| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$17,466.00 |
$25,000.00 |
$18,500.00 |
$8,000.00 |
$11,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 5,182 | CY |
$10.50 |
$2.68 |
$7.50 |
$5.00 |
$8.75 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 482 | CY |
$20.25 |
$19.26 |
$16.00 |
$10.50 |
$10.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,173.00 |
$3,210.83 |
$7,500.00 |
$5,000.00 |
$3,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,277 | LF |
$1.71 |
$3.27 |
$1.50 |
$2.99 |
$2.99 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 287 | LF |
$9.75 |
$16.78 |
$8.00 |
$18.95 |
$18.95 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 1,197 | SY |
$4.00 |
$2.41 |
$5.25 |
$4.95 |
$4.95 |
| 8 | 232(B) 2814 |
SEEDING METHOD B | 5.06 | AC |
$249.00 |
$3,807.31 |
$1,800.00 |
$1,750.00 |
$1,750.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 5.06 | AC |
$258.00 |
$528.79 |
$1,300.00 |
$1,195.00 |
$1,195.00 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 669 | CY |
$43.70 |
$27.83 |
$45.00 |
$35.00 |
$50.00 |
| 11 | 310(B) 0149 |
SUBGRADE, METHOD B | 1,600 | SY |
$2.65 |
$3.34 |
$2.60 |
$1.50 |
$1.50 |
| 12 | 325 5271 |
SEPARATOR FABRIC | 4,215 | SY |
$1.60 |
$1.34 |
$1.30 |
$1.50 |
$1.25 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 235 | TON |
$30.30 |
$21.41 |
$36.00 |
$18.00 |
$30.00 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 893 | TON |
$90.00 |
$78.25 |
$85.00 |
$76.00 |
$83.00 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 609 | TON |
$100.85 |
$91.59 |
$105.00 |
$74.25 |
$99.00 |
| 16 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 27 | CY |
$32.60 |
$107.03 |
$18.00 |
$35.00 |
$15.00 |
| 17 | 509(A) 1326 |
CLASS AA CONCRETE | 93.4 | CY |
$500.00 |
$362.13 |
$470.00 |
$450.00 |
$265.00 |
| 18 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$535.14 |
$370.00 |
$300.00 |
$250.00 |
| 19 | 511(A) 0332 |
REINFORCING STEEL | 16,080 | LB |
$1.00 |
$0.4200 |
$1.30 |
$1.00 |
$0.7500 |
| 20 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 62 | TON |
$46.00 |
$26.76 |
$43.00 |
$30.15 |
$40.00 |
| 21 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 27 | TON |
$50.00 |
$26.76 |
$40.00 |
$22.25 |
$32.00 |
| 22 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 120 | LF |
$60.00 |
$42.81 |
$72.00 |
$32.50 |
$55.00 |
| 23 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$709.00 |
$374.60 |
$600.00 |
$400.00 |
$650.00 |
| 24 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 19 | CY |
$55.00 |
$38.53 |
$48.00 |
$16.60 |
$40.00 |
| 25 | 613(V) 1180 |
TRENCH EXCAVATION | 29 | CY |
$13.25 |
$19.26 |
$18.00 |
$60.00 |
$15.00 |
| 26 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$3,210.83 |
$5,000.00 |
$7,500.00 |
$3,000.00 |
| 27 | 508 6359 |
PRECAST ARCH CULVERT | 105 | LF |
$3,600.00 |
$2,639.96 |
$2,909.53 |
$3,665.75 |
$3,400.00 |
| 28 | 509(A) 1326 |
CLASS AA CONCRETE | 27.2 | CY |
$700.00 |
$438.10 |
$1,000.00 |
$500.00 |
$700.00 |
| 29 | 509(B) 1328 |
CLASS A CONCRETE | 52.8 | CY |
$727.00 |
$584.64 |
$780.00 |
$500.00 |
$600.00 |
| 30 | 511(A) 1332 |
REINFORCING STEEL | 8,500 | LB |
$1.10 |
$0.4200 |
$2.10 |
$1.00 |
$1.00 |
| 31 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 982 | TON |
$44.40 |
$37.53 |
$34.00 |
$32.50 |
$40.00 |
| 32 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 132 | TON |
$36.75 |
$33.32 |
$32.00 |
$26.50 |
$32.00 |
| 33 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$13,860.80 |
$16,054.14 |
$10,000.00 |
$8,000.00 |
$12,000.00 |
| 34 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 350 | LF |
$20.00 |
$21.41 |
$25.00 |
$20.00 |
$75.00 |
| 35 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,291.70 |
$6,207.60 |
$5,500.00 |
$5,300.00 |
$2,750.00 |
| 36 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 27 | SF |
$25.50 |
$34.25 |
$35.00 |
$32.00 |
$25.00 |
| 37 | 851(C) 8324 |
2" SQUARE TUBE POST | 44 | LF |
$10.70 |
$8.56 |
$10.00 |
$8.00 |
$10.00 |
| 38 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 7,194 | LF |
$0.6000 |
$0.9100 |
$0.8500 |
$0.8500 |
$1.00 |
| 39 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,675.69 |
$4,000.00 |
$2,500.00 |
$2,400.00 |
| 40 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,000.00 |
$11,375.00 |
$14,000.00 |
$7,500.00 |
$12,000.00 |
| 41 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$1,605.41 |
$2,500.00 |
$3,500.00 |
$1,250.00 |
| 42 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$61,000.00 |
$64,000.00 |
$40,000.00 |
$90,000.00 |
$75,000.00 |