Bid tab 200018

Let Jan 16, 2020 · Division 1 · Mcintosh Sign up free

‹ Jan 2020 results

BRIDGE AND APPROACHES SH -52: OVER MILL CREEK AND CHISHOLM CREEK , 3.6 MILES AND 1.7 MILES SOUTH OF THE SH -9 JUNCTION NEAR HANNA. PROJECT LENGTH = 0.233 MILE

Let date
Thursday, January 16, 2020
Contract
200018
J/P numbers
28973(04)
District
Division 1
County
Mcintosh
Highway
Limits
BRIDGE AND APPROACHES SH -52: OVER MILL CREEK AND CHISHOLM CREEK , 3.6 MILES AND 1.7 MILES SOUTH OF THE SH -9 JUNCTION NEAR HANNA. PROJECT LENGTH = 0.233 MILE
Project number
STP-246C(042)PM

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$4,314,329
1 L & N BRIDGE, LLC Low bidder $4,100,175 -5.0%
2 BRIDGECO CONTRACTORS, INC. $4,127,250 -4.3% +0.7%
3 Treas Construction Inc $4,217,062 -2.3% +2.9%
5 C-GAWF CONSTRUCTION, INC. $4,238,606 -1.8% +3.4%
6 HASKELL LEMON CONSTRUCTION CO. $4,246,517 -1.6% +3.6%
7 Robinson Construction, LLC $4,740,024 +9.9% +15.6%
8 Frontier Bridge, Inc. $4,810,096 +11.5% +17.3%

Bid tab: unit prices 88 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 L & N BRIDGE, L…#2 BRIDGECO CONTRA…#3 Treas Construct…#5 C-GAWF CONSTRUC…#6 HASKELL LEMON C…#7 Robinson Constr…#8 Frontier Bridge…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $15,026.89 $22,500.00 $51,100.00 $132,300.00 $25,000.00 $34,250.00 $50,000.00 $26,950.00
2202(A) 0183 UNCLASSIFIED EXCAVATION19,869CY $6.72 $7.35 $8.05 $7.94 $13.00 $7.55 $10.81 $8.09
3202(D) 0184 UNCLASSIFIED BORROW10,137CY $9.08 $7.44 $8.15 $8.03 $14.00 $7.65 $14.09 $8.18
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $11,367.98 $26,700.00 $29,300.00 $28,836.00 $25,000.00 $27,505.00 $67,800.00 $29,370.00
5221(C) 2801 TEMPORARY SILT FENCE2,886LF $2.23 $2.75 $3.30 $3.31 $3.20 $2.85 $4.57 $3.29
6221(F) 0100 TEMPORARY SILT DIKE380LF $10.09 $10.00 $20.35 $24.82 $22.00 $10.30 $27.28 $20.35
7221(G) 0151 TEMPORARY ROCK FILTER DAM TYPE 260CY $65.72 $120.00 $60.00 $178.20 $50.00 $103.00 $40.00 $74.51
8230(A) 2806 SOLID SLAB SODDING45,212SY $2.33 $3.75 $3.25 $4.38 $3.33 $3.85 $4.87 $3.25
9232(A) 2813 SEEDING METHOD A3AC $1,394.55 $1,400.00 $2,150.00 $3,115.80 $195.00 $1,442.00 $3,462.00 $2,145.00
10233(A) 2817 VEGETATIVE MULCHING3AC $1,337.95 $1,000.00 $2,150.00 $3,115.80 $195.00 $1,030.00 $3,462.00 $2,145.00
11303(A) 2100 AGGREGATE BASE TYPE A3,176CY $55.00 $47.69 $52.50 $51.51 $52.66 $49.10 $59.75 $52.46
12307(K) 4300 STABILIZED SUBGRADE16,191SY $7.00 $6.03 $6.60 $6.51 $7.77 $6.20 $7.50 $6.63
13325 5271 SEPARATOR FABRIC9,011SY $1.70 $1.14 $1.25 $1.23 $0.8500 $1.15 $1.95 $1.25
14326(B) 0100 GEOGRID REINFORCEMENT3,302SY $2.49 $2.00 $2.20 $2.16 $2.25 $2.05 $6.45 $2.20
15402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E1,246TON $23.31 $23.14 $26.60 $24.99 $29.99 $23.80 $29.87 $25.45
16408 5774 PRIME COAT3,748GAL $3.64 $3.92 $4.30 $4.23 $4.44 $7.50 $4.19 $4.31
17411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)1,596TON $85.00 $81.99 $87.70 $88.55 $94.66 $92.70 $88.50 $90.19
18411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)2,698TON $90.00 $89.35 $95.60 $96.49 $103.33 $87.60 $96.99 $98.29
19412 5267 COLD MILLING PAVEMENT5,848SY $4.57 $3.20 $3.50 $3.74 $3.66 $4.95 $3.45 $4.51
20509(D) 0325 CLASS C CONCRETE40CY $313.81 $550.00 $325.00 $324.00 $350.00 $491.50 $475.00 $382.84
21521(A) 6210 PNEUMATICALLY PLACED MORTAR337SY $500.00 $150.00 $445.36 $108.00 $125.00 $245.50 $95.00 $365.20
22613(A) 0491 18" R.C.PIPE CLASS III96LF $52.73 $56.60 $60.00 $61.12 $55.00 $58.30 $63.99 $62.26
23613(A) 0492 24" R.C.PIPE CLASS III72LF $70.00 $85.40 $90.50 $92.23 $66.25 $88.00 $90.49 $93.94
24613(A) 0494 36" R.C.PIPE CLASS III88LF $90.00 $135.70 $144.00 $146.56 $84.69 $140.00 $187.50 $149.27
25613(B) 0690 24" CORR. GALV. STEEL PIPE48LF $36.88 $37.88 $41.70 $40.91 $35.00 $39.00 $57.75 $41.67
26613(B) 0691 30" CORR. GALV. STEEL PIPE16LF $44.35 $46.02 $50.60 $49.70 $42.00 $47.40 $71.81 $50.62
27613(B) 5747 120" CORR. GALV. STEEL PIPE240LF $200.00 $263.31 $279.25 $284.38 $400.00 $271.00 $568.00 $289.64
28619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $6,338.89 $6,600.00 $7,300.00 $27,108.00 $12,500.00 $6,799.00 $35,000.00 $7,260.00
29619(B) 4728 REMOVAL OF ASPHALT PAVEMENT11,849SY $3.25 $3.45 $3.85 $3.73 $2.22 $9.50 $1.75 $5.50
30619(B) 4780 REMOVAL OF GUARDRAIL1,302LF $3.29 $3.00 $5.00 $4.32 $3.00 $4.80 $3.50 $4.40
31623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE300LF $21.82 $18.50 $20.30 $19.98 $19.22 $19.10 $21.97 $20.35
32623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,555.17 $2,500.00 $2,800.00 $2,700.00 $2,711.00 $2,575.00 $2,968.00 $2,750.00
33623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,120.16 $1,750.00 $2,100.00 $1,890.00 $2,100.00 $1,803.00 $2,077.00 $1,925.00
34624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)4,268LF $5.63 $6.00 $5.45 $5.35 $5.50 $5.10 $6.84 $5.45
35853 9066 GUARDRAIL DELINEATORS(TYPE 1, CODE 1)12EA $14.76 $10.00 $12.00 $10.80 $17.50 $10.30 $11.87 $11.00
36501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON90CY $30.00 $15.00 $12.00 $37.80 $25.00 $33.20 $30.00 $34.50
37501(G) 6309 CLSM BACKFILL200CY $155.00 $175.00 $190.00 $256.46 $155.00 $189.00 $231.56 $243.02
38503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)1,045LF $250.00 $225.00 $226.60 $276.44 $232.00 $216.50 $245.21 $261.86
39504(A) 1304 APPROACH SLAB224.8SY $200.00 $180.00 $250.85 $216.09 $175.00 $292.00 $229.90 $325.53
40504(B) 1305 SAW-CUT GROOVING1,149SY $5.00 $4.05 $4.45 $5.45 $10.33 $4.15 $5.93 $4.66
41504(D) 6245 CONCRETE RAIL (TR4)517LF $100.00 $90.00 $84.00 $96.90 $75.00 $128.00 $118.75 $108.35
42506(A) 1322 STRUCTURAL STEEL1,100LB $5.00 $2.50 $2.90 $2.07 $3.33 $6.95 $2.37 $4.49
43507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY10EA $1,500.00 $500.00 $430.00 $683.94 $444.00 $746.00 $475.00 $1,069.80
44507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY20EA $1,400.00 $1,800.00 $1,334.50 $1,685.83 $1,250.00 $1,613.00 $1,662.50 $2,289.46
45507(C) 6282 ELASTOMERIC BEARING PADS20EA $500.00 $525.00 $220.50 $108.00 $444.00 $502.00 $593.75 $471.40
46509(A) 1326 CLASS AA CONCRETE289.8CY $675.00 $700.00 $650.00 $739.30 $575.00 $518.00 $628.90 $800.29
47509(B) 1328 CLASS A CONCRETE155.8CY $650.00 $800.00 $675.00 $739.30 $625.00 $669.50 $685.33 $909.17
48511(B) 6010 EPOXY COATED REINFORCING STEEL85,510LB $1.10 $1.15 $1.22 $1.67 $1.11 $1.40 $1.14 $1.43
49514(A) 6010 PILES, FURNISHED (HP 10X42)880LF $50.00 $26.00 $26.00 $27.08 $32.33 $35.30 $53.43 $40.59
50514(B) 6292 PILES, DRIVEN (HP 10X42)880LF $35.00 $11.15 $12.00 $12.96 $10.00 $19.60 $29.68 $32.20
51514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
52515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)944SY $4.50 $4.00 $4.30 $4.32 $6.65 $4.10 $5.93 $4.60
53516(A) 6096 DRILLED SHAFTS 60" DIAMETER248LF $950.00 $1,200.00 $891.50 $946.57 $775.00 $840.00 $1,128.12 $1,147.49
54516(C) 6200 CROSSHOLE SONIC LOGGING2EA $3,000.00 $1,750.00 $1,950.00 $2,970.00 $2,000.00 $3,841.00 $3.56 $4,715.00
55523(A) 6550 SEALER CRACK PREPARATION163LF $10.00 $5.00 $6.00 $5.40 $7.77 $5.15 $5.94 $5.75
56523(B) 6560 SEALER RESIN1.8GAL $200.00 $180.00 $220.00 $194.40 $200.00 $185.50 $237.50 $207.00
57601(B) 1353 TYPE I-A PLAIN RIPRAP320TON $50.00 $32.00 $39.50 $53.21 $47.50 $54.30 $55.00 $53.84
58601(C) 1355 TYPE I-A FILTER BLANKET75TON $40.00 $24.00 $39.00 $41.97 $38.00 $43.80 $40.00 $41.83
59613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND84LF $30.00 $24.00 $45.00 $32.40 $25.00 $38.50 $40.00 $39.35
60613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.60LF $30.00 $21.00 $25.00 $32.40 $25.00 $32.80 $40.00 $41.53
61619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $50,000.00 $28,000.00 $56,000.00 $56,120.04 $42,500.00 $74,885.00 $60,000.00 $97,750.00
62202(A) 1301 UNCLASSIFIED EXCAVATION7,455CY $7.00 $7.35 $7.00 $2.16 $13.00 $7.55 $10.81 $16.10
63501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED684CY $20.00 $12.00 $10.00 $32.40 $13.00 $36.10 $30.00 $40.25
64509(A) 1326 CLASS AA CONCRETE1,451.7CY $525.00 $473.00 $445.00 $390.96 $375.00 $379.00 $431.25 $423.20
65511(A) 1332 REINFORCING STEEL270,010LB $1.00 $1.00 $1.05 $1.06 $0.8600 $1.10 $1.06 $1.21
66619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $50,000.00 $20,000.00 $60,000.00 $100,071.45 $32,500.00 $66,780.00 $60,000.00 $115,000.00
67857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)14,520LF $0.1700 $0.1500 $0.2000 $0.1600 $0.2000 $0.1500 $0.1800 $0.1700
68857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)3,848LF $0.7900 $1.00 $1.10 $1.08 $1.25 $1.05 $1.18 $1.10
69857(E) 8887 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1648EA $1.36 $2.00 $2.20 $2.16 $2.25 $2.05 $2.37 $2.20
70857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)1,655LF $0.2500 $0.5000 $0.6000 $0.5400 $0.6500 $0.5200 $0.5900 $0.5500
71871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.1,608SD $3.30 $2.50 $2.75 $2.70 $3.00 $2.60 $2.97 $2.75
72877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER3,995LF $23.88 $26.25 $0.1200 $21.60 $12.50 $20.10 $31.16 $27.50
73877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER641LF $4.24 $3.00 $1.15 $4.32 $10.00 $16.80 $3.56 $5.50
74880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF15,362SD $0.2200 $0.1000 $0.1200 $0.1100 $15.00 $0.1000 $0.1200 $0.1100
75880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF1,884SD $0.4700 $1.00 $1.15 $1.08 $1.33 $1.05 $1.18 $1.10
76880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF2,534SD $0.9500 $3.00 $3.30 $3.24 $3.66 $3.10 $3.56 $3.30
77880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)1,404SD $0.9900 $1.00 $1.15 $1.08 $1.33 $1.05 $1.18 $1.10
78880(C) 8848 WING BARRICADES480SD $0.9300 $2.00 $2.20 $2.16 $2.33 $2.05 $2.37 $2.20
79880(E) 8860 WARNING LIGHTS(TYPE A)2,808SD $0.1500 $1.00 $1.15 $1.08 $1.33 $1.05 $1.18 $1.10
80880(F) 8878 DRUMS60,409SD $0.1100 $0.0500 $0.0700 $0.0500 $0.0900 $0.0500 $0.0500 $0.0600
81880(I) 8902 FLAGGER62SD $100.41 $100.00 $150.00 $86.40 $25.00 $103.00 $990.00 $220.00
82882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN480SD $9.91 $10.00 $12.00 $10.80 $50.00 $10.30 $11.87 $11.00
83850(A) 8110 SHEET ALUMINUM SIGNS68SF $19.54 $15.00 $18.00 $16.20 $17.50 $15.50 $17.81 $16.50
84851(C) 8330 2 1/2" SQUARE TUBE POST106LF $10.90 $10.00 $12.00 $10.80 $12.00 $10.30 $11.87 $11.00
85856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)11,775LF $0.6300 $0.6000 $0.6700 $0.6500 $0.7500 $0.6200 $0.7100 $0.6600
86642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $60,000.00 $20,000.00 $22,900.00 $22,485.60 $47,500.00 $37,650.00 $43,290.00 $31,130.00
87220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $3,162.52 $3,600.00 $4,500.00 $2,700.00 $7,750.00 $4,893.00 $6,000.00 $6,050.00
88641 1399 MOBILIZATION1LSUM $226,000.00 $225,000.00 $200,000.00 $53,838.66 $134,000.00 $260,473.22 $160,000.00 $257,098.97