| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$190,000.00 |
$150,000.00 |
$150,000.00 |
$140,000.00 |
$224,149.23 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 434,816 | CY |
$6.00 |
$4.25 |
$4.60 |
$4.25 |
$7.00 |
$7.22 |
| 30 | 202(C) 0182 |
ROCK EXCAVATION | 500 | CY |
$30.00 |
$30.00 |
$20.00 |
$30.00 |
$25.00 |
$21.97 |
| 40 | 202(D) 0184 |
UNCLASSIFIED BORROW | 4,935 | CY |
$10.00 |
$6.75 |
$1.00 |
$6.70 |
$9.00 |
$7.79 |
| 50 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$45,000.00 |
$150,000.00 |
$152,396.19 |
$160,000.00 |
$250,000.00 |
$228,298.46 |
| 60 | 221(C) 2801 |
TEMPORARY SILT FENCE | 93,523 | LF |
$2.00 |
$1.84 |
$2.86 |
$1.85 |
$2.00 |
$2.08 |
| 70 | 221(F) 0100 |
TEMPORARY SILT DIKE | 3,150 | LF |
$11.00 |
$5.85 |
$10.26 |
$5.60 |
$6.45 |
$6.61 |
| 80 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 44 | CY |
$150.00 |
$275.00 |
$152.89 |
$165.00 |
$150.00 |
$347.00 |
| 90 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 9 | CY |
$250.00 |
$540.00 |
$427.97 |
$365.00 |
$300.00 |
$653.88 |
| 100 | 230(A) 2806 |
SOLID SLAB SODDING | 308,365 | SY |
$3.00 |
$2.19 |
$3.36 |
$2.55 |
$2.45 |
$2.48 |
| 110 | 232(B) 2814 |
SEEDING METHOD B | 70.24 | AC |
$1,500.00 |
$200.00 |
$1,261.03 |
$600.00 |
$660.00 |
$678.11 |
| 120 | 233(A) 2817 |
VEGETATIVE MULCHING | 70.24 | AC |
$1,000.00 |
$100.00 |
$1,606.52 |
$600.00 |
$660.00 |
$678.11 |
| 130 | 241 2832 |
MOWING | 140.48 | AC |
$100.00 |
$70.00 |
$160.08 |
$140.00 |
$125.00 |
$129.97 |
| 140 | 303(A) 2200 |
(SP)AGGREGATE BASE TYPE A, PLANT MIXED | 36,062 | CY |
$55.00 |
$56.00 |
$50.64 |
$70.00 |
$48.00 |
$48.69 |
| 150 | 307(K) 4300 |
STABILIZED SUBGRADE | 177,888 | SY |
$5.00 |
$4.50 |
$4.42 |
$4.00 |
$5.25 |
$5.30 |
| 160 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 183,864 | SY |
$4.00 |
$6.50 |
$3.86 |
$3.10 |
$6.60 |
$6.63 |
| 170 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 19,253 | SY |
$2.50 |
$0.0500 |
$1.47 |
$1.25 |
$2.50 |
$2.41 |
| 180 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 22,360 | TON |
$35.00 |
$40.00 |
$22.84 |
$20.00 |
$24.00 |
$24.92 |
| 190 | 407(B) 0250 |
TACK COAT | 27,108 | GAL |
$2.50 |
$2.50 |
$3.00 |
$2.15 |
$2.45 |
$2.55 |
| 200 | 408 5774 |
PRIME COAT | 113,568 | GAL |
$3.00 |
$3.50 |
$1.50 |
$3.25 |
$3.50 |
$3.25 |
| 210 | 409(A) 4242 |
FABRIC REINFORCEMENT | 3,112 | SY |
$2.50 |
$2.00 |
$0.00 |
$2.70 |
$2.20 |
$2.20 |
| 220 | 409(B) 4268 |
BITUMINOUS BINDER | 623 | GAL |
$5.00 |
$4.00 |
$0.00 |
$2.85 |
$4.80 |
$4.74 |
| 230 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 60,463 | TON |
$85.00 |
$65.00 |
$76.00 |
$73.00 |
$67.00 |
$63.37 |
| 240 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 20,585 | TON |
$95.00 |
$75.00 |
$92.13 |
$88.00 |
$77.00 |
$71.61 |
| 250 | 412 5267 |
COLD MILLING PAVEMENT | 9,334 | SY |
$3.00 |
$1.15 |
$6.16 |
$2.24 |
$1.15 |
$1.13 |
| 260 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 274 | CY |
$25.00 |
$30.00 |
$34.55 |
$30.00 |
$20.00 |
$34.15 |
| 270 | 501(G) 6315 |
CLSM BACKFILL | 108 | CY |
$200.00 |
$190.00 |
$218.81 |
$190.00 |
$190.00 |
$216.26 |
| 280 | 509(A) 0319 |
CLASS AA CONCRETE | 921 | CY |
$175.00 |
$440.00 |
$502.63 |
$440.00 |
$485.00 |
$496.76 |
| 290 | 509(D) 0325 |
CLASS C CONCRETE | 2,262 | CY |
$300.00 |
$230.00 |
$262.17 |
$230.00 |
$285.00 |
$259.11 |
| 300 | 511(A) 0332 |
REINFORCING STEEL | 134,990 | LB |
$1.00 |
$1.10 |
$1.27 |
$1.10 |
$1.20 |
$1.25 |
| 310 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 1,137 | TON |
$45.00 |
$40.00 |
$38.56 |
$64.00 |
$43.00 |
$130.03 |
| 320 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 379 | TON |
$40.00 |
$26.00 |
$28.64 |
$62.48 |
$33.00 |
$108.26 |
| 330 | 602(B) 4300 |
ARTICULATING CONCRETE BLOCK | 6,680 | SF |
$6.00 |
$6.09 |
$5.55 |
$12.45 |
$13.00 |
$19.28 |
| 340 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 545 | SY |
$100.00 |
$79.00 |
$47.72 |
$80.00 |
$55.00 |
$115.85 |
| 350 | 611(G) 5388 |
INLET CDI RCB DES. 2 | 1 | EA |
$3,000.00 |
$3,500.00 |
$6,625.73 |
$6,600.00 |
$7,500.00 |
$10,039.43 |
| 360 | 611(G) 5704 |
INLET CDI RCP DES. 1 | 2 | EA |
$3,200.00 |
$6,000.00 |
$2,955.55 |
$4,200.00 |
$4,000.00 |
$4,737.20 |
| 370 | 611(G) 5710 |
INLET CDI RCP DES. 7 | 1 | EA |
$3,800.00 |
$5,500.00 |
$5,094.94 |
$8,200.00 |
$6,000.00 |
$8,949.30 |
| 380 | 611(H) 5789 |
ADD'L DEPTH IN INLET CDI RCP DES. 1 | 10.5 | VF |
$600.00 |
$300.00 |
$110.00 |
$600.00 |
$500.00 |
$493.69 |
| 390 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 470 | LF |
$65.00 |
$63.00 |
$53.01 |
$60.00 |
$36.00 |
$53.94 |
| 400 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 608 | LF |
$75.00 |
$88.00 |
$63.95 |
$85.00 |
$54.00 |
$85.90 |
| 410 | 613(A) 0497 |
54" R.C.PIPE CLASS III | 122 | LF |
$225.00 |
$245.00 |
$185.47 |
$245.00 |
$205.00 |
$256.32 |
| 420 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 110 | LF |
$90.00 |
$86.00 |
$62.03 |
$100.00 |
$73.00 |
$111.87 |
| 430 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 260 | LF |
$110.00 |
$115.00 |
$77.07 |
$110.00 |
$99.00 |
$155.93 |
| 440 | 613(B) 0688 |
12" CORR. GALV. STEEL PIPE | 120 | LF |
$25.00 |
$36.00 |
$32.07 |
$35.00 |
$25.00 |
$31.11 |
| 450 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 82 | LF |
$35.00 |
$48.00 |
$38.79 |
$50.00 |
$35.00 |
$47.66 |
| 460 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 604 | LF |
$40.00 |
$57.00 |
$45.89 |
$55.00 |
$48.00 |
$63.92 |
| 470 | 613(B) 0693 |
42" CORR. GALV. STEEL PIPE | 100 | LF |
$65.00 |
$84.00 |
$118.99 |
$85.00 |
$85.00 |
$112.72 |
| 480 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 72 | LF |
$35.00 |
$49.00 |
$38.10 |
$50.00 |
$37.00 |
$49.52 |
| 490 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 152 | LF |
$45.00 |
$60.00 |
$45.50 |
$60.00 |
$50.00 |
$66.49 |
| 500 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 2,259 | LF |
$20.00 |
$25.00 |
$15.18 |
$25.00 |
$15.00 |
$27.97 |
| 510 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 753 | LF |
$15.00 |
$15.00 |
$12.25 |
$30.00 |
$25.00 |
$22.54 |
| 520 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$500.00 |
$900.00 |
$867.62 |
$800.00 |
$750.00 |
$1,797.85 |
| 530 | 613(L) 5740 |
54" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$3,500.00 |
$1,150.00 |
$4,122.25 |
$3,300.00 |
$3,550.00 |
$9,189.02 |
| 540 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 10 | EA |
$1,300.00 |
$1,225.00 |
$1,381.96 |
$1,200.00 |
$1,350.00 |
$1,365.82 |
| 550 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 23 | EA |
$1,500.00 |
$1,325.00 |
$1,497.11 |
$1,300.00 |
$1,680.00 |
$1,479.64 |
| 560 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 1 | EA |
$2,500.00 |
$2,350.00 |
$2,648.74 |
$2,300.00 |
$2,475.00 |
$2,617.82 |
| 570 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 11 | EA |
$1,550.00 |
$1,225.00 |
$1,381.96 |
$1,200.00 |
$2,230.00 |
$1,365.82 |
| 580 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 23 | EA |
$2,000.00 |
$1,425.00 |
$1,612.28 |
$1,400.00 |
$2,675.00 |
$1,593.46 |
| 590 | 613(M) 7202 |
TYPE BB6 CULVERT END TREATMENT | 1 | EA |
$3,000.00 |
$2,550.00 |
$2,879.07 |
$2,500.00 |
$2,800.00 |
$2,845.45 |
| 600 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 11 | EA |
$450.00 |
$450.00 |
$518.23 |
$450.00 |
$500.00 |
$512.18 |
| 610 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$60,000.00 |
$15,275.74 |
$43,000.00 |
$45,000.00 |
$89,952.23 |
| 620 | 619(B) 0291 |
REMOVAL OF HEADWALL | 10 | EA |
$1,500.00 |
$900.00 |
$921.30 |
$800.00 |
$2,200.00 |
$910.55 |
| 630 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 89,151 | SY |
$3.00 |
$1.94 |
$3.45 |
$3.15 |
$2.55 |
$2.55 |
| 640 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 2,025 | LF |
$4.00 |
$4.50 |
$3.07 |
$25.00 |
$5.00 |
$11.39 |
| 650 | 619(C) 0924 |
SAWING PAVEMENT | 10,859 | LF |
$3.50 |
$2.50 |
$2.38 |
$2.00 |
$5.00 |
$3.00 |
| 660 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 38,841 | LF |
$6.00 |
$5.25 |
$6.05 |
$7.00 |
$5.75 |
$6.67 |
| 670 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 839 | CY |
$25.00 |
$2.00 |
$4.87 |
$2.00 |
$20.00 |
$2.28 |
| 680 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 98 | CY |
$35.00 |
$30.00 |
$34.55 |
$30.00 |
$20.00 |
$34.15 |
| 690 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$25,000.00 |
$24,000.00 |
$27,639.02 |
$24,000.00 |
$15,000.00 |
$27,316.44 |
| 700 | 509(A) 1326 |
CLASS AA CONCRETE | 270.1 | CY |
$500.00 |
$435.00 |
$499.40 |
$435.00 |
$485.00 |
$593.57 |
| 710 | 511(A) 1332 |
REINFORCING STEEL | 40,080 | LB |
$1.00 |
$1.10 |
$1.27 |
$1.10 |
$1.20 |
$1.35 |
| 720 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$750.00 |
$800.00 |
$1,626.10 |
$1,500.00 |
$800.00 |
$1,595.83 |
| 730 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$25,000.00 |
$10,000.00 |
$9,213.01 |
$8,000.00 |
$10,000.00 |
$9,105.48 |
| 740 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 553 | CY |
$25.00 |
$2.00 |
$4.87 |
$2.00 |
$20.00 |
$2.28 |
| 750 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 1,223 | CY |
$35.00 |
$30.00 |
$34.55 |
$30.00 |
$20.00 |
$34.15 |
| 760 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$75,000.00 |
$75,000.00 |
$28,481.77 |
$100,000.00 |
$70,000.00 |
$85,363.87 |
| 770 | 509(A) 1326 |
CLASS AA CONCRETE | 2,695 | CY |
$500.00 |
$313.00 |
$360.69 |
$325.00 |
$485.00 |
$456.48 |
| 780 | 511 6306 |
MECHANICAL SPLICES | 344 | EA |
$35.00 |
$30.00 |
$34.55 |
$30.00 |
$25.00 |
$34.15 |
| 790 | 511(A) 1332 |
REINFORCING STEEL | 498,520 | LB |
$1.00 |
$1.10 |
$1.22 |
$1.10 |
$1.20 |
$1.31 |
| 800 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 740 | TON |
$55.00 |
$40.00 |
$38.56 |
$65.00 |
$43.00 |
$103.64 |
| 810 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 180 | TON |
$50.00 |
$72.00 |
$28.64 |
$50.00 |
$33.00 |
$80.88 |
| 820 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$80,000.00 |
$40,000.00 |
$34,548.78 |
$50,000.00 |
$50,000.00 |
$34,145.55 |
| 830 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 4,179 | CY |
$25.00 |
$2.00 |
$4.87 |
$2.00 |
$20.00 |
$2.28 |
| 840 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 371 | CY |
$35.00 |
$30.00 |
$34.55 |
$30.00 |
$20.00 |
$34.15 |
| 850 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$75,000.00 |
$38,000.00 |
$43,761.77 |
$50,000.00 |
$70,000.00 |
$43,251.02 |
| 860 | 509(A) 1326 |
CLASS AA CONCRETE | 799.7 | CY |
$500.00 |
$340.00 |
$390.92 |
$340.00 |
$485.00 |
$486.36 |
| 870 | 511 6306 |
MECHANICAL SPLICES | 272 | EA |
$35.00 |
$30.00 |
$34.55 |
$30.00 |
$25.00 |
$34.15 |
| 880 | 511(A) 1332 |
REINFORCING STEEL | 154,930 | LB |
$1.00 |
$1.10 |
$1.27 |
$1.10 |
$1.20 |
$1.35 |
| 890 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,320 | TON |
$55.00 |
$40.00 |
$38.56 |
$62.00 |
$43.00 |
$51.74 |
| 900 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 295 | TON |
$50.00 |
$45.00 |
$28.64 |
$50.00 |
$33.00 |
$42.61 |
| 910 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$80,000.00 |
$40,000.00 |
$34,548.78 |
$30,000.00 |
$40,000.00 |
$38,145.55 |
| 911 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 20,755 | LF |
$0.3000 |
$0.6900 |
$0.7900 |
$0.6900 |
$0.7200 |
$0.7900 |
| 912 | 858(A) 8905 |
PAVEMENT MARKERS CLASS A TYPE 2-A | 13 | EA |
$5.25 |
$8.00 |
$9.21 |
$8.00 |
$9.00 |
$9.15 |
| 920 | 858(A) 8911 |
PAVEMENT MARKERS CLASS A TYPE 2-C | 5,022 | EA |
$9.70 |
$3.50 |
$4.03 |
$3.50 |
$3.75 |
$4.01 |
| 930 | 858(A) 8914 |
PAVEMENT MARKERS CLASS A TYPE 2-D | 2,481 | EA |
$5.80 |
$3.50 |
$4.03 |
$3.50 |
$3.75 |
$4.01 |
| 940 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,620 | SD |
$8.50 |
$18.00 |
$20.73 |
$18.00 |
$20.50 |
$20.60 |
| 950 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 40 | SD |
$16.00 |
$30.00 |
$34.55 |
$30.00 |
$32.00 |
$34.33 |
| 960 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 28,205 | LF |
$25.00 |
$40.00 |
$12.68 |
$16.09 |
$25.00 |
$33.40 |
| 961 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 8,700 | LF |
$3.85 |
$5.50 |
$3.53 |
$16.95 |
$3.00 |
$13.26 |
| 970 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,230 | SD |
$0.4000 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0400 |
$0.0200 |
| 980 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 680 | SD |
$0.7000 |
$2.50 |
$2.88 |
$2.50 |
$2.75 |
$2.86 |
| 990 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,720 | SD |
$1.70 |
$2.50 |
$2.88 |
$2.50 |
$2.75 |
$2.86 |
| 1,000 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 27,000 | SD |
$0.3500 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0400 |
$0.0200 |
| 1,010 | 880(F) 8878 |
DRUMS | 27,000 | SD |
$0.2000 |
$0.7500 |
$0.8600 |
$0.7500 |
$0.9000 |
$0.8600 |
| 1,020 | 880(G) 8890 |
CHANNELIZER CONES | 740 | SD |
$0.3000 |
$0.2500 |
$0.2900 |
$0.2500 |
$0.3000 |
$0.2900 |
| 1,030 | 880(I) 8902 |
FLAGGER | 40 | SD |
$1.30 |
$10.00 |
$215.35 |
$1,220.76 |
$850.00 |
$250.08 |
| 1,040 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 630 | SD |
$11.00 |
$18.00 |
$20.73 |
$18.00 |
$18.50 |
$20.60 |
| 1,041 | 804(A) 2915 |
STRUCTURAL CONCRETE | 12 | CY |
$876.00 |
$200.00 |
$230.32 |
$200.00 |
$220.00 |
$228.86 |
| 1,042 | 804(B) 2916 |
REINFORCING STEEL | 15,400 | LB |
$1.85 |
$0.4200 |
$0.4800 |
$0.4200 |
$0.4500 |
$0.4800 |
| 1,050 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 65 | EA |
$70.00 |
$75.00 |
$86.38 |
$75.00 |
$77.00 |
$85.82 |
| 1,060 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 18 | EA |
$195.00 |
$250.00 |
$287.91 |
$250.00 |
$275.00 |
$286.08 |
| 1,070 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 406.63 | SF |
$23.00 |
$32.00 |
$36.85 |
$32.00 |
$33.00 |
$36.62 |
| 1,080 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 755 | LF |
$25.00 |
$16.00 |
$18.42 |
$16.00 |
$16.50 |
$18.31 |
| 1,090 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 33,000 | LF |
$0.6000 |
$0.4400 |
$0.5100 |
$0.4400 |
$0.4600 |
$0.5000 |
| 1,100 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 100 | LF |
$0.5000 |
$3.00 |
$3.45 |
$3.00 |
$3.20 |
$3.43 |
| 1,110 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$286,200.00 |
$120,000.00 |
$92,086.87 |
$160,000.00 |
$147,500.00 |
$236,887.90 |
| 1,120 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$9,500.00 |
$2,879.07 |
$160,000.00 |
$10,000.00 |
$24,408.28 |
| 1,130 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$1,000,600.00 |
$920,000.00 |
$953,751.87 |
$915,000.00 |
$975,000.00 |
|