| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$13,440.00 |
$107,811.17 |
$50,905.06 |
$21,143.30 |
$156,000.00 |
$85,000.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 23,242 | CY |
$8.00 |
$4.99 |
$9.90 |
$7.16 |
$6.22 |
$8.00 |
$9.60 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 24,417 | CY |
$10.00 |
$8.93 |
$11.20 |
$7.56 |
$11.82 |
$6.00 |
$20.50 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$55,000.00 |
$33,600.00 |
$97,361.12 |
$49,872.00 |
$27,960.21 |
$30,000.00 |
$85,000.00 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,338 | LF |
$4.00 |
$2.62 |
$2.75 |
$2.62 |
$2.49 |
$2.90 |
$2.75 |
| 60 | 221(F) 0100 |
TEMPORARY SILT DIKE | 3,528 | LF |
$10.00 |
$6.28 |
$6.25 |
$6.29 |
$5.98 |
$10.00 |
$6.60 |
| 70 | 228 4170 |
NYLON EROSION CONTROL MAT | 21,688 | SY |
$10.00 |
$7.03 |
$8.55 |
$7.04 |
$6.69 |
$9.50 |
$7.35 |
| 80 | 230(A) 2806 |
SOLID SLAB SODDING | 120,453 | SY |
$3.00 |
$2.73 |
$2.71 |
$2.74 |
$2.60 |
$2.70 |
$2.85 |
| 90 | 233(A) 2817 |
VEGETATIVE MULCHING | 68 | AC |
$1,500.00 |
$729.75 |
$725.00 |
$731.53 |
$695.50 |
$1,495.00 |
$764.50 |
| 100 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 6,921 | CY |
$55.00 |
$61.95 |
$49.15 |
$48.97 |
$44.44 |
$70.00 |
$59.90 |
| 110 | 307(K) 4300 |
STABILIZED SUBGRADE | 46,997 | SY |
$6.00 |
$5.25 |
$5.50 |
$5.81 |
$5.25 |
$5.75 |
$6.80 |
| 130 | 325 5271 |
SEPARATOR FABRIC | 44,559 | SY |
$1.25 |
$2.36 |
$1.30 |
$1.83 |
$1.01 |
$2.00 |
$1.95 |
| 140 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 5,497 | TON |
$30.00 |
$23.10 |
$27.00 |
$31.54 |
$29.76 |
$32.00 |
$30.50 |
| 150 | 408 5774 |
PRIME COAT | 27,688 | GAL |
$3.00 |
$5.25 |
$3.50 |
$2.70 |
$4.10 |
$4.00 |
$5.00 |
| 160 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 10,394 | TON |
$75.00 |
$84.00 |
$66.35 |
$76.12 |
$80.88 |
$84.00 |
$75.25 |
| 170 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 3,496 | TON |
$90.00 |
$109.20 |
$88.15 |
$99.05 |
$106.67 |
$115.00 |
$90.25 |
| 180 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 66 | CY |
$25.00 |
$18.90 |
$28.00 |
$27.45 |
$20.52 |
$33.00 |
$27.80 |
| 190 | 509(A) 0319 |
CLASS AA CONCRETE | 210 | CY |
$450.00 |
$404.25 |
$435.00 |
$723.44 |
$674.15 |
$800.00 |
$657.50 |
| 200 | 509(D) 0325 |
CLASS C CONCRETE | 100 | CY |
$350.00 |
$287.70 |
$230.00 |
$310.00 |
$302.85 |
$375.00 |
$352.00 |
| 210 | 511(A) 0332 |
REINFORCING STEEL | 31,154 | LB |
$1.00 |
$1.15 |
$1.25 |
$1.64 |
$1.08 |
$1.05 |
$2.20 |
| 220 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 621 | TON |
$45.00 |
$40.95 |
$58.00 |
$68.66 |
$37.53 |
$80.00 |
$52.70 |
| 230 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 66 | LF |
$70.00 |
$58.69 |
$37.00 |
$60.81 |
$79.08 |
$50.00 |
$74.10 |
| 240 | 613(A) 0500 |
72" R.C.PIPE CLASS III | 58 | LF |
$400.00 |
$289.54 |
$380.00 |
$285.43 |
$421.60 |
$400.00 |
$271.00 |
| 250 | 613(EE) 5600 |
(SP) 12" CORRUGATED POLYPROPYLENE PIPE | 148 | LF |
$30.00 |
$31.81 |
$30.00 |
$33.26 |
$33.41 |
$57.00 |
$113.00 |
| 260 | 613(EE) 5610 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 828 | LF |
$50.00 |
$37.33 |
$42.00 |
$42.89 |
$52.05 |
$65.00 |
$56.10 |
| 270 | 613(EE) 5620 |
(SP) 24" CORRUGATED POLYPROPYLENE PIPE | 90 | LF |
$60.00 |
$52.00 |
$63.00 |
$55.95 |
$73.93 |
$85.00 |
$114.00 |
| 280 | 613(EE) 5640 |
(SP) 36" CORRUGATED POLYPROPYLENE PIPE | 104 | LF |
$100.00 |
$78.38 |
$110.00 |
$79.40 |
$116.45 |
$125.00 |
$128.00 |
| 290 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 40 | EA |
$700.00 |
$282.45 |
$1,050.00 |
$557.18 |
$203.12 |
$700.00 |
$1,410.00 |
| 300 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$1,000.00 |
$345.45 |
$335.00 |
$652.40 |
$259.88 |
$800.00 |
$1,629.00 |
| 310 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$2,500.00 |
$735.00 |
$1,600.00 |
$1,241.68 |
$718.26 |
$1,400.00 |
$2,257.00 |
| 320 | 613(L) 5746 |
72" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$5,000.00 |
$3,129.00 |
$6,400.00 |
$6,036.83 |
$5,612.76 |
$8,000.00 |
$8,111.00 |
| 330 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$12,075.00 |
$75,299.00 |
$41,225.64 |
$10,447.40 |
$21,000.00 |
$93,695.00 |
| 340 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 27,094 | SY |
$4.00 |
$5.25 |
$0.5500 |
$2.92 |
$6.63 |
$2.00 |
$5.40 |
| 350 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 200 | LF |
$25.00 |
$26.78 |
$25.00 |
$24.74 |
$23.52 |
$23.50 |
$28.10 |
| 360 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 8 | EA |
$2,000.00 |
$1,680.00 |
$1,400.00 |
$1,368.33 |
$1,300.96 |
$1,300.00 |
$1,760.00 |
| 370 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 8 | EA |
$2,000.00 |
$2,100.00 |
$2,100.00 |
$2,105.12 |
$2,001.48 |
$2,000.00 |
$2,200.00 |
| 380 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,273 | LF |
$6.00 |
$6.09 |
$5.45 |
$5.53 |
$5.25 |
$5.25 |
$6.40 |
| 390 | 624(H) 5920 |
(PL) GATE | 2 | EA |
$1,000.00 |
$1,207.50 |
$521.00 |
$631.54 |
$1,000.74 |
$600.00 |
$1,265.00 |
| 400 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 14 | EA |
$110.00 |
$288.75 |
$105.00 |
$106.84 |
$100.07 |
$100.00 |
$302.50 |
| 410 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 210 | CY |
$25.00 |
$26.25 |
$28.00 |
$30.28 |
$20.52 |
$16.50 |
$31.20 |
| 420 | 501(G) 6309 |
CLSM BACKFILL | 95 | CY |
$200.00 |
$259.28 |
$235.00 |
$195.23 |
$190.23 |
$200.00 |
$206.00 |
| 430 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 508 | LF |
$225.00 |
$240.43 |
$260.00 |
$243.68 |
$280.86 |
$230.00 |
$237.50 |
| 440 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 314 | LF |
$240.00 |
$271.75 |
$260.00 |
$275.46 |
$319.82 |
$276.00 |
$263.00 |
| 450 | 504(B) 1305 |
SAW-CUT GROOVING | 682.4 | SY |
$5.00 |
$5.46 |
$4.00 |
$4.42 |
$5.22 |
$12.00 |
$4.60 |
| 460 | 504(C) 6250 |
SEALED EXPANSION JOINT | 33.06 | LF |
$300.00 |
$338.54 |
$440.00 |
$351.04 |
$296.76 |
$340.00 |
$368.00 |
| 470 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 632.1 | LF |
$75.00 |
$86.99 |
$108.00 |
$95.54 |
$100.05 |
$84.00 |
$94.00 |
| 480 | 506(A) 1322 |
STRUCTURAL STEEL | 1,070 | LB |
$3.00 |
$2.65 |
$3.50 |
$5.07 |
$2.12 |
$3.00 |
$4.80 |
| 490 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$1,000.00 |
$1,248.42 |
$1,600.00 |
$1,250.00 |
$934.98 |
$1,175.00 |
$1,661.00 |
| 500 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$1,200.00 |
$1,248.42 |
$1,600.00 |
$1,201.27 |
$934.98 |
$1,175.00 |
$1,661.00 |
| 510 | 509(A) 1326 |
CLASS AA CONCRETE | 293.3 | CY |
$600.00 |
$685.63 |
$626.00 |
$780.45 |
$445.16 |
$695.00 |
$491.50 |
| 520 | 509(B) 1328 |
CLASS A CONCRETE | 78.1 | CY |
$700.00 |
$685.63 |
$626.00 |
$711.07 |
$934.82 |
$735.00 |
$908.00 |
| 530 | 511(A) 1332 |
REINFORCING STEEL | 86,230 | LB |
$1.00 |
$1.16 |
$1.25 |
$1.30 |
$1.00 |
$1.13 |
$1.55 |
| 540 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 262 | LF |
$35.00 |
$37.66 |
$42.00 |
$39.15 |
$38.64 |
$38.50 |
$50.10 |
| 550 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 750 | LF |
$40.00 |
$45.88 |
$52.10 |
$49.10 |
$51.50 |
$44.10 |
$57.40 |
| 560 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 262 | LF |
$20.00 |
$12.60 |
$16.00 |
$21.80 |
$18.91 |
$16.50 |
$25.30 |
| 570 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 750 | LF |
$20.00 |
$12.60 |
$21.00 |
$33.48 |
$19.90 |
$18.90 |
$27.20 |
| 580 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 590 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 214 | LF |
$900.00 |
$863.84 |
$680.00 |
$1,102.73 |
$982.32 |
$967.00 |
$819.50 |
| 600 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$2,000.00 |
$2,677.50 |
$10,500.00 |
$1,959.87 |
$1,927.79 |
$3,400.00 |
$5,678.00 |
| 610 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,380 | TON |
$45.00 |
$48.74 |
$63.00 |
$68.82 |
$39.68 |
$49.00 |
$48.80 |
| 620 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 350 | TON |
$35.00 |
$35.65 |
$63.00 |
$48.07 |
$24.89 |
$37.00 |
$38.20 |
| 630 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$30.00 |
$31.50 |
$73.00 |
$17.95 |
$12.83 |
$30.00 |
$70.80 |
| 640 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 47 | LF |
$25.00 |
$31.50 |
$73.00 |
$25.37 |
$12.83 |
$38.00 |
$27.00 |
| 650 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$65,000.00 |
$22,338.75 |
$78,000.00 |
$31,423.16 |
$49,432.39 |
$35,000.00 |
$76,875.00 |
| 660 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$200.00 |
$157.50 |
$300.00 |
$267.11 |
$250.19 |
$250.00 |
$165.00 |
| 670 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 43.04 | SF |
$25.00 |
$37.80 |
$22.00 |
$21.37 |
$20.01 |
$20.00 |
$39.60 |
| 680 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 88 | LF |
$11.00 |
$7.35 |
$9.50 |
$9.62 |
$9.01 |
$9.00 |
$7.70 |
| 690 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 40,806 | LF |
$0.4000 |
$0.4400 |
$0.4000 |
$0.4000 |
$0.3700 |
$0.4000 |
$0.4600 |
| 700 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 15 | LF |
$20.00 |
$4.20 |
$10.50 |
$10.68 |
$10.01 |
$10.00 |
$4.40 |
| 710 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,260 | SD |
$0.4000 |
$0.2600 |
$0.2600 |
$0.2700 |
$0.2500 |
$0.2500 |
$0.2700 |
| 730 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,100 | SD |
$0.5000 |
$0.3100 |
$0.2600 |
$0.2700 |
$0.2500 |
$0.2500 |
$0.3300 |
| 750 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,260 | SD |
$1.00 |
$2.10 |
$0.2600 |
$0.2700 |
$0.2500 |
$0.2500 |
$2.20 |
| 760 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,260 | SD |
$1.00 |
$1.00 |
$0.2600 |
$0.2700 |
$0.2500 |
$0.2500 |
$1.05 |
| 770 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,680 | SD |
$0.5000 |
$0.3700 |
$4.70 |
$4.81 |
$4.50 |
$4.50 |
$0.3800 |
| 775 | 880(I) 8902 |
FLAGGER | 30 | SD |
$80.00 |
$10.00 |
$400.00 |
$170.00 |
$192.00 |
$1,300.00 |
$564.50 |
| 780 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 100 | SD |
$15.00 |
$17.85 |
$10.50 |
$10.68 |
$10.01 |
$10.00 |
$18.70 |
| 790 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$34,230.00 |
$77,500.00 |
$43,154.99 |
$40,545.88 |
$90,000.00 |
$55,450.00 |
| 800 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$5,460.00 |
$17,000.00 |
$8,399.38 |
$1,865.61 |
$100,000.00 |
$5,000.00 |
| 810 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$263,100.00 |
$189,497.94 |
$273,000.00 |
$273,368.00 |
$415,856.41 |
$295,000.00 |
$186,284.44 |