Bid tab 180063

Let Jan 18, 2018 · Division 8 · Ottawa Sign up free

‹ Jan 2018 results

BRIDGE AND APPROACHES COUNTY ROAD (EW-0030): OVER FOURMILE CREEK, 4.3 MILES EAST OF THE CRAIG COUNTY LINE NEAR MIAMI. PROJECT LENGTH = 0.340 MILE

Let date
Thursday, January 18, 2018
Contract
180063
J/P numbers
29401(04)
District
Division 8
County
Ottawa
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (EW-0030): OVER FOURMILE CREEK, 4.3 MILES EAST OF THE CRAIG COUNTY LINE NEAR MIAMI. PROJECT LENGTH = 0.340 MILE
Project number
CIRB-258D(018)RB

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$873,626
1 Crossland Construction Company, Inc. Low bidder $815,808 -6.6%
3 T. McDonald Construction, Inc. $919,318 +5.2% +12.7%
4 B & B BRIDGE COMPANY, LLC $925,717 +6.0% +13.5%
5 RRY SERVICES LLC $948,993 +8.6% +16.3%

Bid tab: unit prices 42 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Crossland Const…#3 T. McDonald Con…#4 B & B BRIDGE CO…#5 RRY SERVICES LLC
1201(A) 0102 CLEARING AND GRUBBING1LSUM $17,466.00 $25,000.00 $18,500.00 $8,000.00 $11,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION5,182CY $10.50 $2.68 $7.50 $5.00 $8.75
3202(D) 0184 UNCLASSIFIED BORROW482CY $20.25 $19.26 $16.00 $10.50 $10.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $10,173.00 $3,210.83 $7,500.00 $5,000.00 $3,500.00
5221(C) 2801 TEMPORARY SILT FENCE3,277LF $1.71 $3.27 $1.50 $2.99 $2.99
6221(F) 0100 TEMPORARY SILT DIKE287LF $9.75 $16.78 $8.00 $18.95 $18.95
7230(A) 2806 SOLID SLAB SODDING1,197SY $4.00 $2.41 $5.25 $4.95 $4.95
8232(B) 2814 SEEDING METHOD B5.06AC $249.00 $3,807.31 $1,800.00 $1,750.00 $1,750.00
9233(A) 2817 VEGETATIVE MULCHING5.06AC $258.00 $528.79 $1,300.00 $1,195.00 $1,195.00
10303(A) 2100 AGGREGATE BASE TYPE A669CY $43.70 $27.83 $45.00 $35.00 $50.00
11310(B) 0149 SUBGRADE, METHOD B1,600SY $2.65 $3.34 $2.60 $1.50 $1.50
12325 5271 SEPARATOR FABRIC4,215SY $1.60 $1.34 $1.30 $1.50 $1.25
13402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E235TON $30.30 $21.41 $36.00 $18.00 $30.00
14411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)893TON $90.00 $78.25 $85.00 $76.00 $83.00
15411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)609TON $100.85 $91.59 $105.00 $74.25 $99.00
16501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED27CY $32.60 $107.03 $18.00 $35.00 $15.00
17509(A) 1326 CLASS AA CONCRETE93.4CY $500.00 $362.13 $470.00 $450.00 $265.00
18509(D) 0325 CLASS C CONCRETE10CY $350.00 $535.14 $370.00 $300.00 $250.00
19511(A) 0332 REINFORCING STEEL16,080LB $1.00 $0.4200 $1.30 $1.00 $0.7500
20601(B) 0536 TYPE I-A PLAIN RIPRAP62TON $46.00 $26.76 $43.00 $30.15 $40.00
21601(C) 0538 TYPE I-A FILTER BLANKET27TON $50.00 $26.76 $40.00 $22.25 $32.00
22613(A) 0491 18" R.C.PIPE CLASS III120LF $60.00 $42.81 $72.00 $32.50 $55.00
23613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND6EA $709.00 $374.60 $600.00 $400.00 $650.00
24613(T) 1187 STANDARD BEDDING MATERIAL, CLASS C19CY $55.00 $38.53 $48.00 $16.60 $40.00
25613(V) 1180 TRENCH EXCAVATION29CY $13.25 $19.26 $18.00 $60.00 $15.00
26619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $5,000.00 $3,210.83 $5,000.00 $7,500.00 $3,000.00
27508 6359 PRECAST ARCH CULVERT105LF $3,600.00 $2,639.96 $2,909.53 $3,665.75 $3,400.00
28509(A) 1326 CLASS AA CONCRETE27.2CY $700.00 $438.10 $1,000.00 $500.00 $700.00
29509(B) 1328 CLASS A CONCRETE52.8CY $727.00 $584.64 $780.00 $500.00 $600.00
30511(A) 1332 REINFORCING STEEL8,500LB $1.10 $0.4200 $2.10 $1.00 $1.00
31601(B) 1353 TYPE I-A PLAIN RIPRAP982TON $44.40 $37.53 $34.00 $32.50 $40.00
32601(C) 1355 TYPE I-A FILTER BLANKET132TON $36.75 $33.32 $32.00 $26.50 $32.00
33619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $13,860.80 $16,054.14 $10,000.00 $8,000.00 $12,000.00
34623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE350LF $20.00 $21.41 $25.00 $20.00 $75.00
35623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,291.70 $6,207.60 $5,500.00 $5,300.00 $2,750.00
36850(A) 8110 SHEET ALUMINUM SIGNS27SF $25.50 $34.25 $35.00 $32.00 $25.00
37851(C) 8324 2" SQUARE TUBE POST44LF $10.70 $8.56 $10.00 $8.00 $10.00
38856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)7,194LF $0.6000 $0.9100 $0.8500 $0.8500 $1.00
39880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $5,000.00 $2,675.69 $4,000.00 $2,500.00 $2,400.00
40642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $8,000.00 $11,375.00 $14,000.00 $7,500.00 $12,000.00
41220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $3,000.00 $1,605.41 $2,500.00 $3,500.00 $1,250.00
42641 1399 MOBILIZATION1LSUM $61,000.00 $64,000.00 $40,000.00 $90,000.00 $75,000.00