Bid tab 190137

Let Jun 20, 2019 · Division 8 · Tulsa Sign up free

‹ Jun 2019 results

GRADE, DRAIN, AND SURFACE CITY STREET (EAST 86TH STREET NORTH ): AT THE INTERSECTION OF NORTH SHERIDAN ROAD , 1.2 MILES EAST OF US -75 NEAR OWASSO . PROJECT LENGTH = 0.619 MILE

Let date
Thursday, June 20, 2019
Contract
190137
J/P numbers
32203(04)
District
Division 8
County
Tulsa
Highway
Limits
GRADE, DRAIN, AND SURFACE CITY STREET (EAST 86TH STREET NORTH ): AT THE INTERSECTION OF NORTH SHERIDAN ROAD , 1.2 MILES EAST OF US -75 NEAR OWASSO . PROJECT LENGTH = 0.619 MILE
Project number
STP-272C(261)CI

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$2,078,081
1 Paragon Contractors, LLC Low bidder $2,081,180 +0.1%
2 RRY SERVICES, LLC / GRADE LINE CONSTRUCTION, LLC JV $2,135,503 +2.8% +2.6%
3 BECCO CONTRACTORS, INC. $2,167,000 +4.3% +4.1%
4 CROSSLAND HEAVY CONTRACTORS INC. $2,191,000 +5.4% +5.3%
5 APAC-CENTRAL, INC. $2,249,000 +8.2% +8.1%
6 SHERWOOD CONSTRUCTION CO., INC. $2,363,514 +13.7% +13.6%

Bid tab: unit prices 94 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Paragon Contrac…#2 RRY SERVICES, L…#3 BECCO CONTRACTO…#4 CROSSLAND HEAVY…#5 APAC-CENTRAL, I…#6 SHERWOOD CONSTR…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $20,000.00 $20,500.00 $18,000.00 $67,000.00 $57,965.02 $15,000.00 $50,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION9,056CY $9.00 $14.00 $16.00 $15.00 $16.00 $12.75 $16.48
3202(D) 0184 UNCLASSIFIED BORROW1,637CY $12.50 $16.00 $20.00 $15.00 $17.25 $14.10 $16.48
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $29,000.00 $35,000.00 $20,000.00 $27,000.00 $12,000.00 $25,500.00 $24,229.11
5221(C) 2801 TEMPORARY SILT FENCE8,228LF $1.50 $3.00 $2.00 $3.00 $1.00 $3.00 $3.50
6221(F) 0100 TEMPORARY SILT DIKE1,680LF $7.80 $19.00 $8.00 $19.00 $5.65 $19.00 $21.00
7230(A) 2806 SOLID SLAB SODDING11,979SY $2.25 $7.00 $4.00 $7.00 $4.00 $7.00 $7.50
8232(B) 2814 SEEDING METHOD B4.95AC $332.00 $3,000.00 $800.00 $3,000.00 $3,200.00 $3,000.00 $3,000.00
9233(A) 2817 VEGETATIVE MULCHING2.48AC $266.00 $2,500.00 $800.00 $2,500.00 $4,000.00 $2,500.00 $2,500.00
10241 2832 MOWING4.95AC $85.00 $600.00 $50.00 $300.00 $110.00 $600.00 $600.00
11307(K) 4300 STABILIZED SUBGRADE24,027SY $7.00 $5.55 $5.95 $6.50 $6.75 $8.40 $5.55
12402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E26TON $37.00 $23.00 $40.00 $20.00 $25.50 $35.00 $45.00
13407(B) 0250 TACK COAT8,166GAL $3.00 $1.50 $2.50 $3.00 $3.00 $2.00 $7.23
14408 5774 PRIME COAT8,421GAL $3.50 $1.50 $2.50 $1.00 $3.00 $4.00 $0.2500
15411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)9,418TON $75.00 $60.00 $58.05 $60.00 $68.00 $69.25 $71.21
16411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)2,327TON $85.00 $80.00 $76.45 $70.00 $83.00 $89.90 $98.82
17414(A) 0210 P.C.CONCRETE PAVEMENT(PLACEMENT)161SY $56.00 $28.00 $55.00 $200.00 $25.00 $69.00 $53.32
18414(G) 5275 P.C. CONCRETE FOR PAVEMENT36CY $200.00 $138.00 $200.00 $125.00 $140.00 $120.00 $126.40
19509(D) 0325 CLASS C CONCRETE13CY $366.00 $375.00 $360.00 $600.00 $475.00 $120.00 $200.00
20609(A) 0380 CONCRETE CURB (8" BARRIER-INTEGRAL)85LF $23.00 $44.00 $20.00 $10.00 $19.00 $21.50 $18.46
21609(B) 1526 2'-8" COMB. CURB & GUTTER (8" BARRIER)3,568LF $32.00 $28.00 $37.00 $22.00 $17.50 $22.30 $25.57
22610(A) 0602 4" CONCRETE SIDEWALK344SY $59.00 $45.00 $55.00 $55.00 $48.00 $53.00 $44.05
23610(B) 0604 6" CONCRETE DRIVEWAY93SY $70.00 $61.00 $75.00 $100.00 $54.00 $92.00 $79.35
24610(I) 4610 TACTILE WARNING DEVICE-NEW64SF $30.00 $19.00 $30.00 $40.00 $14.00 $14.00 $17.46
25611(A) 2657 MANHOLE (4' DIAMETER)4EA $2,237.00 $3,200.00 $4,000.00 $2,700.00 $2,300.00 $3,200.00 $2,236.76
26611(G) 5113 INLET CI DES. 2 (B)1EA $4,990.00 $4,400.00 $4,800.00 $4,500.00 $4,900.00 $5,300.00 $3,348.68
27611(G) 5115 INLET CI DES. 2 (D)2EA $5,660.00 $5,400.00 $5,500.00 $4,800.00 $5,700.00 $6,400.00 $3,873.20
28611(G) 5117 INLET CI DES. 2 (2B)1EA $5,040.00 $6,500.00 $5,500.00 $4,900.00 $5,600.00 $6,400.00 $3,873.20
29611(G) 5952 INLET W/SMALL JCT. BOX, CI, DES.1(A)1EA $7,500.00 $4,400.00 $5,900.00 $4,700.00 $4,200.00 $6,200.00 $3,266.43
30611(G) 5972 INLET W/SMALL JCT. BOX, CI, DES.2(B)1EA $8,000.00 $7,000.00 $7,200.00 $5,700.00 $5,700.00 $7,100.00 $4,427.37
31611(G) 5974 INLET W/SMALL JCT. BOX, CI, DES.2(D)1EA $8,600.00 $7,500.00 $7,800.00 $6,500.00 $6,900.00 $7,600.00 $4,951.89
32611(H) 5325 ADD'L DEPTH IN INLET CI DES. 24.09VF $265.00 $273.00 $500.00 $200.00 $150.00 $140.00 $167.20
33611(H) 5952 ADD'L DEPTH IN INLET W/SJB, CI, DES. 1(A)1.93VF $300.00 $113.00 $380.00 $400.00 $105.00 $100.00 $120.01
34611(H) 5972 ADD'L DEPTH IN INLET W/SJB, CI, DES. 2(B)1.98VF $300.00 $273.00 $740.00 $400.00 $255.00 $250.00 $288.55
35611(H) 5974 ADD'L DEPTH IN INLET W/SJB, CI, DES. 2(D)2.02VF $300.00 $273.00 $740.00 $400.00 $255.00 $250.00 $288.55
36613(A) 0491 18" R.C.PIPE CLASS III401LF $67.00 $64.00 $85.00 $67.00 $90.00 $50.00 $75.44
37613(A) 0492 24" R.C.PIPE CLASS III419LF $78.00 $70.00 $90.00 $75.00 $92.00 $55.00 $82.65
38613(B) 4530 42" X 29" CORR. GALV. STEEL PIPE ARCH42LF $69.00 $83.00 $75.00 $125.00 $102.00 $90.00 $134.77
39613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND1EA $796.00 $782.00 $900.00 $700.00 $695.00 $625.00 $798.81
40613(M) 7196 TYPE A6 CULVERT END TREATMENT1EA $1,300.00 $3,024.00 $1,800.00 $1,300.00 $6,500.00 $2,650.00 $1,202.91
41613(M) 7197 TYPE B6 CULVERT END TREATMENT1EA $1,765.00 $3,024.00 $2,100.00 $1,400.00 $7,000.00 $2,825.00 $1,877.09
42613(S) 1186 STANDARD BEDDING MATERIAL, CLASS B294CY $64.00 $34.00 $40.00 $50.00 $33.00 $34.00 $78.56
43613(V) 1180 TRENCH EXCAVATION594CY $9.50 $26.00 $16.00 $7.00 $9.75 $20.50 $12.86
44615(A) 6130 16" POLYVINYL CHLORIDE (PVC) PIPE58LF $70.00 $78.00 $85.00 $110.00 $54.00 $70.00 $96.93
45619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $19,400.00 $12,000.00 $35,000.00 $6,500.00 $75,000.00 $24,000.00 $13,475.36
46619(B) 4725 REMOVAL OF FENCE2,057LF $2.00 $3.00 $2.50 $5.00 $2.00 $3.00 $1.70
47619(B) 4727 REMOVAL OF CONCRETE PAVEMENT657SY $9.30 $10.00 $10.00 $5.00 $6.75 $9.50 $7.00
48619(B) 4728 REMOVAL OF ASPHALT PAVEMENT7,949SY $5.00 $5.00 $13.00 $5.00 $5.50 $4.50 $7.72
49619(B) 5918 REMOVAL OF EXISTING PIPE303LF $11.00 $15.00 $20.00 $5.00 $11.75 $14.00 $26.25
50619(C) 0924 SAWING PAVEMENT1,902LF $3.00 $1.00 $2.00 $5.00 $2.50 $3.00 $1.93
51805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS8EA $69.00 $53.00 $50.00 $55.00 $55.00 $50.00 $61.90
52850(A) 8110 SHEET ALUMINUM SIGNS67SF $25.00 $13.00 $12.50 $14.00 $14.00 $13.00 $15.47
53851(C) 8327 2 1/4" SQUARE TUBE POST124LF $8.00 $5.25 $5.00 $5.50 $5.50 $5.00 $6.19
54853 9024 DELINEATORS(TYPE 1, CODE 1)10EA $24.00 $16.00 $15.00 $20.00 $16.50 $15.00 $18.57
55855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)16,774LF $0.9000 $0.5500 $0.5000 $0.5500 $0.5500 $0.5000 $0.6200
56855(A) 8825 TRAFFIC STRIPE(PLASTIC)(24" WIDE)476.4LF $7.00 $5.30 $5.00 $6.00 $5.50 $5.00 $6.19
57855(B) 8818 TRAFFIC STRIPE(PLASTIC)(ARROWS)22EA $106.00 $106.00 $100.00 $150.00 $110.00 $100.00 $123.80
58857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)6,904LF $0.3000 $0.3000 $0.2500 $0.3000 $0.2600 $0.2500 $0.3100
59857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)7,695LF $1.00 $1.30 $1.25 $1.30 $1.35 $1.25 $1.55
60857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)5,351LF $0.5000 $0.1200 $0.1000 $0.1000 $0.1000 $0.1000 $0.1200
61880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF5,062SD $0.2000 $0.1200 $0.1100 $0.1000 $0.1000 $0.1000 $0.1200
62880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF1,652SD $0.5000 $1.05 $1.08 $1.10 $1.10 $1.00 $1.24
63880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF3,296SD $1.00 $1.60 $1.62 $2.00 $1.60 $1.50 $1.86
64880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)2,402SD $1.00 $2.15 $2.16 $3.00 $2.10 $2.00 $2.48
65880(D) 8854 VERTICAL PANELS3,270SD $0.2500 $0.3000 $0.2700 $0.3000 $0.2600 $0.2500 $0.3100
66880(E) 8860 WARNING LIGHTS(TYPE A)8,100SD $0.2500 $0.1200 $0.1100 $0.1000 $0.1000 $0.1000 $0.1200
67880(F) 8878 DRUMS8,404SD $0.3000 $0.3000 $0.2700 $0.3000 $0.2600 $0.2500 $0.3100
68882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN28SD $34.00 $58.00 $59.40 $60.00 $58.00 $55.00 $68.09
69802(B) 8342 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED58LF $9.00 $10.00 $10.00 $11.00 $22.50 $10.00 $12.38
70802(B) 8344 3" PVC SCH.40 PLASTIC CONDUIT BORED242LF $33.00 $42.00 $40.00 $42.00 $81.00 $40.00 $49.52
71802(B) 8346 3" PVC SCH.40 PLASTIC CONDUIT TRENCHED124LF $11.00 $16.00 $15.00 $16.00 $25.00 $15.00 $18.57
72803(A) 8066 PULL BOX(SIZE II)4EA $614.00 $849.00 $800.00 $825.00 $1,135.00 $800.00 $990.38
73804(A) 2915 STRUCTURAL CONCRETE25CY $709.00 $902.00 $850.00 $900.00 $940.00 $850.00 $1,052.28
74804(B) 2916 REINFORCING STEEL3,562LB $1.80 $1.35 $1.25 $2.00 $2.25 $1.25 $1.55
75806(A) 8311 32'MH POLE 35'TS & 10'LMA(G.STL.)2EA $8,500.00 $15,205.38 $15,050.00 $15,300.00 $21,000.00 $15,500.00 $18,631.54
76806(A) 8313 32'MH POLE 45'TS & 10'LMA(G.STL.)2EA $13,430.00 $23,600.00 $22,250.00 $22,500.00 $29,000.00 $22,500.00 $27,544.96
77809(A) 8090 ROADWAY LUMINAIRE4EA $1,130.00 $530.00 $500.00 $525.00 $1,050.00 $500.00 $618.99
78810(A) 3118 SERVICE POLE1EA $1,570.00 $530.00 $500.00 $525.00 $1,110.00 $500.00 $618.99
79811 8040 1/C NO.6 ELECTRICAL CONDUCTOR299LF $1.80 $2.15 $2.00 $3.00 $3.00 $2.00 $2.48
80811 8044 1/C NO.10 ELECTRICAL CONDUCTOR886LF $1.20 $1.05 $1.00 $2.00 $1.50 $1.00 $1.24
81825 8550 TRAFFIC SIGNAL CONTROLLER ASSEMBLY1EA $18,650.00 $27,800.00 $26,115.00 $27,000.00 $45,000.00 $26,500.00 $32,329.73
82828 8132 (PL)DETECTION SYSTEM (VIDEO)1LSUM $27,100.00 $47,800.00 $45,000.00 $46,000.00 $50,000.00 $46,000.00 $55,708.90
83830 8000 PEDESTRIAN PUSH BUTTON8EA $705.00 $372.00 $350.00 $375.00 $920.00 $350.00 $433.29
84831 8231 1WAY 3SEC. ADJ. SIG. HD. S-68EA $646.00 $796.00 $750.00 $775.00 $910.00 $800.00 $928.48
85831 8280 1WAY 4SEC. ADJ. SIG. HD.S-132EA $860.00 $955.00 $900.00 $925.00 $1,095.00 $900.00 $1,114.18
86831 8295 1WAY 2SEC. ADJ. PED. SIG. HD. S-208EA $530.00 $636.00 $600.00 $625.00 $740.00 $600.00 $742.78
87833 3030 BACKPLATE10EA $140.00 $159.00 $150.00 $155.00 $280.00 $150.00 $185.70
88834(A) 8207 5/C TRAFFIC SIGNAL ELECTRICAL CABLE2,080LF $2.00 $3.70 $3.50 $4.00 $2.25 $3.50 $4.33
89834(A) 8208 7/C TRAFFIC SIGNAL ELECTRICAL CABLE168LF $2.50 $4.50 $4.25 $5.00 $2.70 $4.50 $5.26
90834(A) 8213 21/C TRAFFIC SIGNAL ELECTRICAL CABLE556LF $5.00 $5.30 $5.00 $6.00 $7.25 $5.25 $6.19
91850(C) 8118 MAST ARM MOUNTED SIGNS(ALUMINUM)79SF $53.00 $70.00 $65.00 $68.00 $60.00 $65.00 $80.46
92642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $25,000.00 $23,000.00 $11,488.00 $29,053.00 $13,000.00 $20,000.00 $34,407.64
93220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $4,400.00 $4,200.00 $1,275.00 $15,000.00 $630.00 $20,000.00 $2,500.00
94641 1552 MOBILIZATION1LSUM $105,000.00 $125,000.00 $132,000.00 $133,000.00 $48,000.00 $132,998.15 $94,543.64