| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$12,500.00 |
$9,000.00 |
$27,500.00 |
$40,000.00 |
$23,880.00 |
$10,300.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 18,408 | CY |
$7.00 |
$6.25 |
$7.25 |
$6.00 |
$6.60 |
$5.65 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 10,000 | CY |
$9.00 |
$7.25 |
$1.00 |
$7.00 |
$7.65 |
$6.70 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$7,800.00 |
$8,000.00 |
$11,000.00 |
$9,500.00 |
$8,800.00 |
$6,180.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,600 | LF |
$2.00 |
$1.21 |
$1.33 |
$1.35 |
$1.30 |
$1.25 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 2 | EA |
$280.00 |
$145.00 |
$145.00 |
$160.00 |
$200.00 |
$149.50 |
| 7 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 12 | CY |
$83.00 |
$130.00 |
$135.00 |
$100.00 |
$120.00 |
$165.00 |
| 8 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 12 | CY |
$106.00 |
$130.00 |
$135.00 |
$150.00 |
$120.00 |
$165.00 |
| 9 | 221(K) 0600 |
TEMPORARY FIBER LOG | 224 | LF |
$5.00 |
$3.50 |
$3.85 |
$4.00 |
$3.85 |
$3.60 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 20,255 | SY |
$1.50 |
$1.05 |
$1.20 |
$1.15 |
$1.10 |
$1.10 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 4 | AC |
$540.00 |
$120.00 |
$120.00 |
$140.00 |
$130.00 |
$123.50 |
| 12 | 241 2832 |
MOWING | 12 | AC |
$100.00 |
$25.00 |
$25.00 |
$30.00 |
$35.00 |
$25.80 |
| 13 | 307(K) 4300 |
STABILIZED SUBGRADE | 6,090 | SY |
$6.00 |
$5.65 |
$5.80 |
$6.50 |
$5.95 |
$12.60 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 50 | TON |
$45.00 |
$29.00 |
$37.00 |
$30.00 |
$48.00 |
$25.80 |
| 15 | 407(B) 0250 |
TACK COAT | 968 | GAL |
$5.00 |
$2.00 |
$2.20 |
$2.25 |
$5.50 |
$3.85 |
| 16 | 408 5774 |
PRIME COAT | 2,478 | GAL |
$7.00 |
$3.00 |
$3.30 |
$3.25 |
$6.30 |
$7.20 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,739 | TON |
$83.00 |
$59.56 |
$67.00 |
$67.00 |
$76.95 |
$73.70 |
| 18 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 749 | TON |
$98.00 |
$69.11 |
$79.00 |
$77.00 |
$87.50 |
$84.10 |
| 19 | 509(A) 0319 |
CLASS AA CONCRETE | 120 | CY |
$375.00 |
$400.00 |
$642.00 |
$475.00 |
$500.00 |
$499.50 |
| 20 | 509(D) 0325 |
CLASS C CONCRETE | 15 | CY |
$310.00 |
$300.00 |
$360.00 |
$300.00 |
$300.00 |
$546.00 |
| 21 | 511(A) 0332 |
REINFORCING STEEL | 16,243 | LB |
$1.00 |
$0.7500 |
$1.17 |
$0.9000 |
$1.20 |
$0.8200 |
| 22 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 2 | EA |
$2,500.00 |
$3,400.00 |
$2,500.00 |
$2,500.00 |
$2,500.00 |
$2,318.00 |
| 23 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 160 | LF |
$50.00 |
$30.00 |
$87.00 |
$65.00 |
$32.00 |
$31.90 |
| 24 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 74 | LF |
$70.00 |
$44.00 |
$105.00 |
$70.00 |
$46.50 |
$51.00 |
| 25 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,000.00 |
$1,600.00 |
$1,600.00 |
$1,200.00 |
$1,900.00 |
$2,353.00 |
| 26 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 1 | EA |
$1,200.00 |
$1,750.00 |
$1,650.00 |
$1,300.00 |
$2,500.00 |
$2,433.00 |
| 27 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$6,000.00 |
$4,600.00 |
$11,750.00 |
$4,500.00 |
$4,850.00 |
$6,180.00 |
| 28 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,917 | SY |
$5.00 |
$6.50 |
$4.50 |
$7.50 |
$7.35 |
$7.35 |
| 29 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 244 | LF |
$5.00 |
$3.00 |
$3.75 |
$5.00 |
$4.00 |
$7.90 |
| 30 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 650 | LF |
$20.00 |
$12.95 |
$18.70 |
$19.00 |
$18.00 |
$13.30 |
| 31 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,000.00 |
$2,300.00 |
$2,337.50 |
$2,400.00 |
$245.00 |
$2,369.00 |
| 32 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,500.00 |
$1,963.00 |
$1,478.50 |
$1,600.00 |
$2,100.00 |
$2,022.00 |
| 33 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 1,211 | LF |
$6.00 |
$6.42 |
$5.50 |
$6.00 |
$5.50 |
$5.15 |
| 34 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 1 | EA |
$300.00 |
$250.00 |
$150.00 |
$100.00 |
$200.00 |
$257.50 |
| 35 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 20 | EA |
$8.50 |
$17.00 |
$15.00 |
$18.00 |
$16.00 |
$12.40 |
| 36 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$25.00 |
$15.00 |
$10.25 |
$15.00 |
$12.00 |
$23.00 |
| 37 | 501(G) 6309 |
CLSM BACKFILL | 200 | CY |
$160.00 |
$150.00 |
$142.00 |
$150.00 |
$169.00 |
$170.50 |
| 38 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 399 | LF |
$240.00 |
$260.00 |
$221.00 |
$220.00 |
$220.00 |
$229.00 |
| 39 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$220.00 |
$260.00 |
$199.00 |
$200.00 |
$199.00 |
$296.00 |
| 40 | 504(B) 1305 |
SAW-CUT GROOVING | 660.1 | SY |
$5.00 |
$4.60 |
$5.06 |
$5.10 |
$4.85 |
$4.75 |
| 41 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 297 | LF |
$95.00 |
$89.00 |
$90.00 |
$90.00 |
$81.00 |
$117.00 |
| 42 | 506(A) 1322 |
STRUCTURAL STEEL | 150 | LB |
$3.00 |
$2.45 |
$2.75 |
$3.00 |
$3.00 |
$12.60 |
| 43 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,000.00 |
$250.00 |
$400.00 |
$300.00 |
$325.00 |
$502.00 |
| 44 | 509(A) 1326 |
CLASS AA CONCRETE | 155.6 | CY |
$600.00 |
$600.00 |
$615.00 |
$600.00 |
$600.00 |
$628.00 |
| 45 | 509(B) 1328 |
CLASS A CONCRETE | 59.6 | CY |
$600.00 |
$650.00 |
$640.00 |
$600.00 |
$625.00 |
$863.00 |
| 46 | 509(D) 1331 |
CLASS C CONCRETE | 6.2 | CY |
$400.00 |
$450.00 |
$600.00 |
$300.00 |
$350.00 |
$761.50 |
| 47 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 37,340 | LB |
$1.20 |
$1.05 |
$1.00 |
$1.00 |
$1.23 |
$1.10 |
| 48 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 400 | LF |
$40.00 |
$39.00 |
$35.00 |
$27.00 |
$31.00 |
$53.00 |
| 49 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 400 | LF |
$20.00 |
$10.00 |
$16.00 |
$13.00 |
$12.00 |
$22.70 |
| 50 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 51 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 461 | SY |
$5.00 |
$3.65 |
$4.10 |
$3.25 |
$3.85 |
$3.75 |
| 52 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,885 | TON |
$45.00 |
$45.00 |
$35.80 |
$39.00 |
$35.50 |
$42.10 |
| 53 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 655 | TON |
$35.00 |
$31.00 |
$26.50 |
$35.00 |
$33.00 |
$34.90 |
| 54 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$30.00 |
$29.00 |
$25.00 |
$25.00 |
$41.60 |
| 55 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$30.00 |
$30.00 |
$29.00 |
$25.00 |
$20.00 |
$34.10 |
| 56 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$7,700.00 |
$10,250.00 |
$10,000.00 |
$9,000.00 |
$16,255.00 |
| 57 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 24,600 | SD |
$0.5000 |
$0.4000 |
$0.2800 |
$0.3000 |
$0.2800 |
$0.4100 |
| 58 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,040 | SD |
$1.00 |
$0.4000 |
$0.5500 |
$0.5500 |
$0.5500 |
$0.4100 |
| 59 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,360 | SD |
$1.50 |
$0.4000 |
$1.10 |
$1.10 |
$1.10 |
$0.4100 |
| 60 | 880(B) 8827 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 600 | SD |
$3.00 |
$0.4500 |
$1.10 |
$1.10 |
$1.10 |
$0.4600 |
| 61 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,200 | SD |
$1.00 |
$0.1200 |
$0.1700 |
$0.1800 |
$0.1800 |
$0.1200 |
| 62 | 880(C) 8848 |
WING BARRICADES | 480 | SD |
$0.9000 |
$0.1000 |
$2.20 |
$2.20 |
$2.20 |
$0.1000 |
| 63 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,840 | SD |
$0.5000 |
$0.3000 |
$2.20 |
$2.20 |
$2.20 |
$0.3100 |
| 64 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 134 | SD |
$12.00 |
$10.00 |
$33.00 |
$33.00 |
$32.00 |
$10.30 |
| 65 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$80.00 |
$85.00 |
$82.50 |
$85.00 |
$90.00 |
$87.60 |
| 66 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 23.2 | SF |
$50.00 |
$48.00 |
$27.50 |
$28.00 |
$27.00 |
$49.40 |
| 67 | 851(C) 8324 |
2" SQUARE TUBE POST | 36 | LF |
$15.00 |
$13.00 |
$22.00 |
$22.00 |
$22.00 |
$13.40 |
| 68 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 5,707 | LF |
$1.00 |
$0.6500 |
$0.8300 |
$0.8300 |
$0.8000 |
$0.6700 |
| 69 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 59 | LF |
$15.00 |
$5.00 |
$1.10 |
$1.10 |
$2.00 |
$5.15 |
| 70 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$17,500.00 |
$16,500.00 |
$14,300.00 |
$13,500.00 |
$13,235.00 |
| 71 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$1,275.00 |
$3,300.00 |
$4,000.00 |
$4,000.00 |
$3,135.00 |
| 72 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$131,000.00 |
$127,200.00 |
$148,000.00 |
$105,000.00 |
$250,686.19 |
| 73 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$2,900.00 |
$19,800.00 |
$30,000.00 |
$18,500.00 |
$5,150.00 |
| 74 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,803 | CY |
$10.00 |
$7.25 |
$13.75 |
$14.00 |
$7.65 |
$6.20 |
| 75 | 202(D) 0184 |
UNCLASSIFIED BORROW | 3,759 | CY |
$12.00 |
$8.25 |
$15.13 |
$14.00 |
$8.70 |
$7.20 |
| 76 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,500.00 |
$3,920.00 |
$15,000.00 |
$9,500.00 |
$4,200.00 |
$3,090.00 |
| 77 | 221(C) 2801 |
TEMPORARY SILT FENCE | 800 | LF |
$2.00 |
$1.21 |
$1.35 |
$1.35 |
$1.50 |
$1.25 |
| 78 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$400.00 |
$145.00 |
$145.00 |
$160.00 |
$200.00 |
$149.50 |
| 79 | 221(F) 0100 |
TEMPORARY SILT DIKE | 155 | LF |
$10.00 |
$4.55 |
$5.00 |
$5.00 |
$5.50 |
$4.70 |
| 80 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 20 | CY |
$95.00 |
$130.00 |
$135.00 |
$125.00 |
$60.00 |
$165.00 |
| 81 | 229 4318 |
DITCH LINER PROTECTION | 280 | LF |
$3.00 |
$0.2500 |
$0.3000 |
$0.3000 |
$0.3000 |
$0.2600 |
| 82 | 230(A) 2806 |
SOLID SLAB SODDING | 6,891 | SY |
$2.00 |
$1.05 |
$1.20 |
$1.15 |
$1.20 |
$1.10 |
| 83 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.54 | AC |
$600.00 |
$120.00 |
$120.00 |
$140.00 |
$140.00 |
$123.50 |
| 84 | 241 2832 |
MOWING | 5 | AC |
$120.00 |
$25.00 |
$25.00 |
$30.00 |
$35.00 |
$25.80 |
| 85 | 307(K) 4300 |
STABILIZED SUBGRADE | 5,926 | SY |
$10.00 |
$5.65 |
$5.80 |
$6.50 |
$5.90 |
$12.90 |
| 86 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 20 | TON |
$45.00 |
$35.00 |
$43.00 |
$30.00 |
$60.00 |
$25.80 |
| 87 | 407(B) 0250 |
TACK COAT | 1,206 | GAL |
$5.00 |
$2.00 |
$2.20 |
$2.25 |
$5.50 |
$3.85 |
| 88 | 408 5774 |
PRIME COAT | 2,098 | GAL |
$8.00 |
$3.00 |
$3.30 |
$3.25 |
$7.25 |
$7.35 |
| 89 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,415 | TON |
$90.00 |
$59.56 |
$67.00 |
$67.00 |
$84.00 |
$71.60 |
| 90 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 594 | TON |
$100.00 |
$69.11 |
$79.00 |
$77.00 |
$89.25 |
$90.20 |
| 91 | 509(D) 0325 |
CLASS C CONCRETE | 25 | CY |
$450.00 |
$300.00 |
$357.50 |
$300.00 |
$350.00 |
$546.00 |
| 92 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$2,500.00 |
$3,400.00 |
$2,871.00 |
$2,500.00 |
$2,500.00 |
$2,318.00 |
| 93 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 84 | LF |
$80.00 |
$44.00 |
$82.50 |
$70.00 |
$48.50 |
$51.00 |
| 94 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 44 | LF |
$30.00 |
$26.00 |
$38.50 |
$30.00 |
$28.00 |
$26.80 |
| 95 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,000.00 |
$1,650.00 |
$1,375.00 |
$1,200.00 |
$1,900.00 |
$2,353.00 |
| 96 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$12,000.00 |
$3,700.00 |
$18,000.00 |
$6,000.00 |
$8,500.00 |
$4,120.00 |
| 97 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,966 | SY |
$6.00 |
$7.50 |
$6.20 |
$7.50 |
$7.50 |
$6.40 |
| 98 | 619(C) 0924 |
SAWING PAVEMENT | 44 | LF |
$5.00 |
$16.00 |
$11.00 |
$5.00 |
$6.00 |
$11.00 |
| 99 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 760 | LF |
$7.00 |
$7.25 |
$4.51 |
$5.00 |
$5.00 |
$4.20 |
| 100 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,189 | LF |
$9.00 |
$7.30 |
$5.06 |
$5.50 |
$5.50 |
$4.75 |
| 101 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 720 | LF |
$10.00 |
$7.35 |
$5.50 |
$6.00 |
$6.00 |
$5.15 |
| 102 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,510 | CY |
$15.00 |
$7.25 |
$7.70 |
$14.00 |
$8.00 |
$6.20 |
| 103 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 190 | CY |
$25.00 |
$15.00 |
$33.00 |
$15.00 |
$10.00 |
$46.40 |
| 104 | 509(A) 1326 |
CLASS AA CONCRETE | 424.3 | CY |
$500.00 |
$525.00 |
$435.00 |
$450.00 |
$500.00 |
$434.50 |
| 105 | 509(D) 1331 |
CLASS C CONCRETE | 60 | CY |
$400.00 |
$350.00 |
$334.00 |
$375.00 |
$300.00 |
$293.50 |
| 106 | 511(A) 1332 |
REINFORCING STEEL | 68,810 | LB |
$1.10 |
$0.8500 |
$1.09 |
$0.9000 |
$1.00 |
$0.8200 |
| 107 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$7,700.00 |
$8,700.00 |
$8,000.00 |
$8,000.00 |
$16,500.00 |
| 108 | 804(A) 2915 |
STRUCTURAL CONCRETE | 1 | CY |
$300.00 |
$110.00 |
$385.00 |
$385.00 |
$500.00 |
$113.50 |
| 109 | 804(B) 2916 |
REINFORCING STEEL | 48 | LB |
$1.75 |
$1.75 |
$2.20 |
$2.20 |
$4.00 |
$1.80 |
| 110 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 32 | SF |
$25.00 |
$60.00 |
$27.50 |
$28.00 |
$30.00 |
$61.80 |
| 111 | 851(B) 3217 |
2 1/2"@5.79 GALV.STEEL PIPE POST | 58 | LF |
$17.50 |
$22.00 |
$22.00 |
$22.00 |
$30.00 |
$22.70 |
| 112 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 4,800 | LF |
$0.3000 |
$0.3100 |
$0.5000 |
$0.5000 |
$0.5000 |
$0.3200 |
| 113 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$1,375.00 |
$3,000.00 |
$4,000.00 |
$4,000.00 |
$3,135.00 |