Bid tab 190376

Let May 14, 2020 · Division 8 · Washington Sign up free

‹ May 2020 results

GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROADS (BISON RD/DURHAM RD): FROM 2.0 MI N OF US-60 EXT N ON BISON RD , THEN WEST ON DURHAM RD IN DEWEY . PROJECT LENGTH = 2.991 MILES

Let date
Thursday, May 14, 2020
Contract
190376
J/P numbers
27821(04)
District
Division 8
County
Washington
Highway
Limits
GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROADS (BISON RD/DURHAM RD): FROM 2.0 MI N OF US-60 EXT N ON BISON RD , THEN WEST ON DURHAM RD IN DEWEY . PROJECT LENGTH = 2.991 MILES
Project number
STP-274B(026)CI

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$5,302,495
1 Paragon Contractors, LLC Low bidder $4,900,712 -7.6%
2 APAC-CENTRAL, INC. $5,280,000 -0.4% +7.7%
3 H & H BRIDGE COMPANY $5,705,557 +7.6% +16.4%
4 BECCO CONTRACTORS, INC. $6,157,000 +16.1% +25.6%

Bid tab: unit prices 77 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Paragon Contrac…#2 APAC-CENTRAL, I…#3 H & H BRIDGE CO…#4 BECCO CONTRACTO…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $30,000.00 $17,500.00 $45,000.00 $150,000.00 $125,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION54,201CY $8.00 $10.15 $8.90 $12.00 $16.00
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $40,000.00 $153,000.00 $55,000.00 $65,000.00 $30,000.00
4221(C) 2801 TEMPORARY SILT FENCE26,455LF $2.00 $2.05 $2.80 $2.00 $2.15
5221(F) 0100 TEMPORARY SILT DIKE2,282LF $12.00 $7.25 $10.20 $14.88 $10.00
6221(G) 0150 TEMPORARY ROCK FILTER DAM TYPE 1132CY $120.00 $82.75 $112.00 $150.00 $70.00
7230(A) 2806 SOLID SLAB SODDING72,898SY $3.00 $3.10 $3.30 $3.03 $2.85
8232(B) 2814 SEEDING METHOD B16AC $3,000.00 $1,850.00 $1,280.00 $1,802.50 $700.00
9233(A) 2817 VEGETATIVE MULCHING16AC $1,800.00 $1,525.00 $1,280.00 $1,493.50 $750.00
10303(A) 2100 AGGREGATE BASE TYPE A16,840CY $35.00 $36.10 $42.00 $36.64 $54.77
11310(B) 0149 SUBGRADE, METHOD B81,254SY $1.50 $1.20 $1.00 $3.00 $1.00
12325 5271 SEPARATOR FABRIC76,222SY $1.50 $1.35 $1.00 $1.00 $0.8500
13402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E3,343TON $25.00 $23.60 $23.50 $19.32 $15.00
14407(B) 0250 TACK COAT5,013GAL $2.50 $3.00 $2.00 $4.00 $2.00
15411(B) 5935 SUPERPAVE, TYPE S3(PG 76-28 OK)14,988TON $75.00 $65.10 $74.00 $71.75 $66.00
16411(C) 5950 SUPERPAVE, TYPE S4(PG 76-28 OK)7,461TON $85.00 $74.60 $81.00 $80.27 $80.00
17414(B) 5725 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT )660SY $20.00 $45.00 $65.50 $36.05 $50.00
18414(G) 5275 P.C. CONCRETE FOR PAVEMENT129CY $155.00 $155.00 $140.00 $134.00 $150.00
19501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED35CY $35.00 $80.00 $35.00 $100.00 $35.00
20509(A) 0319 CLASS AA CONCRETE167CY $700.00 $565.00 $610.00 $400.00 $800.00
21511(A) 0332 REINFORCING STEEL24,538LB $1.00 $0.7500 $1.00 $1.00 $1.00
22610(B) 0604 6" CONCRETE DRIVEWAY279SY $60.00 $81.00 $62.25 $63.86 $80.00
23611(A) 2657 MANHOLE (4' DIAMETER)2EA $3,500.00 $3,400.00 $3,360.00 $5,500.00 $4,000.00
24613(A) 0491 18" R.C.PIPE CLASS III271LF $75.00 $110.00 $56.00 $80.00 $80.00
25613(A) 0492 24" R.C.PIPE CLASS III119LF $90.00 $123.00 $77.75 $85.00 $90.00
26613(B) 0689 18" CORR. GALV. STEEL PIPE1,558LF $50.00 $35.25 $33.90 $60.00 $45.00
27613(B) 0690 24" CORR. GALV. STEEL PIPE294LF $45.00 $44.10 $38.95 $68.00 $50.00
28613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND2EA $800.00 $760.00 $875.00 $900.00 $600.00
29613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND4EA $900.00 $880.00 $1,170.00 $1,000.00 $800.00
30613(M) 7186 TYPE A4 CULVERT END TREATMENT64EA $1,000.00 $2,120.00 $1,150.00 $1,000.00 $1,000.00
31613(M) 7187 TYPE B4 CULVERT END TREATMENT12EA $1,200.00 $2,120.00 $1,200.00 $2,000.00 $1,100.00
32619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $25,000.00 $18,850.00 $15,000.00 $55,000.00 $27,000.00
33619(B) 4725 REMOVAL OF FENCE24,528LF $1.50 $1.25 $0.9000 $3.00 $1.00
34619(B) 4728 REMOVAL OF ASPHALT PAVEMENT38,655SY $4.50 $2.60 $4.10 $6.50 $5.00
35619(B) 4766 REMOVAL OF CONCRETE DRIVEWAY82SY $6.00 $17.45 $4.80 $25.00 $5.00
36619(B) 4767 REMOVAL OF ASPHALT DRIVEWAY796SY $6.00 $15.00 $4.80 $20.00 $5.00
37623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE225LF $20.00 $18.00 $17.40 $17.51 $18.00
38623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,750.00 $2,600.00 $2,560.00 $2,570.88 $2,600.00
39623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,000.00 $1,900.00 $1,850.00 $1,854.00 $2,000.00
40624(A) 4281 FENCE-STYLE WWF671LF $8.00 $6.50 $7.25 $7.10 $9.00
41624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)23,857LF $6.00 $4.00 $4.00 $3.90 $8.00
42624(D) 4470 GATE, GALVANIZED STEEL5EA $1,000.00 $325.00 $985.00 $1,500.00 $1,500.00
43629(A) 4958 MAILBOX INSTALLATION-SINGLE23EA $125.00 $95.00 $92.15 $92.70 $95.00
44629(B) 4959 MAILBOX INSTALLATION-MULTIPLE1EA $175.00 $155.00 $155.00 $154.50 $150.00
45629(C) 4960 MAILBOX23EA $45.00 $30.00 $30.70 $30.90 $35.00
46629(D) 4961 REMOVAL OF MAILBOX INSTALLATION24EA $60.00 $10.00 $10.25 $10.30 $15.00
47501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON110.2CY $30.00 $90.00 $87.05 $100.00 $100.00
48501(G) 6309 CLSM BACKFILL91.8CY $175.00 $320.00 $307.25 $200.00 $200.00
49504(A) 1304 APPROACH SLAB177.8SY $225.00 $370.00 $358.50 $175.00 $300.00
50504(B) 1305 SAW-CUT GROOVING164.4SY $5.00 $16.00 $10.50 $15.00 $15.00
51504(D) 6239 CONCRETE RAIL (TR3)111.4LF $80.00 $265.00 $256.05 $75.00 $225.00
52513(B) 6019 CLASS B BRIDGE DECK REPAIR78SY $300.00 $265.00 $256.05 $450.00 $200.00
53515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)80SY $5.00 $21.00 $20.50 $20.00 $15.00
54520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER97.2LF $30.00 $16.00 $15.35 $60.00 $30.00
55520(C) 6060 EPOXY RESIN, ABOVE WATER2.8GAL $130.00 $130.00 $128.00 $75.00 $110.00
56521(A) 6210 PNEUMATICALLY PLACED MORTAR11.1SY $700.00 $1,165.00 $1,127.00 $1,500.00 $700.00
57523(A) 6550 SEALER CRACK PREPARATION65.2LF $4.00 $5.25 $5.15 $15.00 $10.00
58523(B) 6560 SEALER RESIN0.6GAL $200.00 $210.00 $51.20 $2,000.00 $300.00
59613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND96LF $30.00 $68.00 $66.50 $75.00 $20.00
60613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.40LF $30.00 $78.00 $76.80 $75.00 $20.00
61619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $10,000.00 $12,750.00 $15,000.00 $25,000.00 $67,000.00
62202(A) 1301 UNCLASSIFIED EXCAVATION31CY $10.00 $53.00 $80.00 $100.00 $16.00
63501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED217CY $25.00 $80.00 $35.00 $100.00 $80.00
64509(A) 1326 CLASS AA CONCRETE354.1CY $800.00 $485.00 $485.00 $450.00 $800.00
65511(A) 1332 REINFORCING STEEL59,274LB $1.00 $0.7000 $1.00 $1.00 $1.00
66619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $20,000.00 $15,000.00 $20,000.00 $30,000.00 $87,000.00
67805(A) 8722 (PL)REMOVAL OF EXISTING SIGNS1LSUM $2,000.00 $525.00 $515.00 $515.00 $1,000.00
68850(A) 8110 SHEET ALUMINUM SIGNS260SF $25.00 $14.50 $14.30 $14.42 $15.00
69851(C) 8330 2 1/2" SQUARE TUBE POST260LF $10.00 $9.50 $9.25 $9.27 $10.00
70856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)63,874LF $0.5000 $0.4500 $0.3500 $0.3400 $0.3500
71856(A) 8555 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE)110LF $10.00 $6.30 $6.15 $6.18 $10.00
72856(B) 8860 TRAFFIC STRIPE(MULTI-POLY.)(ARROWS)2EA $250.00 $160.00 $155.00 $154.50 $200.00
73880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $40,000.00 $10,000.00 $20,000.00 $11,750.00 $63,024.05
74642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $40,000.00 $50,000.00 $75,000.00 $55,000.00 $85,000.00
75220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $6,000.00 $40,000.00 $2,500.00 $27,000.00
76640(A) 1426 FIELD OFFICE1EA $10,000.00 $12,500.00 $25,000.00 $7,000.00 $7,500.00
77641 1552 MOBILIZATION1LSUM $272,000.00 $61,000.00 $267,594.55 $285,000.00 $310,000.00