.10 |
$15.96 |
$41.00 |
$20.75 |
| 530 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 70 | SY |
$15.00 |
$107.50 |
$10.73 |
$41.00 |
$21.75 |
| 540 | 619(C) 0924 |
SAWING PAVEMENT | 23,778 | LF |
$4.00 |
$1.90 |
$3.19 |
$2.60 |
$1.50 |
| 550 | 624(A) 4281 |
FENCE-STYLE WWF | 1,669 | LF |
$5.00 |
$7.90 |
$7.37 |
$6.10 |
$8.00 |
| 560 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 2,220 | LF |
$6.00 |
$5.50 |
$6.32 |
$4.25 |
$7.00 |
| 570 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 8,802 | LF |
$6.00 |
$5.80 |
$6.84 |
$4.80 |
$7.50 |
| 580 | 624(C) 4461 |
FENCE-STYLE SWF (4 SMOOTH WIRE) | 150 | LF |
$5.00 |
$5.50 |
$8.42 |
$8.00 |
$9.00 |
| 590 | 624(E) 4288 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 1,254 | LF |
$20.00 |
$43.70 |
$47.38 |
$31.50 |
$50.00 |
| 600 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 24 | EA |
$110.00 |
$234.00 |
$106.13 |
$240.00 |
$105.00 |
| 610 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 4 | EA |
$200.00 |
$286.00 |
$212.27 |
$294.00 |
$225.00 |
| 620 | 629(C) 4960 |
MAILBOX | 32 | EA |
$50.00 |
$36.40 |
$53.07 |
$37.30 |
$55.00 |
| 630 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 32 | EA |
$30.00 |
$46.80 |
$26.53 |
$48.00 |
$30.00 |
| 640 | 413(A) 4870 |
RUMBLE STRIP-CENTERLINE HMA-CON | 12,000 | LF |
$0.3000 |
$0.4200 |
$0.1900 |
$0.5500 |
$0.2000 |
| 650 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 24,000 | LF |
$0.3000 |
$0.2600 |
$0.1300 |
$0.5000 |
$0.1500 |
| 660 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 41 | EA |
$80.00 |
$88.40 |
$79.60 |
$90.60 |
$80.00 |
| 670 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$400.00 |
$260.00 |
$291.87 |
$267.00 |
$300.00 |
| 680 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 292 | SF |
$20.00 |
$26.00 |
$20.17 |
$27.00 |
$20.00 |
| 690 | 851(C) 8324 |
2" SQUARE TUBE POST | 484 | LF |
$10.00 |
$6.25 |
$8.49 |
$6.50 |
$9.00 |
| 700 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 134 | LF |
$10.00 |
$5.20 |
$3.18 |
$5.50 |
$3.25 |
| 710 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 66,133 | LF |
$0.7500 |
$0.3700 |
$0.4200 |
$0.5000 |
$0.4500 |
| 720 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 84,200 | LF |
$0.2000 |
$0.1400 |
$0.1300 |
$0.1500 |
$0.1500 |
| 730 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 40,350 | LF |
$0.2000 |
$0.2100 |
$0.0800 |
$0.2500 |
$0.1000 |
| 740 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 840 | SD |
$15.00 |
$20.80 |
$5.31 |
$21.30 |
$6.00 |
| 750 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,640 | LF |
$25.00 |
$14.70 |
$9.19 |
$15.00 |
$17.00 |
| 760 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 2,000 | LF |
$5.50 |
$2.10 |
$7.27 |
$2.15 |
$18.00 |
| 770 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,820 | SD |
$0.5000 |
$0.2600 |
$0.3200 |
$0.3000 |
$0.3500 |
| 780 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,990 | SD |
$0.8000 |
$2.35 |
$1.06 |
$2.40 |
$1.10 |
| 790 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,990 | SD |
$1.40 |
$2.35 |
$0.5300 |
$2.40 |
$0.6000 |
| 800 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 560 | SD |
$1.50 |
$3.10 |
$1.06 |
$3.20 |
$1.10 |
| 810 | 880(C) 8848 |
WING BARRICADES | 1,220 | SD |
$1.50 |
$0.0200 |
$0.1100 |
$0.0200 |
$0.1000 |
| 820 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,910 | SD |
$0.4000 |
$0.4200 |
$3.18 |
$0.4500 |
$3.50 |
| 830 | 880(F) 8878 |
DRUMS | 2,800 | SD |
$0.3000 |
$0.3100 |
$0.2700 |
$0.3000 |
$0.3000 |
| 840 | 880(G) 8890 |
CHANNELIZER CONES | 29,000 | SD |
$0.4000 |
$0.2600 |
$0.2100 |
$0.3000 |
$0.2500 |
| 842 | 880(I) 8902 |
FLAGGER | 180 | SD |
$175.00 |
$225.00 |
$218.22 |
$530.00 |
$950.00 |
| 844 | 880(W) 8800 |
PILOT CAR | 1 | LSUM |
$4,000.00 |
$15,000.00 |
$58,711.07 |
$36,765.00 |
$35,000.00 |
| 850 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 540 | SD |
$15.00 |
$16.60 |
$10.61 |
$17.00 |
$12.73 |
| 860 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$50,000.00 |
$57,970.00 |
$64,106.75 |
$89,600.00 |
$90,000.00 |
| 870 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$3,120.00 |
$9,831.83 |
$21,900.00 |
$100,000.00 |
| 880 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$30,000.00 |
$5,000.00 |
$10,484.01 |
$24,300.00 |
$35,000.00 |
| 890 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$348,000.00 |
$185,788.69 |
$360,149.66 |
$369,000.00 |
$386,000.00 |