| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$12,500.00 |
$55,620.00 |
$74,000.00 |
$85,325.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 33,361 | CY |
$6.95 |
$6.20 |
$7.90 |
$14.00 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 14,069 | CY |
$14.50 |
$16.00 |
$14.70 |
$44.90 |
| 4 | 202(D) 0184 |
UNCLASSIFIED BORROW | 16,655 | CY |
$8.35 |
$8.00 |
$10.00 |
$15.00 |
| 5 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$116,000.00 |
$116,905.00 |
$75,000.00 |
$32,725.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 38,335 | LF |
$1.30 |
$1.90 |
$1.65 |
$1.60 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 3,585 | LF |
$8.20 |
$10.30 |
$10.00 |
$9.70 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 150,750 | SY |
$1.35 |
$2.55 |
$2.70 |
$2.60 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 31.14 | AC |
$850.00 |
$875.50 |
$300.00 |
$648.00 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 10,429 | CY |
$48.00 |
$47.50 |
$65.25 |
$50.40 |
| 11 | 307(A) 4200 |
FLY ASH | 3,999 | TON |
$70.00 |
$82.40 |
$83.80 |
$46.30 |
| 12 | 307(D) 4230 |
LIME | 290 | TON |
$185.00 |
$177.90 |
$195.50 |
$198.00 |
| 13 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 105,234 | SY |
$2.50 |
$2.45 |
$2.65 |
$4.60 |
| 14 | 307(G) 4260 |
LIME PRETREATMENT | 26,309 | SY |
$1.45 |
$1.95 |
$0.6000 |
$8.20 |
| 15 | 311(B) 0152 |
PROCESSING EXISTING BASE & SURFACE, METHOD B | 31,570 | LF |
$8.50 |
$8.45 |
$8.95 |
$11.80 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 12,458 | TON |
$28.00 |
$24.50 |
$27.85 |
$28.10 |
| 17 | 407(B) 0250 |
TACK COAT | 5,966 | GAL |
$2.70 |
$3.50 |
$1.01 |
$3.80 |
| 18 | 408 5774 |
PRIME COAT | 60,522 | GAL |
$2.20 |
$3.65 |
$2.01 |
$4.00 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 13,509 | TON |
$75.00 |
$65.35 |
$83.85 |
$85.15 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 8,904 | TON |
$85.00 |
$76.85 |
$86.95 |
$89.50 |
| 21 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 81 | CY |
$30.00 |
$21.65 |
$5.65 |
$30.70 |
| 22 | 509(A) 0319 |
CLASS AA CONCRETE | 157.5 | CY |
$525.00 |
$494.40 |
$1,072.00 |
$637.00 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 170.6 | CY |
$275.00 |
$375.95 |
$375.00 |
$410.50 |
| 24 | 511(A) 0332 |
REINFORCING STEEL | 25,530 | LB |
$1.15 |
$1.05 |
$1.00 |
$1.25 |
| 25 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 410 | TON |
$45.00 |
$46.35 |
$52.45 |
$43.90 |
| 26 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 400 | LF |
$35.00 |
$28.85 |
$45.10 |
$37.80 |
| 27 | 611(G) 5706 |
INLET CDI RCP DES. 3 | 1 | EA |
$3,000.00 |
$2,871.00 |
$5,145.00 |
$5,616.00 |
| 28 | 611(G) 5707 |
INLET CDI RCP DES. 4 | 2 | EA |
$3,200.00 |
$2,871.00 |
$5,545.00 |
$5,832.00 |
| 29 | 611(G) 5791 |
INLET CDI 30SK RCP DES.5 | 1 | EA |
$4,200.00 |
$3,296.00 |
$6,950.00 |
$6,804.00 |
| 30 | 611(H) 5792 |
ADD'L DEPTH IN INLET CDI RCP DES. 4 | 2 | VF |
$300.00 |
$180.25 |
$310.00 |
$1,944.00 |
| 31 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 54 | LF |
$70.00 |
$39.80 |
$33.10 |
$41.00 |
| 32 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 16 | LF |
$100.00 |
$51.40 |
$41.30 |
$59.40 |
| 33 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 491 | LF |
$85.00 |
$65.35 |
$54.70 |
$65.90 |
| 34 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 178 | LF |
$110.00 |
$81.00 |
$75.85 |
$82.10 |
| 35 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 178 | LF |
$100.00 |
$79.40 |
$70.05 |
$77.80 |
| 36 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 36 | LF |
$150.00 |
$112.40 |
$112.50 |
$147.00 |
| 37 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 228 | LF |
$35.00 |
$26.30 |
$29.80 |
$25.90 |
| 38 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 194 | LF |
$42.00 |
$33.30 |
$34.65 |
$33.50 |
| 39 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 32 | LF |
$45.00 |
$41.15 |
$39.60 |
$44.30 |
| 40 | 613(EE) 5610 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 108 | LF |
$45.00 |
$27.80 |
$34.05 |
$27.00 |
| 41 | 613(EE) 5620 |
(SP) 24" CORRUGATED POLYPROPYLENE PIPE | 122 | LF |
$55.00 |
$50.00 |
$46.35 |
$36.70 |
| 42 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 14 | EA |
$300.00 |
$175.10 |
$455.25 |
$146.00 |
| 43 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 6 | EA |
$1,350.00 |
$816.80 |
$1,525.00 |
$1,053.00 |
| 44 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 12 | EA |
$330.00 |
$253.40 |
$515.00 |
$178.00 |
| 45 | 613(L) 4522 |
35" X 24" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$450.00 |
$336.80 |
$615.00 |
$345.50 |
| 46 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$2,000.00 |
$1,924.05 |
$2,000.00 |
$2,900.00 |
| 47 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 12 | EA |
$570.00 |
$713.80 |
$515.00 |
$1,069.00 |
| 48 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 10 | EA |
$1,000.00 |
$917.75 |
$630.00 |
$1,064.00 |
| 49 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 14 | EA |
$1,350.00 |
$1,094.90 |
$770.00 |
$1,377.00 |
| 50 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,600.00 |
$1,687.60 |
$1,185.00 |
$2,149.00 |
| 51 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 451 | CY |
$60.00 |
$44.30 |
$45.00 |
$44.30 |
| 52 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 172 | CY |
$45.00 |
$44.30 |
$45.00 |
$44.30 |
| 53 | 613(V) 1180 |
TRENCH EXCAVATION | 631 | CY |
$15.00 |
$16.50 |
$13.00 |
$14.00 |
| 54 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$43,878.00 |
$175,000.00 |
$57,240.00 |
| 55 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 3 | EA |
$175.00 |
$51.50 |
$350.00 |
$54.00 |
| 56 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 36 | EA |
$20.00 |
$15.45 |
$16.95 |
$16.20 |
| 57 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 113,460 | LF |
$0.5500 |
$0.4000 |
$0.4500 |
$0.4100 |
| 58 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$20,000.00 |
$12,670.00 |
$70,000.00 |
$16,200.00 |
| 59 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$70,000.00 |
$53,560.00 |
$100,000.00 |
$96,125.00 |
| 60 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,500.00 |
$8,240.00 |
$4,500.00 |
$3,780.00 |
| 61 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$235,000.00 |
$147,690.00 |
$245,000.00 |
$308,361.58 |