| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$60,000.00 |
$144,000.00 |
$60,000.00 |
$160,997.50 |
$65,000.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 42,959 | CY |
$8.00 |
$8.00 |
$9.25 |
$11.20 |
$13.50 |
| 30 | 202(C) 0182 |
ROCK EXCAVATION | 500 | CY |
$20.00 |
$24.00 |
$22.50 |
$18.00 |
$42.00 |
| 40 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$12.50 |
$5.00 |
$12.50 |
$1.00 |
$16.00 |
| 50 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$125,000.00 |
$120,000.00 |
$128,825.00 |
$215,023.25 |
$25,000.00 |
| 60 | 221(C) 2801 |
TEMPORARY SILT FENCE | 45,518 | LF |
$2.00 |
$2.40 |
$3.00 |
$2.45 |
$3.50 |
| 70 | 221(F) 0100 |
TEMPORARY SILT DIKE | 4,095 | LF |
$10.00 |
$7.80 |
$8.60 |
$8.40 |
$13.00 |
| 80 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 76 | CY |
$125.00 |
$125.00 |
$125.00 |
$146.00 |
$359.00 |
| 90 | 221(K) 0600 |
TEMPORARY FIBER LOG | 196 | LF |
$6.00 |
$9.80 |
$8.00 |
$10.50 |
$15.00 |
| 100 | 228 4170 |
NYLON EROSION CONTROL MAT | 22,823 | SY |
$4.00 |
$10.80 |
$12.50 |
$11.50 |
$16.00 |
| 110 | 230(A) 2806 |
SOLID SLAB SODDING | 141,299 | SY |
$2.00 |
$2.95 |
$3.80 |
$3.10 |
$3.55 |
| 120 | 233(A) 2817 |
VEGETATIVE MULCHING | 30 | AC |
$350.00 |
$100.00 |
$2,500.00 |
$1,260.00 |
$658.00 |
| 130 | 303(A) 2200 |
(SP)AGGREGATE BASE TYPE A, PLANT MIXED | 10,227 | CY |
$78.38 |
$54.00 |
$55.60 |
$63.00 |
$60.00 |
| 140 | 307(K) 4300 |
STABILIZED SUBGRADE | 106,155 | SY |
$4.00 |
$5.35 |
$7.50 |
$6.40 |
$8.10 |
| 150 | 325 5271 |
SEPARATOR FABRIC | 106,155 | SY |
$1.00 |
$1.60 |
$2.00 |
$1.25 |
$2.00 |
| 160 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 9,445 | TON |
$25.00 |
$22.00 |
$35.00 |
$23.80 |
$33.00 |
| 170 | 407(B) 0250 |
TACK COAT | 6,883 | GAL |
$2.50 |
$2.25 |
$3.50 |
$2.50 |
$3.50 |
| 180 | 408 5774 |
PRIME COAT | 56,650 | GAL |
$2.50 |
$3.00 |
$4.00 |
$3.00 |
$4.00 |
| 190 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 20,556 | TON |
$65.00 |
$76.00 |
$73.50 |
$74.90 |
$76.00 |
| 200 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 10,030 | TON |
$70.00 |
$90.00 |
$82.50 |
$90.20 |
$85.00 |
| 210 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 92 | CY |
$23.00 |
$23.00 |
$22.00 |
$26.40 |
$21.00 |
| 220 | 509(A) 0319 |
CLASS AA CONCRETE | 222 | CY |
$475.00 |
$525.00 |
$551.00 |
$512.00 |
$533.00 |
| 230 | 509(D) 0325 |
CLASS C CONCRETE | 50 | CY |
$350.00 |
$350.00 |
$367.50 |
$317.00 |
$420.00 |
| 240 | 511(A) 0332 |
REINFORCING STEEL | 33,255 | LB |
$1.00 |
$1.50 |
$1.58 |
$1.35 |
$1.45 |
| 250 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 825 | TON |
$50.00 |
$118.00 |
$63.00 |
$64.00 |
$62.00 |
| 260 | 611(G) 5705 |
INLET CDI RCP DES. 2 | 4 | EA |
$2,500.00 |
$3,000.00 |
$3,800.00 |
$6,330.00 |
$2,697.00 |
| 270 | 611(G) 5707 |
INLET CDI RCP DES. 4 | 1 | EA |
$3,500.00 |
$5,200.00 |
$4,400.00 |
$8,440.00 |
$4,130.00 |
| 280 | 611(G) 5737 |
INLET CDI 30SK RCP DES.2 | 2 | EA |
$7,500.00 |
$7,800.00 |
$5,200.00 |
$6,330.00 |
$2,672.00 |
| 290 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 84 | LF |
$60.00 |
$72.00 |
$70.00 |
$48.00 |
$80.00 |
| 300 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 534 | LF |
$70.00 |
$90.00 |
$175.00 |
$69.00 |
$149.00 |
| 310 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 90 | LF |
$100.00 |
$121.00 |
$200.00 |
$106.00 |
$159.00 |
| 320 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 254 | LF |
$120.00 |
$137.50 |
$300.00 |
$148.00 |
$358.00 |
| 330 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 62 | LF |
$180.00 |
$187.00 |
$305.00 |
$264.00 |
$352.00 |
| 340 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 30 | LF |
$85.00 |
$99.00 |
$90.00 |
$106.00 |
$904.00 |
| 350 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 198 | LF |
$125.00 |
$140.00 |
$231.00 |
$158.00 |
$214.00 |
| 360 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 558 | LF |
$30.00 |
$46.30 |
$38.50 |
$48.00 |
$68.00 |
| 370 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 38 | LF |
$60.00 |
$77.00 |
$62.25 |
$84.00 |
$77.00 |
| 380 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 1,944 | LF |
$35.00 |
$44.00 |
$38.00 |
$48.00 |
$49.00 |
| 390 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 92 | EA |
$275.00 |
$189.20 |
$248.00 |
$369.00 |
$598.00 |
| 400 | 613(L) 4506 |
22" X 13" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$1,000.00 |
$1,375.00 |
$1,432.50 |
$369.00 |
$1,557.00 |
| 410 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 6 | EA |
$1,400.00 |
$1,650.00 |
$1,500.00 |
$1,160.00 |
$2,335.00 |
| 420 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 25 | EA |
$500.00 |
$715.00 |
$350.00 |
$422.00 |
$1,078.00 |
| 430 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 8 | EA |
$900.00 |
$1,045.00 |
$790.00 |
$369.00 |
$1,677.00 |
| 440 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,150.00 |
$1,320.00 |
$1,500.00 |
$1,160.00 |
$1,796.00 |
| 450 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 9 | EA |
$1,675.00 |
$2,200.00 |
$2,500.00 |
$1,160.00 |
$2,156.15 |
| 460 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$2,700.00 |
$3,080.00 |
$2,800.00 |
$3,165.00 |
$3,473.00 |
| 470 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$125,000.00 |
$65,000.00 |
$285,000.00 |
$62,851.66 |
| 480 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 42,019 | SY |
$2.50 |
$1.35 |
$4.25 |
$1.00 |
$5.00 |
| 490 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,900.00 |
$1,265.00 |
$1,925.00 |
$1,220.00 |
$2,500.00 |
| 500 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,850.00 |
$2,645.50 |
$2,200.00 |
$2,600.00 |
$2,600.00 |
| 510 | 624(A) 4281 |
FENCE-STYLE WWF | 1,974 | LF |
$6.00 |
$7.70 |
$7.50 |
$7.40 |
$13.00 |
| 520 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 21,599 | LF |
$6.00 |
$6.60 |
$6.10 |
$6.40 |
$8.00 |
| 530 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 7,588 | LF |
$7.00 |
$6.80 |
$6.50 |
$6.60 |
$9.00 |
| 540 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 2 | EA |
$1,000.00 |
$770.00 |
$1,200.00 |
$738.00 |
$2,500.00 |
| 550 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 43 | EA |
$200.00 |
$275.00 |
$250.00 |
$160.00 |
$150.00 |
| 560 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,700 | CY |
$10.00 |
$7.70 |
$7.00 |
$15.00 |
$7.00 |
| 570 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 151 | CY |
$17.50 |
$22.00 |
$20.00 |
$28.00 |
$18.00 |
| 580 | 509(A) 1326 |
CLASS AA CONCRETE | 297 | CY |
$575.00 |
$688.00 |
$625.00 |
$440.00 |
$688.00 |
| 590 | 511(A) 1332 |
REINFORCING STEEL | 54,650 | LB |
$1.00 |
$1.40 |
$1.25 |
$1.35 |
$1.05 |
| 600 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$70,000.00 |
$20,000.00 |
$35,500.00 |
$24,523.00 |
| 610 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 306 | CY |
$10.00 |
$16.50 |
$15.00 |
$28.00 |
$15.17 |
| 620 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$25.00 |
$22.00 |
$20.00 |
$28.00 |
$21.00 |
| 630 | 501(F) 6352 |
GRANULAR BACKFILL | 56 | CY |
$65.00 |
$110.00 |
$100.00 |
$64.00 |
$188.00 |
| 640 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 224 | LF |
$225.00 |
$407.00 |
$370.00 |
$370.00 |
$353.00 |
| 650 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$225.00 |
$242.00 |
$220.00 |
$233.00 |
$229.00 |
| 660 | 504(B) 1305 |
SAW-CUT GROOVING | 273.4 | SY |
$5.00 |
$8.70 |
$7.90 |
$7.00 |
$7.91 |
| 670 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 206.6 | LF |
$75.00 |
$104.50 |
$95.00 |
$108.00 |
$95.00 |
| 680 | 506(A) 1322 |
STRUCTURAL STEEL | 540 | LB |
$3.00 |
$5.50 |
$5.00 |
$3.30 |
$5.00 |
| 690 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$1,150.00 |
$676.50 |
$615.00 |
$1,060.00 |
$616.00 |
| 700 | 509(A) 1326 |
CLASS AA CONCRETE | 78.4 | CY |
$575.00 |
$905.30 |
$823.00 |
$792.00 |
$831.00 |
| 710 | 509(B) 1328 |
CLASS A CONCRETE | 39.2 | CY |
$550.00 |
$662.20 |
$602.00 |
$792.00 |
$603.00 |
| 720 | 511(A) 1332 |
REINFORCING STEEL | 19,810 | LB |
$1.00 |
$1.50 |
$1.36 |
$1.35 |
$1.36 |
| 730 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 450 | LF |
$29.00 |
$45.10 |
$41.00 |
$53.00 |
$41.00 |
| 740 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 450 | LF |
$15.00 |
$20.90 |
$19.00 |
$21.10 |
$19.00 |
| 750 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 760 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 380 | TON |
$42.50 |
$53.90 |
$49.00 |
$65.00 |
$49.00 |
| 770 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 90 | TON |
$34.50 |
$46.20 |
$42.00 |
$65.00 |
$57.00 |
| 780 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$27.00 |
$24.20 |
$22.00 |
$73.00 |
$18.00 |
| 790 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 30 | LF |
$103.52 |
$24.20 |
$22.00 |
$73.00 |
$18.00 |
| 800 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$24,200.00 |
$22,000.00 |
$47,000.00 |
$24,000.00 |
| 810 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 760 | CY |
$10.00 |
$10.30 |
$9.34 |
$20.00 |
$9.00 |
| 820 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 56.8 | CY |
$17.50 |
$18.70 |
$17.00 |
$28.00 |
$17.00 |
| 830 | 509(A) 1326 |
CLASS AA CONCRETE | 190.1 | CY |
$575.00 |
$577.50 |
$525.00 |
$445.00 |
$498.00 |
| 840 | 511(A) 1332 |
REINFORCING STEEL | 30,550 | LB |
$1.00 |
$1.40 |
$1.26 |
$1.35 |
$1.26 |
| 850 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$22,000.00 |
$20,000.00 |
$35,500.00 |
$20,670.00 |
| 860 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 6 | EAGP |
$750.00 |
$1,170.00 |
$750.00 |
$1,500.00 |
$898.00 |
| 870 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 9 | EA |
$75.00 |
$125.00 |
$50.00 |
$145.00 |
$60.00 |
| 880 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$200.00 |
$175.00 |
$275.00 |
$190.00 |
$329.00 |
| 890 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 221 | SF |
$24.00 |
$26.00 |
$18.50 |
$27.50 |
$22.00 |
| 900 | 850(D) 8121 |
SPECIAL SIGNS | 4 | EA |
$2,500.00 |
$2,125.00 |
$4,250.00 |
$2,450.00 |
$5,100.00 |
| 910 | 851(C) 8324 |
2" SQUARE TUBE POST | 472 | LF |
$8.00 |
$7.00 |
$9.00 |
$7.40 |
$11.00 |
| 920 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 126,376 | LF |
$0.5000 |
$0.3500 |
$0.4100 |
$0.4500 |
$0.5000 |
| 930 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 14,440 | SD |
$0.5000 |
$0.1500 |
$0.2500 |
$0.2000 |
$0.5000 |
| 940 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,160 | SD |
$1.00 |
$0.2500 |
$0.1000 |
$0.3000 |
$0.1500 |
| 950 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,160 | SD |
$1.25 |
$1.75 |
$0.2500 |
$2.00 |
$0.5000 |
| 960 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,080 | SD |
$1.50 |
$2.00 |
$2.00 |
$2.30 |
$3.00 |
| 970 | 880(C) 8848 |
WING BARRICADES | 1,440 | SD |
$2.00 |
$0.0200 |
$0.2500 |
$0.0200 |
$0.6000 |
| 980 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,240 | SD |
$0.4000 |
$0.3000 |
$2.00 |
$0.3500 |
$3.00 |
| 990 | 880(F) 8878 |
DRUMS | 4,320 | SD |
$0.0400 |
$0.0200 |
$0.1000 |
$0.0200 |
$0.2000 |
| 995 | 880(I) 8902 |
FLAGGER | 50 | SD |
$200.00 |
$10.00 |
$500.00 |
$400.00 |
$299.00 |
| 1,000 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 720 | SD |
$20.00 |
$12.00 |
$12.00 |
$13.00 |
$18.00 |
| 1,010 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$100,000.00 |
$120,000.00 |
$25,000.00 |
$194,155.00 |
$113,796.00 |
| 1,020 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$7,000.00 |
$10,000.00 |
$22,467.35 |
$10,000.00 |
| 1,030 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$16,500.00 |
$20,000.00 |
$15,000.00 |
$33,300.00 |
$9,000.00 |
| 1,040 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$320,000.00 |
$300,000.00 |
$335,000.00 |
$418,700.00 |
$550,000.00 |