| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 13 | CY |
$20.00 |
$22.00 |
$16.40 |
$72.00 |
$110.00 |
$25.00 |
$50.00 |
| 2 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 25 | CY |
$70.00 |
$98.00 |
$23.61 |
$60.00 |
$110.00 |
$90.00 |
$258.50 |
| 3 | 310(B) 0149 |
SUBGRADE, METHOD B | 544 | SY |
$10.00 |
$3.25 |
$5.25 |
$6.18 |
$4.00 |
$5.00 |
$11.80 |
| 4 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3 | TON |
$300.00 |
$182.00 |
$63.37 |
$300.00 |
$315.00 |
$200.00 |
$415.00 |
| 5 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 300 | LF |
$10.00 |
$28.00 |
$11.41 |
$34.26 |
$14.00 |
$30.00 |
$28.10 |
| 6 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 404 | SY |
$60.00 |
$55.00 |
$48.79 |
$67.44 |
$57.00 |
$65.00 |
$47.70 |
| 7 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 20 | SF |
$20.00 |
$23.00 |
$23.61 |
$27.72 |
$38.00 |
$30.00 |
$32.00 |
| 8 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 90 | SY |
$2.50 |
$12.00 |
$9.18 |
$12.46 |
$33.00 |
$10.00 |
$13.00 |
| 9 | 619(B) 4791 |
REMOVAL OF CURB | 261 | LF |
$2.50 |
$2.00 |
$10.49 |
$5.73 |
$15.00 |
$10.00 |
$19.00 |
| 10 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 404 | SY |
$7.50 |
$8.75 |
$13.12 |
$14.81 |
$29.00 |
$10.00 |
$9.00 |
| 11 | 619(C) 0924 |
SAWING PAVEMENT | 300 | LF |
$2.00 |
$3.25 |
$3.93 |
$5.56 |
$6.00 |
$5.00 |
$7.50 |
| 12 | 622(A) 4743 |
1 1/2" PIPE RAILING | 78 | LF |
$35.00 |
$205.00 |
$206.22 |
$278.62 |
$155.00 |
$110.00 |
$215.00 |
| 13 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 15 | SF |
$25.00 |
$36.00 |
$38.04 |
$30.00 |
$43.00 |
$42.00 |
$40.50 |
| 14 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 20 | LF |
$11.00 |
$7.50 |
$7.87 |
$18.00 |
$9.00 |
$30.00 |
$8.40 |
| 15 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 64 | LF |
$8.00 |
$31.75 |
$33.45 |
$12.00 |
$38.00 |
$15.00 |
$35.60 |
| 16 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$3,541.32 |
$4,800.00 |
$4,000.00 |
$10,000.00 |
$3,629.00 |
| 17 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$3,000.00 |
$7,500.00 |
$6,951.48 |
$2,627.92 |
$10,000.00 |
$6,000.00 |
$6,979.00 |
| 18 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$20,000.00 |
$8,002.75 |
$26,559.89 |
$16,441.82 |
$10,000.00 |
$50,000.00 |
$26,463.00 |
| 19 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$852.54 |
$7,196.16 |
$4,000.00 |
$20,000.00 |
$7,215.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 14 | CY |
$7.00 |
$22.00 |
$16.40 |
$72.00 |
$110.00 |
$25.00 |
$142.00 |
| 21 | 202(D) 0184 |
UNCLASSIFIED BORROW | 335 | CY |
$8.50 |
$30.00 |
$13.12 |
$50.84 |
$40.00 |
$35.00 |
$69.60 |
| 22 | 205(A) 4230 |
TYPE A-SALVAGED TOPSOIL | 135 | CY |
$8.50 |
$18.00 |
$19.67 |
$51.68 |
$41.00 |
$20.00 |
$34.00 |
| 23 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,578 | LF |
$1.00 |
$1.00 |
$5.18 |
$2.52 |
$2.50 |
$2.00 |
$8.30 |
| 24 | 230(A) 2806 |
SOLID SLAB SODDING | 1,025 | SY |
$1.00 |
$6.50 |
$9.12 |
$5.56 |
$4.00 |
$3.00 |
$10.00 |
| 25 | 310(B) 0149 |
SUBGRADE, METHOD B | 860 | SY |
$5.00 |
$3.25 |
$5.25 |
$7.82 |
$4.00 |
$5.00 |
$11.70 |
| 26 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 95 | CY |
$200.00 |
$154.00 |
$137.72 |
$159.47 |
$72.00 |
$160.00 |
$309.50 |
| 27 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 860 | SY |
$55.00 |
$36.00 |
$48.79 |
$39.00 |
$63.00 |
$65.00 |
$45.80 |
| 28 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 30 | SF |
$20.00 |
$23.00 |
$23.61 |
$27.72 |
$41.00 |
$30.00 |
$32.00 |
| 29 | 610(J) 4810 |
(PL) STAMPED CONCRETE FINISH | 137 | SY |
$45.00 |
$93.00 |
$54.10 |
$25.65 |
$90.00 |
$80.00 |
$60.00 |
| 30 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 15 | LF |
$80.00 |
$125.00 |
$69.72 |
$128.57 |
$90.00 |
$80.00 |
$226.00 |
| 31 | 613(B) 0688 |
12" CORR. GALV. STEEL PIPE | 50 | LF |
$18.00 |
$62.00 |
$28.09 |
$62.95 |
$103.00 |
$60.00 |
$142.00 |
| 32 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 20 | LF |
$35.00 |
$86.00 |
$40.00 |
$98.76 |
$112.00 |
$70.00 |
$205.00 |
| 33 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 20 | LF |
$55.00 |
$127.00 |
$96.40 |
$190.52 |
$190.00 |
$145.00 |
$354.00 |
| 34 | 613(B) 0696 |
60" CORR. GALV. STEEL PIPE | 30 | LF |
$100.00 |
$180.00 |
$176.41 |
$216.52 |
$235.00 |
$270.00 |
$453.00 |
| 35 | 613(L) 5722 |
12" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$100.00 |
$645.00 |
$254.45 |
$487.62 |
$1,274.00 |
$215.00 |
$933.00 |
| 36 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 1 | EA |
$1,000.00 |
$1,700.00 |
$983.70 |
$2,083.08 |
$1,776.00 |
$1,500.00 |
$12,304.00 |
| 37 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 1 | EA |
$1,000.00 |
$1,100.00 |
$1,049.28 |
$2,302.08 |
$2,591.00 |
$1,850.00 |
$13,198.00 |
| 38 | 613(M) 7190 |
TYPE E4 CULVERT END TREATMENT | 1 | EA |
$1,900.00 |
$1,100.00 |
$2,229.72 |
$3,262.08 |
$3,109.00 |
$3,000.00 |
$12,844.00 |
| 39 | 613(P) 0767 |
60" GALV. STEEL CULVERT END SECTION ROUND | 1 | EA |
$2,000.00 |
$2,750.00 |
$2,649.43 |
$2,489.00 |
$805.00 |
$3,000.00 |
$2,692.00 |
| 40 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$2,815.00 |
$1,967.40 |
$5,756.93 |
$4,080.00 |
$17,500.00 |
$13,858.00 |
| 41 | 619(C) 0924 |
SAWING PAVEMENT | 611 | LF |
$2.00 |
$3.25 |
$3.93 |
$4.62 |
$4.00 |
$5.00 |
$3.70 |
| 42 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 33 | SF |
$25.00 |
$26.00 |
$27.54 |
$30.00 |
$31.00 |
$42.00 |
$30.00 |
| 43 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 48 | LF |
$11.00 |
$6.25 |
$6.56 |
$18.00 |
$7.00 |
$30.00 |
$7.00 |
| 44 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 124 | LF |
$1.00 |
$6.25 |
$6.56 |
$1.20 |
$7.00 |
$10.00 |
$7.00 |
| 45 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 104 | LF |
$12.00 |
$25.00 |
$26.56 |
$12.00 |
$30.00 |
$15.00 |
$28.30 |