Bid tab 200198

Let May 14, 2020 · Division 5 · Kiowa Sign up free

‹ May 2020 results

PEDESTRIAN IMPROVEMENTS (SIDEWALKS ) CITY STREET (MAIN STREET): FROM THE 4TH STREET INTERSECTION , EXTEND NORTH IN HOBART . PROJECT LENGTH = 0.108 MILE

Let date
Thursday, May 14, 2020
Contract
200198
J/P numbers
32987(04)
District
Division 5
County
Kiowa
Highway
Limits
PEDESTRIAN IMPROVEMENTS (SIDEWALKS ) CITY STREET (MAIN STREET): FROM THE 4TH STREET INTERSECTION , EXTEND NORTH IN HOBART . PROJECT LENGTH = 0.108 MILE
Project number
TAP-238E(057)TP

Bidders 2

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$371,125
1 TOM HUDSON PAVING, INC. Low bidder $501,537 +35.1%
2 DOWNEY CONTRACTING, LLC $542,565 +46.2% +8.2%

Bid tab: unit prices 51 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 TOM HUDSON PAVI…#2 DOWNEY CONTRACT…
1202(A) 0183 UNCLASSIFIED EXCAVATION271CY $30.00 $30.63 $35.00
2202(D) 0184 UNCLASSIFIED BORROW100CY $35.00 $32.42 $42.00
3202(D) 4781 UNCLASSIFIED BORROW (TOPSOIL)26.58CY $75.00 $55.58 $60.00
4221(C) 2801 TEMPORARY SILT FENCE40LF $5.00 $3.72 $5.00
5221(K) 0600 TEMPORARY FIBER LOG100LF $3.00 $4.25 $6.00
6303(A) 2100 AGGREGATE BASE TYPE A217.16CY $70.00 $113.63 $102.00
7325 5271 SEPARATOR FABRIC324SY $5.00 $4.45 $3.00
8326(B) 0100 GEOGRID REINFORCEMENT150SY $7.00 $5.19 $5.00
9411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)20.05TON $150.00 $276.59 $375.00
10411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)11.26TON $150.00 $315.96 $450.00
11509(C) 0322 CLASS A CONCRETE, SMALL STRUCTURES0.1CY $2,000.00 $8,740.80 $2,200.00
12609(B) 1525 2'-8" COMB. CURB & GUTTER (6" BARRIER)713LF $30.00 $54.64 $43.00
13610(A) 0602 4" CONCRETE SIDEWALK734.53SY $80.00 $159.69 $108.00
14610(E) 0425 (PL) CONCRETE PAVERS2,609SF $16.00 $12.55 $17.00
15610(I) 4610 TACTILE WARNING DEVICE-NEW90SF $45.00 $70.27 $43.00
16611(A) 2657 MANHOLE (4' DIAMETER)2EA $4,000.00 $5,377.33 $2,200.00
17611(G) 5112 INLET CI DES. 2 (STD)4EA $4,000.00 $4,476.08 $3,450.00
18612(E) 0647 VALVE BOXES ADJUST TO GRADE1EA $500.00 $423.36 $1,000.00
19612(G) 0650 FIRE HYDRANT RESET2EA $3,800.00 $5,558.46 $1,500.00
20612(I) 0652 WATER METER RESET6EA $200.00 $2,116.10 $1,100.00
21613(A) 0491 18" R.C.PIPE CLASS III120LF $150.00 $111.19 $92.00
22616(B) 5221 4" POLYVINYL CHLORIDE (PVC) PIPE15LF $15.00 $47.17 $156.00
23616(C) 0868 3/4" COPPER WATER SERVICE PIPE78LF $27.00 $60.68 $72.00
24619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $1,500.00 $15,763.14 $35,000.00
25619(B) 4728 REMOVAL OF ASPHALT PAVEMENT560.33SY $14.00 $13.96 $25.00
26619(B) 4791 REMOVAL OF CURB568LF $10.00 $10.24 $15.00
27619(B) 4792 REMOVAL OF SIDEWALK843.99SY $10.00 $16.04 $20.00
28619(C) 0924 SAWING PAVEMENT52LF $10.00 $14.49 $10.00
29622(A) 4746 PIPE RAILING9LF $115.00 $463.84 $200.00
30802(B) 8340 2" PVC SCH.40 PLASTIC CONDUIT BORED256LF $25.00 $42.54 $58.00
31802(B) 8342 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED1,092LF $15.00 $15.95 $22.00
32802(B) 8344 3" PVC SCH.40 PLASTIC CONDUIT BORED32LF $35.00 $58.50 $80.00
33802(B) 8346 3" PVC SCH.40 PLASTIC CONDUIT TRENCHED320LF $20.00 $22.34 $30.00
34803(A) 8065 PULL BOX(SIZE I)7EA $400.00 $941.29 $1,300.00
35804(A) 2915 STRUCTURAL CONCRETE4.55CY $2,000.00 $1,861.32 $2,500.00
36805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS5EA $100.00 $53.18 $75.00
37809(C) 8399 POST TOP LUMINAIRE7EA $4,000.00 $4,483.11 $12,500.00
38850(A) 8110 SHEET ALUMINUM SIGNS18.23SF $25.00 $26.59 $36.00
39851(C) 8324 2" SQUARE TUBE POST60LF $15.00 $10.64 $15.00
40854(A) 8800 TRAFFIC STRIPE(PAINT)(4" WIDE)132LF $0.7500 $2.13 $3.00
41855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)793LF $2.00 $5.32 $7.00
42855(A) 8825 TRAFFIC STRIPE(PLASTIC)(24" WIDE)129LF $8.00 $31.91 $43.00
43855(B) 8824 TRAFFIC STRIPE(PLASTIC)(SYMBOLS)3EA $800.00 $265.90 $360.00
44857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)1,474LF $1.00 $0.5300 $1.00
45880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF72SD $1.00 $1.06 $1.50
46880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF144SD $1.50 $2.13 $3.00
47880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF144SD $2.00 $3.19 $4.00
48880(E) 8860 WARNING LIGHTS(TYPE A)828SD $0.2000 $0.5800 $1.00
49880(F) 8878 DRUMS828SD $0.3000 $1.06 $1.50
50642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $5,000.00 $2,871.74 $3,900.00
51641 1552 MOBILIZATION1LSUM $45,000.00 $35,775.38 $25,000.00