| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$60,000.00 |
$50,664.20 |
$56,468.19 |
$21,000.00 |
$18,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 29,415 | CY |
$7.00 |
$10.00 |
$10.00 |
$10.00 |
$5.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 332 | CY |
$11.00 |
$5.00 |
$8.00 |
$12.00 |
$15.00 |
| 4 | 202(E) 0186 |
SELECT BORROW | 11 | CY |
$30.00 |
$50.00 |
$15.00 |
$25.00 |
$25.00 |
| 5 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$80,000.00 |
$40,000.00 |
$30,000.00 |
$60,000.00 |
$25,000.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 10,113 | LF |
$3.00 |
$1.00 |
$1.15 |
$2.10 |
$1.99 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,927 | LF |
$8.00 |
$10.00 |
$6.00 |
$10.55 |
$9.95 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 107,731 | SY |
$1.30 |
$1.00 |
$2.00 |
$1.90 |
$1.79 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 19.14 | AC |
$200.00 |
$1,200.00 |
$2,700.00 |
$3,135.00 |
$2,950.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 71 | AC |
$500.00 |
$1,200.00 |
$1,600.00 |
$1,540.00 |
$1,450.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 10,826 | CY |
$35.00 |
$32.00 |
$33.50 |
$45.00 |
$21.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 44,858 | SY |
$5.00 |
$4.00 |
$6.75 |
$6.15 |
$6.60 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 55,479 | SY |
$2.00 |
$1.00 |
$1.00 |
$1.00 |
$1.75 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 3,230 | TON |
$30.00 |
$10.00 |
$28.00 |
$18.00 |
$15.03 |
| 15 | 409(A) 4242 |
FABRIC REINFORCEMENT | 13,522 | SY |
$2.00 |
$1.00 |
$3.15 |
$1.60 |
$2.00 |
| 16 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 7,746 | TON |
$75.00 |
$59.00 |
$76.50 |
$79.00 |
$76.56 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 860 | TON |
$75.00 |
$60.00 |
$67.25 |
$106.00 |
$74.44 |
| 18 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 6,084 | TON |
$85.00 |
$65.00 |
$82.75 |
$75.00 |
$71.46 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,731 | TON |
$80.00 |
$64.00 |
$77.25 |
$87.00 |
$67.10 |
| 20 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 11,028 | SY |
$20.00 |
$25.00 |
$11.75 |
$24.00 |
$40.00 |
| 21 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 2,610 | CY |
$140.00 |
$125.00 |
$140.00 |
$130.00 |
$125.00 |
| 22 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 51 | CY |
$15.00 |
$35.00 |
$30.00 |
$31.00 |
$25.00 |
| 23 | 509(A) 0319 |
CLASS AA CONCRETE | 107.9 | CY |
$500.00 |
$600.00 |
$630.00 |
$512.00 |
$900.00 |
| 24 | 509(D) 0325 |
CLASS C CONCRETE | 116 | CY |
$250.00 |
$530.00 |
$480.00 |
$421.00 |
$500.00 |
| 25 | 510(C) 6134 |
SLOPE WALL (4") | 13 | SY |
$175.00 |
$350.00 |
$90.00 |
$421.00 |
$500.00 |
| 26 | 511(A) 0332 |
REINFORCING STEEL | 17,079 | LB |
$1.00 |
$1.00 |
$0.8000 |
$0.6000 |
$5.00 |
| 27 | 601(D) 0540 |
TYPE II SPECIAL PLAIN RIPRAP | 36 | TON |
$20.00 |
$45.00 |
$45.00 |
$38.00 |
$30.00 |
| 28 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 4,395 | LF |
$10.00 |
$6.00 |
$11.50 |
$12.00 |
$8.00 |
| 29 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 3,696 | LF |
$20.00 |
$18.00 |
$18.00 |
$18.00 |
$40.00 |
| 30 | 610(A) 0605 |
6" CONCRETE SIDEWALK | 58 | SY |
$55.00 |
$95.00 |
$50.00 |
$72.00 |
$85.00 |
| 31 | 610(B) 5016 |
8" CONCRETE DRIVEWAY | 205 | SY |
$50.00 |
$100.00 |
$65.00 |
$72.00 |
$100.00 |
| 32 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 8 | EA |
$2,000.00 |
$3,000.00 |
$3,100.00 |
$2,740.00 |
$5,600.00 |
| 33 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 9 | EA |
$4,000.00 |
$4,500.00 |
$4,200.00 |
$3,090.00 |
$3,400.00 |
| 34 | 611(G) 6000 |
INLET (SMD-TYPE 1) | 2 | EA |
$2,500.00 |
$3,500.00 |
$3,000.00 |
$2,675.00 |
$3,400.00 |
| 35 | 611(H) 5320 |
ADD'L DEPTH IN INLET CI DES. 1 | 5.65 | VF |
$400.00 |
$300.00 |
$150.00 |
$154.00 |
$285.00 |
| 36 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 1,334.5 | LF |
$40.00 |
$75.00 |
$55.00 |
$55.00 |
$38.72 |
| 37 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 287.5 | LF |
$50.00 |
$77.00 |
$68.00 |
$70.00 |
$44.97 |
| 38 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 47 | LF |
$100.00 |
$85.00 |
$100.00 |
$94.00 |
$55.54 |
| 39 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 70 | LF |
$120.00 |
$90.00 |
$103.00 |
$116.00 |
$60.86 |
| 40 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 306 | LF |
$80.00 |
$120.00 |
$123.00 |
$131.00 |
$84.47 |
| 41 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 70 | LF |
$30.00 |
$60.00 |
$52.00 |
$43.00 |
$33.93 |
| 42 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 549 | LF |
$35.00 |
$63.00 |
$70.00 |
$47.00 |
$42.39 |
| 43 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 8,396 | LF |
$8.00 |
$5.00 |
$7.00 |
$9.75 |
$12.00 |
| 44 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 2,798.67 | LF |
$11.00 |
$5.00 |
$7.00 |
$9.75 |
$10.00 |
| 45 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,400.00 |
$1,000.00 |
$1,150.00 |
$1,045.00 |
$933.00 |
| 46 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 10 | EA |
$1,300.00 |
$1,200.00 |
$1,590.00 |
$1,355.00 |
$1,275.80 |
| 47 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$500.00 |
$700.00 |
$680.00 |
$652.00 |
$438.00 |
| 48 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 3 | EA |
$850.00 |
$800.00 |
$790.00 |
$758.00 |
$581.67 |
| 49 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 1 | EA |
$1,180.00 |
$1,500.00 |
$1,035.00 |
$2,656.00 |
$2,500.00 |
| 50 | 613(P) 4571 |
28" X 20" GALV. STEEL CULVERT END SECTION ARCH | 30 | EA |
$275.00 |
$300.00 |
$313.00 |
$243.00 |
$284.00 |
| 51 | 613(P) 7025 |
21" X 15" GALV. STEEL CULVERT END SECTION ARCH | 4 | EA |
$270.00 |
$200.00 |
$275.00 |
$199.00 |
$190.00 |
| 52 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$4,000.00 |
$142,000.00 |
$70,000.00 |
$47,000.00 |
$7,500.00 |
| 53 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 77 | LF |
$3.50 |
$10.00 |
$3.50 |
$8.00 |
$10.00 |
| 54 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 56 | SY |
$6.50 |
$10.00 |
$11.00 |
$13.00 |
$6.00 |
| 55 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 414 | SY |
$3.50 |
$10.00 |
$7.00 |
$7.00 |
$3.00 |
| 56 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 58 | SY |
$5.00 |
$10.00 |
$10.00 |
$10.00 |
$15.00 |
| 57 | 619(B) 4821 |
REMOVAL OF CONCRETE SLOPE PROTECTION | 11 | SY |
$10.50 |
$20.00 |
$15.00 |
$34.00 |
$18.00 |
| 58 | 619(C) 0924 |
SAWING PAVEMENT | 10,737 | LF |
$4.00 |
$1.25 |
$3.10 |
$2.00 |
$5.50 |
| 59 | 624(A) 4281 |
FENCE-STYLE WWF | 709 | LF |
$8.00 |
$5.00 |
$14.75 |
$7.30 |
$4.60 |
| 60 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 7,492 | LF |
$5.00 |
$5.00 |
$8.75 |
$7.15 |
$4.05 |
| 61 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 8 | EA |
$880.00 |
$1,000.00 |
$1,670.00 |
$903.00 |
$800.00 |
| 62 | 624(E) 4288 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 325 | LF |
$20.00 |
$35.00 |
$22.70 |
$13.50 |
$30.00 |
| 63 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 29 | EA |
$80.00 |
$110.00 |
$112.00 |
$107.00 |
$100.00 |
| 64 | 629(C) 4960 |
MAILBOX | 29 | EA |
$30.00 |
$50.00 |
$43.00 |
$37.00 |
$35.00 |
| 65 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 29 | EA |
$25.00 |
$70.00 |
$15.00 |
$11.00 |
$10.00 |
| 66 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 120 | CY |
$25.00 |
$30.00 |
$16.00 |
$16.00 |
$20.00 |
| 67 | 501(G) 6309 |
CLSM BACKFILL | 70 | CY |
$100.00 |
$125.00 |
$115.00 |
$159.00 |
$120.00 |
| 68 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 278.67 | LF |
$220.00 |
$260.00 |
$190.00 |
$255.00 |
$500.00 |
| 69 | 504(A) 1304 |
APPROACH SLAB | 141.6 | SY |
$180.00 |
$180.00 |
$171.00 |
$233.00 |
$200.00 |
| 70 | 504(B) 1305 |
SAW-CUT GROOVING | 333.4 | SY |
$4.50 |
$10.00 |
$13.15 |
$9.35 |
$8.80 |
| 71 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 196.6 | LF |
$90.00 |
$75.00 |
$91.00 |
$101.00 |
$100.00 |
| 72 | 506(A) 1322 |
STRUCTURAL STEEL | 390 | LB |
$3.50 |
$10.00 |
$6.70 |
$3.70 |
$5.00 |
| 73 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$750.00 |
$1,500.00 |
$565.00 |
$318.00 |
$300.00 |
| 74 | 509(A) 1326 |
CLASS AA CONCRETE | 91.8 | CY |
$600.00 |
$800.00 |
$785.00 |
$717.00 |
$500.00 |
| 75 | 509(B) 1328 |
CLASS A CONCRETE | 44.6 | CY |
$625.00 |
$800.00 |
$575.00 |
$717.00 |
$500.00 |
| 76 | 511(A) 1332 |
REINFORCING STEEL | 21,270 | LB |
$1.00 |
$1.00 |
$0.8000 |
$1.15 |
$1.00 |
| 77 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 228 | LF |
$30.00 |
$50.00 |
$36.00 |
$42.00 |
$35.00 |
| 78 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 228 | LF |
$15.00 |
$15.00 |
$110.00 |
$11.00 |
$17.00 |
| 79 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 80 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 530 | TON |
$30.00 |
$30.00 |
$27.00 |
$39.00 |
$30.00 |
| 81 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 135 | TON |
$30.00 |
$30.00 |
$32.00 |
$28.00 |
$25.00 |
| 82 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 64 | LF |
$20.00 |
$20.00 |
$8.50 |
$32.00 |
$40.00 |
| 83 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 72 | LF |
$20.00 |
$20.00 |
$11.00 |
$32.00 |
$30.00 |
| 84 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 570 | CY |
$8.00 |
$30.00 |
$12.15 |
$10.00 |
$5.00 |
| 85 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 61 | CY |
$15.00 |
$30.00 |
$15.00 |
$32.00 |
$25.00 |
| 86 | 509(A) 1326 |
CLASS AA CONCRETE | 144 | CY |
$600.00 |
$600.00 |
$662.00 |
$415.00 |
$500.00 |
| 87 | 511(A) 1332 |
REINFORCING STEEL | 16,070 | LB |
$1.00 |
$1.00 |
$0.8000 |
$0.6500 |
$0.7500 |
| 88 | 601(D) 1357 |
TYPE II SPECIAL PLAIN RIPRAP | 60 | TON |
$55.00 |
$45.00 |
$47.00 |
$46.70 |
$30.00 |
| 89 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 150 | LF |
$15.00 |
$20.00 |
$24.00 |
$22.30 |
$18.50 |
| 90 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$2,000.00 |
$2,050.00 |
$1,912.00 |
$1,575.00 |
| 91 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,100.00 |
$2,500.00 |
$2,880.00 |
$2,656.00 |
$2,350.00 |
| 92 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 9 | EA |
$150.00 |
$200.00 |
$173.00 |
$159.00 |
$150.00 |
| 93 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 95.73 | SF |
$18.00 |
$20.00 |
$15.70 |
$15.00 |
$14.00 |
| 94 | 851(C) 8324 |
2" SQUARE TUBE POST | 330 | LF |
$8.00 |
$7.00 |
$7.85 |
$7.45 |
$7.00 |
| 95 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 21 | EA |
$20.00 |
$25.00 |
$22.40 |
$21.25 |
$15.00 |
| 96 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 62,492 | LF |
$0.5000 |
$0.4500 |
$0.4500 |
$0.4500 |
$0.4100 |
| 97 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 9 | EA |
$180.00 |
$300.00 |
$224.00 |
$212.00 |
$200.00 |
| 98 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$35,000.00 |
$5,000.00 |
$7,000.00 |
$7,200.00 |
| 99 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$65,000.00 |
$10,000.00 |
$80,000.00 |
$27,500.00 |
| 100 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$7,500.00 |
$500.00 |
$10,538.88 |
$5,500.00 |
| 101 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$238,210.00 |
$245,000.00 |
$200,000.00 |
$270,000.00 |
$645,800.00 |