| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$60,000.00 |
$81,041.60 |
$40,152.00 |
$163,350.00 |
$32,000.00 |
$279,360.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 36,495 | CY |
$8.00 |
$7.00 |
$6.09 |
$8.50 |
$6.00 |
$11.60 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 85,432 | CY |
$9.50 |
$4.15 |
$8.61 |
$6.50 |
$6.00 |
$11.90 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$70,000.00 |
$64,000.00 |
$29,754.97 |
$29,000.00 |
$52,000.00 |
$118,300.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 8,354 | LF |
$2.00 |
$3.13 |
$2.62 |
$3.00 |
$4.40 |
$3.40 |
| 6 | 221(K) 0600 |
TEMPORARY FIBER LOG | 4,503 | LF |
$3.50 |
$5.22 |
$5.25 |
$5.00 |
$6.70 |
$5.65 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 50,053 | SY |
$1.25 |
$3.00 |
$2.77 |
$2.60 |
$3.20 |
$4.50 |
| 8 | 230(F) 2812 |
WATERING | 2,003 | KGAL |
$5.00 |
$10.00 |
$6.56 |
$6.25 |
$7.60 |
$17.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 10.34 | AC |
$475.00 |
$2,000.00 |
$3,061.95 |
$2,892.00 |
$3,550.00 |
$2,220.00 |
| 10 | 234(A) 2824 |
FERTILIZING (10-20-10) | 6 | TON |
$650.00 |
$900.00 |
$940.07 |
$900.00 |
$1,090.00 |
$2,260.00 |
| 11 | 234(A) 4409 |
FERTILIZING (18-46-0) | 1 | TON |
$750.00 |
$900.00 |
$940.07 |
$900.00 |
$2,490.00 |
$2,260.00 |
| 12 | 241 2832 |
MOWING | 43.84 | AC |
$75.00 |
$208.80 |
$166.53 |
$160.00 |
$195.00 |
$230.00 |
| 13 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 2 | EA |
$2,500.00 |
$3,325.27 |
$1,632.21 |
$5,600.00 |
$6,340.00 |
$2,830.00 |
| 14 | 307(K) 4300 |
STABILIZED SUBGRADE | 43,808 | SY |
$4.00 |
$6.00 |
$3.55 |
$5.80 |
$4.60 |
$2.95 |
| 15 | 407(B) 0250 |
TACK COAT | 1,883 | GAL |
$3.00 |
$2.50 |
$2.15 |
$3.55 |
$2.40 |
$2.45 |
| 16 | 408 5774 |
PRIME COAT | 3,611 | GAL |
$3.50 |
$2.50 |
$3.22 |
$3.50 |
$1.00 |
$3.70 |
| 17 | 409(A) 4242 |
FABRIC REINFORCEMENT | 1,359 | SY |
$1.50 |
$7.00 |
$2.15 |
$5.70 |
$2.40 |
$2.45 |
| 18 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 1,443 | TON |
$80.00 |
$74.00 |
$69.55 |
$76.00 |
$79.00 |
$79.50 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,037 | TON |
$90.00 |
$63.00 |
$63.61 |
$65.00 |
$72.50 |
$72.75 |
| 20 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 1,010 | TON |
$110.00 |
$84.00 |
$85.10 |
$87.00 |
$96.50 |
$97.25 |
| 21 | 412 5267 |
COLD MILLING PAVEMENT | 70,466 | SY |
$2.00 |
$0.8000 |
$1.35 |
$0.9000 |
$1.30 |
$1.45 |
| 22 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 268 | SY |
$14.00 |
$81.00 |
$19.20 |
$75.00 |
$17.00 |
$22.30 |
| 23 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 31,628 | SY |
$17.00 |
$13.00 |
$18.31 |
$18.00 |
$17.00 |
$22.50 |
| 24 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 7,974 | CY |
$120.00 |
$120.00 |
$124.19 |
$130.00 |
$145.00 |
$121.00 |
| 25 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 29 | CY |
$25.00 |
$38.00 |
$30.77 |
$50.00 |
$15.00 |
$26.90 |
| 26 | 509 6152 |
SPECIAL CONCRETE FINISH | 384 | SY |
$70.00 |
$20.00 |
$17.89 |
$20.00 |
$20.50 |
$79.25 |
| 27 | 509(A) 0319 |
CLASS AA CONCRETE | 6 | CY |
$500.00 |
$680.00 |
$732.62 |
$1,200.00 |
$830.00 |
$565.00 |
| 28 | 509(B) 0325 |
CLASS A CONCRETE(LONG. BAR. DES. 1-A) | 101 | CY |
$275.00 |
$750.00 |
$525.46 |
$750.00 |
$385.00 |
$1,120.00 |
| 29 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 3 | CY |
$700.00 |
$675.00 |
$120.00 |
$1,000.00 |
$1,000.00 |
$792.00 |
| 30 | 509(D) 0325 |
CLASS C CONCRETE | 50 | CY |
$275.00 |
$275.00 |
$425.63 |
$290.00 |
$345.00 |
$485.00 |
| 31 | 510(A) 6333 |
RETAINING WALL | 22 | SY |
$900.00 |
$825.00 |
$658.69 |
$950.00 |
$625.00 |
$1,040.00 |
| 32 | 511(A) 0332 |
REINFORCING STEEL | 5,578 | LB |
$1.00 |
$1.10 |
$1.25 |
$1.50 |
$1.20 |
$1.80 |
| 33 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 49 | TON |
$20.00 |
$68.00 |
$81.81 |
$55.00 |
$72.00 |
$129.00 |
| 34 | 602(C) 4155 |
FILTER FABRIC | 29 | SY |
$4.00 |
$21.00 |
$9.63 |
$12.00 |
$8.70 |
$15.50 |
| 35 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 7,057 | LF |
$6.00 |
$5.85 |
$5.10 |
$5.00 |
$2.50 |
$2.20 |
| 36 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 1,082 | LF |
$25.00 |
$36.00 |
$22.56 |
$34.00 |
$39.00 |
$41.50 |
| 37 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 3,768 | SY |
$35.00 |
$46.00 |
$43.19 |
$55.00 |
$57.50 |
$59.00 |
| 38 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 772 | SY |
$50.00 |
$74.50 |
$55.58 |
$75.00 |
$97.50 |
$78.00 |
| 39 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 197 | SF |
$20.00 |
$14.98 |
$23.80 |
$25.00 |
$33.00 |
$31.75 |
| 40 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 3 | EA |
$1,750.00 |
$1,565.97 |
$1,658.61 |
$3,000.00 |
$1,730.00 |
$1,980.00 |
| 41 | 611(G) 5113 |
INLET CI DES. 2 (B) | 6 | EA |
$4,000.00 |
$4,425.00 |
$3,961.92 |
$6,000.00 |
$5,000.00 |
$3,920.00 |
| 42 | 611(G) 5117 |
INLET CI DES. 2 (2B) | 5 | EA |
$4,750.00 |
$4,900.00 |
$5,044.14 |
$7,000.00 |
$5,340.00 |
$4,330.00 |
| 43 | 611(G) 5121 |
INLET CI DES. 3 (B) | 1 | EA |
$7,000.00 |
$6,150.00 |
$5,586.13 |
$8,000.00 |
$5,070.00 |
$5,400.00 |
| 44 | 611(G) 5699 |
INLET - LONGITUDINAL BARRIER - TYPE I, DES. 2 | 2 | EA |
$4,000.00 |
$7,830.00 |
$3,293.85 |
$5,000.00 |
$2,590.00 |
$2,500.00 |
| 45 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 21.24 | VF |
$300.00 |
$160.00 |
$612.84 |
$320.00 |
$210.00 |
$230.00 |
| 46 | 611(H) 5330 |
ADD'L DEPTH IN INLET CI DES. 3 | 0.36 | VF |
$350.00 |
$315.00 |
$755.75 |
$1,250.00 |
$310.00 |
$1,120.00 |
| 47 | 611(L) 0487 |
JUNCTION BOXES | 86 | CF |
$70.00 |
$78.50 |
$182.42 |
$195.00 |
$125.00 |
$297.00 |
| 48 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 354 | LF |
$60.00 |
$36.75 |
$36.87 |
$60.00 |
$79.50 |
$46.75 |
| 49 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 784 | LF |
$65.00 |
$49.50 |
$50.41 |
$75.00 |
$89.50 |
$53.50 |
| 50 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 78 | LF |
$75.00 |
$53.50 |
$57.63 |
$85.00 |
$91.00 |
$68.50 |
| 51 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 258 | LF |
$90.00 |
$68.50 |
$76.35 |
$100.00 |
$105.00 |
$70.00 |
| 52 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 586 | LF |
$180.00 |
$108.00 |
$117.29 |
$130.00 |
$170.00 |
$118.00 |
| 53 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 51 | LF |
$15.00 |
$25.00 |
$9.62 |
$25.00 |
$21.00 |
$30.25 |
| 54 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 608 | LF |
$16.00 |
$22.00 |
$12.00 |
$18.00 |
$25.00 |
$18.10 |
| 55 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 10 | LF |
$15.00 |
$55.00 |
$15.76 |
$25.00 |
$19.50 |
$42.50 |
| 56 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 203 | LF |
$16.00 |
$25.00 |
$17.90 |
$18.00 |
$20.00 |
$18.10 |
| 57 | 613(L) 4506 |
22" X 13" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$750.00 |
$965.00 |
$860.00 |
$1,000.00 |
$810.00 |
$1,930.00 |
| 58 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 3 | EA |
$800.00 |
$1,180.00 |
$1,082.01 |
$1,300.00 |
$1,020.00 |
$1,800.00 |
| 59 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 6 | EA |
$1,900.00 |
$2,280.00 |
$2,253.39 |
$2,300.00 |
$2,300.00 |
$2,940.00 |
| 60 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 9 | EA |
$600.00 |
$965.00 |
$859.67 |
$950.00 |
$810.00 |
$1,230.00 |
| 61 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 7 | EA |
$700.00 |
$1,145.00 |
$1,007.80 |
$1,200.00 |
$955.00 |
$1,850.00 |
| 62 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 3 | EA |
$500.00 |
$648.00 |
$692.81 |
$400.00 |
$315.00 |
$6,450.00 |
| 63 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 818 | CY |
$60.00 |
$38.75 |
$56.27 |
$60.00 |
$25.00 |
$26.40 |
| 64 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 294 | CY |
$40.00 |
$23.00 |
$28.84 |
$40.00 |
$20.00 |
$39.75 |
| 65 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 77 | CY |
$55.00 |
$44.00 |
$51.40 |
$80.00 |
$20.00 |
$62.25 |
| 66 | 613(V) 1180 |
TRENCH EXCAVATION | 965 | CY |
$7.00 |
$15.00 |
$7.65 |
$10.00 |
$5.00 |
$13.10 |
| 67 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$61,000.00 |
$15,228.47 |
$32,400.00 |
$9,780.00 |
$63,333.60 |
| 68 | 619(B) 4725 |
REMOVAL OF FENCE | 3,999 | LF |
$3.00 |
$5.67 |
$1.34 |
$2.00 |
$2.60 |
$2.55 |
| 69 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 1,213 | LF |
$6.00 |
$10.00 |
$4.13 |
$8.00 |
$8.00 |
$6.80 |
| 70 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 13,531 | SY |
$2.50 |
$2.10 |
$3.22 |
$2.60 |
$3.90 |
$4.30 |
| 71 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 531 | SY |
$9.50 |
$14.00 |
$9.43 |
$8.00 |
$7.60 |
$15.80 |
| 72 | 619(B) 4915 |
REMOVAL OF CONCRETE MEDIAN BARRIER | 190 | LF |
$7.00 |
$33.00 |
$7.34 |
$100.00 |
$19.00 |
$24.40 |
| 73 | 619(C) 0924 |
SAWING PAVEMENT | 5,173.34 | LF |
$3.50 |
$5.00 |
$4.39 |
$4.00 |
$3.20 |
$7.20 |
| 74 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 50 | LF |
$17.50 |
$26.10 |
$26.86 |
$26.00 |
$28.00 |
$28.30 |
| 75 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 2 | EA |
$2,300.00 |
$2,210.00 |
$2,272.29 |
$2,600.00 |
$3,150.00 |
$2,830.00 |
| 76 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$1,875.00 |
$2,200.00 |
$2,256.17 |
$2,800.00 |
$2,410.00 |
$2,150.00 |
| 77 | 624(A) 4281 |
FENCE-STYLE WWF | 1,964 | LF |
$6.00 |
$5.70 |
$5.91 |
$5.60 |
$9.80 |
$6.80 |
| 78 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 440 | CY |
$30.00 |
$21.00 |
$26.35 |
$75.00 |
$15.00 |
$25.20 |
| 79 | 501(G) 6309 |
CLSM BACKFILL | 449 | CY |
$180.00 |
$165.00 |
$132.36 |
$125.00 |
$185.00 |
$158.00 |
| 80 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 3,189.34 | LF |
$230.00 |
$230.00 |
$222.93 |
$260.00 |
$210.00 |
$230.00 |
| 81 | 504(A) 1304 |
APPROACH SLAB | 442.6 | SY |
$190.00 |
$188.00 |
$280.14 |
$180.00 |
$225.00 |
$225.00 |
| 82 | 504(B) 1305 |
SAW-CUT GROOVING | 3,114 | SY |
$5.00 |
$4.25 |
$4.35 |
$4.20 |
$4.90 |
$3.45 |
| 83 | 504(C) 6250 |
SEALED EXPANSION JOINT | 158 | LF |
$300.00 |
$314.00 |
$281.96 |
$225.00 |
$170.00 |
$224.00 |
| 84 | 504(E) 1381 |
CONCRETE PARAPET | 902.7 | LF |
$120.00 |
$94.00 |
$111.67 |
$160.00 |
$88.00 |
$197.00 |
| 85 | 506(A) 1322 |
STRUCTURAL STEEL | 3,520 | LB |
$3.00 |
$2.65 |
$2.52 |
$2.00 |
$1.90 |
$6.50 |
| 86 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 32 | EA |
$1,500.00 |
$1,900.00 |
$1,502.05 |
$2,500.00 |
$1,560.00 |
$1,930.00 |
| 87 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 32 | EA |
$1,500.00 |
$1,900.00 |
$1,525.88 |
$2,500.00 |
$1,560.00 |
$1,930.00 |
| 88 | 509 6152 |
SPECIAL CONCRETE FINISH | 4,806 | SY |
$40.00 |
$34.75 |
$17.89 |
$20.00 |
$20.50 |
$32.50 |
| 89 | 509(A) 1326 |
CLASS AA CONCRETE | 865.3 | CY |
$570.00 |
$650.00 |
$800.00 |
$525.00 |
$775.00 |
$1,080.00 |
| 90 | 509(B) 1328 |
CLASS A CONCRETE | 839.9 | CY |
$590.00 |
$650.00 |
$800.00 |
$850.00 |
$830.00 |
$648.00 |
| 91 | 510(C) 6135 |
SLOPE WALL (5") | 877 | SY |
$130.00 |
$135.00 |
$102.67 |
$120.00 |
$125.00 |
$75.50 |
| 92 | 511 6306 |
MECHANICAL SPLICES | 24 | EA |
$50.00 |
$26.25 |
$38.29 |
$40.00 |
$18.00 |
$153.00 |
| 93 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 396,830 | LB |
$1.05 |
$1.15 |
$1.12 |
$1.25 |
$1.10 |
$1.00 |
| 94 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 192 | LF |
$38.00 |
$36.00 |
$33.11 |
$42.00 |
$32.00 |
$42.50 |
| 95 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 969 | LF |
$46.00 |
$40.00 |
$42.84 |
$54.00 |
$41.50 |
$52.00 |
| 96 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 192 | LF |
$18.00 |
$16.00 |
$23.20 |
$12.00 |
$22.50 |
$251.00 |
| 97 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 969 | LF |
$18.00 |
$16.00 |
$24.36 |
$13.00 |
$23.50 |
$101.00 |
| 98 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 99 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 3,998 | SY |
$4.00 |
$4.20 |
$4.14 |
$4.00 |
$4.70 |
$3.85 |
| 100 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 520 | LF |
$900.00 |
$890.00 |
$991.43 |
$1,600.00 |
$915.00 |
$2,325.00 |
| 101 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 3 | EA |
$4,000.00 |
$8,350.00 |
$1,450.40 |
$2,500.00 |
$1,680.00 |
$1,530.00 |
| 102 | 523(A) 6550 |
SEALER CRACK PREPARATION | 75 | LF |
$5.00 |
$5.20 |
$5.37 |
$5.10 |
$6.10 |
$7.35 |
| 103 | 523(B) 6560 |
SEALER RESIN | 0.75 | GAL |
$200.00 |
$210.00 |
$214.88 |
$205.00 |
$245.00 |
$339.00 |
| 104 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 306 | LF |
$30.00 |
$55.00 |
$23.37 |
$20.00 |
$24.00 |
$50.50 |
| 105 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$30.00 |
$55.00 |
$19.18 |
$20.00 |
$11.00 |
$53.75 |
| 106 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 4 | EA |
$1,000.00 |
$3,100.00 |
$1,074.36 |
$400.00 |
$315.00 |
$968.00 |
| 107 | 624 4100 |
(PL) ORNAMENTAL FENCE | 903.34 | LF |
$600.00 |
$475.00 |
$451.80 |
$300.00 |
$360.00 |
$420.00 |
| 108 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 170 | CY |
$30.00 |
$26.00 |
$26.35 |
$70.00 |
$15.00 |
$51.50 |
| 109 | 501(G) 6309 |
CLSM BACKFILL | 310 | CY |
$180.00 |
$141.00 |
$132.35 |
$125.00 |
$185.00 |
$169.00 |
| 110 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 797.34 | LF |
$240.00 |
$225.00 |
$223.08 |
$260.00 |
$210.00 |
$220.00 |
| 111 | 504(A) 1304 |
APPROACH SLAB | 431.2 | SY |
$190.00 |
$225.00 |
$277.17 |
$180.00 |
$220.00 |
$234.00 |
| 112 | 504(B) 1305 |
SAW-CUT GROOVING | 1,031 | SY |
$5.00 |
$4.00 |
$4.35 |
$4.20 |
$4.90 |
$3.45 |
| 113 | 504(E) 1381 |
CONCRETE PARAPET | 299 | LF |
$100.00 |
$90.00 |
$92.58 |
$75.00 |
$55.00 |
$172.00 |
| 114 | 506(A) 1322 |
STRUCTURAL STEEL | 300 | LB |
$3.00 |
$5.00 |
$2.52 |
$2.00 |
$3.50 |
$6.35 |
| 115 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$1,000.00 |
$330.00 |
$458.96 |
$750.00 |
$400.00 |
$815.00 |
| 116 | 509(A) 1326 |
CLASS AA CONCRETE | 281 | CY |
$600.00 |
$675.00 |
$650.00 |
$600.00 |
$640.00 |
$826.00 |
| 117 | 509(B) 1328 |
CLASS A CONCRETE | 77.4 | CY |
$600.00 |
$890.00 |
$650.00 |
$1,250.00 |
$730.00 |
$868.00 |
| 118 | 511 6306 |
MECHANICAL SPLICES | 2 | EA |
$50.00 |
$16.00 |
$38.49 |
$40.00 |
$30.50 |
$179.00 |
| 119 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 87,520 | LB |
$1.10 |
$1.50 |
$1.12 |
$1.25 |
$1.10 |
$1.00 |
| 120 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 756 | LF |
$38.00 |
$37.00 |
$36.47 |
$47.00 |
$35.50 |
$46.00 |
| 121 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 756 | LF |
$18.00 |
$16.70 |
$26.81 |
$17.00 |
$29.00 |
$105.00 |
| 122 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 123 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 630 | SY |
$4.00 |
$4.00 |
$4.14 |
$4.00 |
$4.70 |
$6.10 |
| 124 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,380 | TON |
$50.00 |
$57.00 |
$59.02 |
$42.00 |
$50.00 |
$66.50 |
| 125 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 230 | TON |
$40.00 |
$67.00 |
$47.84 |
$32.00 |
$35.50 |
$88.75 |
| 126 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 152 | LF |
$30.00 |
$22.00 |
$22.09 |
$20.00 |
$24.00 |
$45.75 |
| 127 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 26 | LF |
$30.00 |
$26.00 |
$19.21 |
$20.00 |
$11.00 |
$52.50 |
| 128 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 132 | SF |
$20.00 |
$25.00 |
$25.78 |
$15.25 |
$18.50 |
$17.00 |
| 129 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 254 | LF |
$10.00 |
$7.50 |
$7.52 |
$10.25 |
$12.00 |
$11.30 |
| 130 | 853 9063 |
BARRIER DELINEATORS(TYPE 2, CODE 1) | 12 | EA |
$13.00 |
$15.00 |
$14.99 |
$15.25 |
$18.50 |
$17.00 |
| 131 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 5 | EA |
$15.50 |
$15.00 |
$14.67 |
$20.50 |
$30.50 |
$17.50 |
| 132 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 47,287 | LF |
$0.5000 |
$0.3400 |
$0.3400 |
$0.7200 |
$0.8500 |
$0.8000 |
| 133 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 4,497 | LF |
$1.25 |
$0.6500 |
$0.6400 |
$1.44 |
$1.70 |
$1.60 |
| 134 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 1,124 | LF |
$9.00 |
$4.30 |
$4.57 |
$3.05 |
$3.70 |
$3.40 |
| 135 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 28 | EA |
$225.00 |
$290.00 |
$295.45 |
$104.00 |
$120.00 |
$113.00 |
| 136 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 18,500 | LF |
$0.7500 |
$0.5000 |
$0.5400 |
$0.4600 |
$0.5500 |
$0.5000 |
| 137 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 4 | EA |
$23,000.00 |
$22,000.00 |
$23,098.90 |
$17,000.00 |
$20,150.00 |
$18,660.00 |
| 138 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$1,000.00 |
$1,500.00 |
$1,396.68 |
$515.00 |
$610.00 |
$565.00 |
| 139 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 60 | SD |
$150.00 |
$80.00 |
$80.58 |
$255.00 |
$305.00 |
$283.00 |
| 140 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 4,180 | EA |
$0.7500 |
$0.5500 |
$0.5700 |
$0.5100 |
$0.6000 |
$0.5500 |
| 141 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 225 | SD |
$8.00 |
$19.00 |
$19.34 |
$15.30 |
$18.50 |
$17.00 |
| 142 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,060 | LF |
$20.00 |
$12.00 |
$7.86 |
$40.00 |
$25.50 |
$22.60 |
| 143 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 2,060 | LF |
$8.00 |
$18.00 |
$10.22 |
$3.00 |
$3.80 |
$9.05 |
| 144 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 300 | SD |
$2.50 |
$1.00 |
$1.07 |
$26.00 |
$30.50 |
$28.30 |
| 145 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 43,124 | SD |
$1.00 |
$0.1600 |
$0.1600 |
$0.1100 |
$0.1000 |
$0.1000 |
| 146 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,170 | SD |
$5.00 |
$0.2600 |
$0.2700 |
$2.05 |
$2.40 |
$2.25 |
| 147 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 10,287 | SD |
$2.50 |
$1.77 |
$1.83 |
$2.05 |
$2.40 |
$2.25 |
| 148 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 7,056 | SD |
$3.00 |
$0.5200 |
$0.5400 |
$1.55 |
$1.80 |
$1.70 |
| 149 | 880(C) 8848 |
WING BARRICADES | 300 | SD |
$1.50 |
$7.31 |
$7.52 |
$5.15 |
$6.10 |
$5.65 |
| 150 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 19,999 | SD |
$0.5000 |
$0.4700 |
$0.4800 |
$0.2100 |
$0.2500 |
$0.2500 |
| 151 | 880(F) 8878 |
DRUMS | 27,210 | SD |
$0.5000 |
$0.5200 |
$0.5400 |
$0.5600 |
$0.6500 |
$0.6000 |
| 152 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 750 | HOUR |
$85.00 |
$65.00 |
$91.32 |
$67.00 |
$80.50 |
$73.50 |
| 153 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 3,202 | SD |
$7.00 |
$4.18 |
$4.30 |
$5.15 |
$6.10 |
$5.65 |
| 154 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 290 | LF |
$7.00 |
$11.00 |
$10.74 |
$10.40 |
$14.50 |
$11.30 |
| 155 | 802(B) 8344 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 726 | LF |
$25.00 |
$31.00 |
$31.16 |
$30.00 |
$42.50 |
$32.75 |
| 156 | 802(B) 8346 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 267 | LF |
$10.00 |
$11.00 |
$10.74 |
$10.25 |
$42.50 |
$11.30 |
| 157 | 803(A) 8065 |
PULL BOX(SIZE I) | 6 | EA |
$450.00 |
$558.00 |
$574.79 |
$554.00 |
$990.00 |
$605.00 |
| 158 | 803(A) 8066 |
PULL BOX(SIZE II) | 8 | EA |
$550.00 |
$616.00 |
$633.88 |
$610.00 |
$1,140.00 |
$667.00 |
| 159 | 804(A) 2915 |
STRUCTURAL CONCRETE | 81 | CY |
$750.00 |
$670.00 |
$689.74 |
$665.00 |
$975.00 |
$726.00 |
| 160 | 804(B) 2916 |
REINFORCING STEEL | 11,766 | LB |
$2.00 |
$1.65 |
$1.68 |
$1.60 |
$2.60 |
$1.75 |
| 161 | 806(A) 8311 |
32'MH POLE 35'TS & 10'LMA(G.STL.) | 3 | EA |
$11,550.00 |
$27,000.00 |
$27,557.52 |
$26,600.00 |
$40,300.00 |
$29,010.00 |
| 162 | 806(A) 8312 |
32'MH POLE 40'TS & 10'LMA(G.STL.) | 4 | EA |
$12,650.00 |
$30,000.00 |
$26,859.19 |
$25,900.00 |
$39,050.00 |
$28,270.00 |
| 163 | 806(A) 8313 |
32'MH POLE 45'TS & 10'LMA(G.STL.) | 3 | EA |
$13,750.00 |
$38,915.00 |
$40,047.04 |
$38,600.00 |
$58,600.00 |
$42,160.00 |
| 164 | 806(A) 8314 |
32'MH POLE 50'TS & 10'LMA(G.STL.) | 1 | EA |
$14,300.00 |
$39,671.14 |
$40,825.96 |
$39,400.00 |
$59,800.00 |
$42,980.00 |
| 165 | 806(A) 8350 |
32'MH POLE,30'TS & 10'LMA(G.STL.) | 1 | EA |
$10,450.00 |
$23,567.79 |
$24,253.84 |
$23,400.00 |
$36,600.00 |
$25,530.00 |
| 166 | 806(A) 8351 |
32'MH POLE 25',TS & 10'LMA(G.STL.) | 1 | EA |
$9,350.00 |
$22,497.71 |
$23,152.62 |
$22,300.00 |
$35,400.00 |
$24,370.00 |
| 167 | 806(A) 8353 |
32'MH POLE,55'TS & 10'LMA(G.STL.) | 1 | EA |
$37,400.00 |
$41,237.11 |
$42,437.51 |
$40,900.00 |
$62,250.00 |
$44,670.00 |
| 168 | 806(B) 8890 |
6' MTG.HT.TS PED.POLE(G.STL.) | 2 | EA |
$2,400.00 |
$1,513.77 |
$1,557.84 |
$1,500.00 |
$1,830.00 |
$1,640.00 |
| 169 | 806(B) 8892 |
8' MTG.HT.TS PED.POLE(G.STL.) | 4 | EA |
$2,800.00 |
$1,565.97 |
$1,611.55 |
$1,550.00 |
$2,070.00 |
$1,700.00 |
| 170 | 809(A) 8090 |
ROADWAY LUMINAIRE | 14 | EA |
$750.00 |
$1,826.96 |
$1,880.14 |
$1,800.00 |
$3,050.00 |
$1,980.00 |
| 171 | 811 8040 |
1/C NO.6 ELECTRICAL CONDUCTOR | 400 | LF |
$2.00 |
$2.09 |
$2.15 |
$2.05 |
$6.10 |
$2.25 |
| 172 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 1,813 | LF |
$2.25 |
$2.09 |
$2.15 |
$2.05 |
$1.50 |
$2.25 |
| 173 | 825 8550 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY | 4 | EA |
$31,000.00 |
$31,162.73 |
$32,069.87 |
$30,900.00 |
$43,950.00 |
$33,760.00 |
| 174 | 828 8132 |
(PL)DETECTION SYSTEM (VIDEO) | 1 | LSUM |
$104,000.00 |
$72,034.45 |
$74,131.35 |
$71,500.00 |
$119,600.00 |
$78,000.00 |
| 175 | 830 8000 |
PEDESTRIAN PUSH BUTTON | 10 | EA |
$800.00 |
$1,477.23 |
$1,520.23 |
$1,450.00 |
$2,010.00 |
$1,600.00 |
| 176 | 831 8231 |
1WAY 3SEC. ADJ. SIG. HD. S-6 | 28 | EA |
$800.00 |
$647.27 |
$666.11 |
$640.00 |
$975.00 |
$701.00 |
| 177 | 831 8275 |
1WAY 3SEC. ADJ. SIG. HD.S-12 | 2 | EA |
$900.00 |
$647.27 |
$666.11 |
$640.00 |
$975.00 |
$701.00 |
| 178 | 831 8280 |
1WAY 4SEC. ADJ. SIG. HD.S-13 | 10 | EA |
$1,100.00 |
$777.76 |
$800.40 |
$770.00 |
$1,190.00 |
$843.00 |
| 179 | 831 8295 |
1WAY 2SEC. ADJ. PED. SIG. HD. S-20 | 10 | EA |
$650.00 |
$438.47 |
$451.23 |
$435.00 |
$730.00 |
$475.00 |
| 180 | 833 3030 |
BACKPLATE | 40 | EA |
$150.00 |
$167.04 |
$171.90 |
$165.00 |
$255.00 |
$181.00 |
| 181 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 1,583 | LF |
$4.00 |
$3.13 |
$3.22 |
$3.10 |
$3.10 |
$3.40 |
| 182 | 834(A) 8208 |
7/C TRAFFIC SIGNAL ELECTRICAL CABLE | 984 | LF |
$4.25 |
$3.13 |
$3.22 |
$3.10 |
$3.40 |
$3.40 |
| 183 | 834(A) 8210 |
12/C TRAFFIC SIGNAL ELECTRICAL CABLE | 250 | LF |
$4.75 |
$4.18 |
$4.30 |
$4.10 |
$5.50 |
$4.50 |
| 184 | 834(A) 8211 |
15/C TRAFFIC SIGNAL ELECTRICAL CABLE | 440 | LF |
$5.00 |
$4.18 |
$4.30 |
$4.10 |
$6.40 |
$4.50 |
| 185 | 834(A) 8212 |
18/C TRAFFIC SIGNAL ELECTRICAL CABLE | 500 | LF |
$5.25 |
$4.18 |
$4.30 |
$4.10 |
$6.70 |
$4.50 |
| 186 | 834(B) 8220 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 105 | LF |
$1.75 |
$1.04 |
$1.07 |
$1.05 |
$2.40 |
$1.15 |
| 187 | 834(B) 8225 |
4/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 810 | LF |
$2.00 |
$2.09 |
$2.15 |
$2.05 |
$3.40 |
$2.25 |
| 188 | 840(B) 8593 |
E.P.S. OPTICAL DETECTOR | 14 | EA |
$1,000.00 |
$850.84 |
$875.61 |
$840.00 |
$5,320.00 |
$922.00 |
| 189 | 840(D) 8595 |
E.P.S. 2 CHANNEL PHASE SELECTOR | 8 | EA |
$2,200.00 |
$3,351.17 |
$3,448.72 |
$3,325.00 |
$6,040.00 |
$3,630.00 |
| 190 | 850(C) 8118 |
MAST ARM MOUNTED SIGNS(ALUMINUM) | 90 | SF |
$45.00 |
$46.98 |
$48.35 |
$46.50 |
$56.00 |
$51.00 |
| 191 | 802(A) 8302 |
1" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 3,000 | LF |
$30.00 |
$14.62 |
$15.04 |
$14.50 |
$18.50 |
$15.80 |
| 192 | 802(A) 8314 |
2" GALV. STEEL ELECTRICAL CONDUIT TRENCHED | 194 | LF |
$50.00 |
$20.36 |
$20.95 |
$20.00 |
$61.00 |
$22.10 |
| 193 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 154 | LF |
$15.00 |
$10.44 |
$10.74 |
$10.40 |
$14.50 |
$11.30 |
| 194 | 802(B) 8570 |
(PL)LIQUID TIGHT FLEXIBLE CONDUIT | 100 | LF |
$35.00 |
$15.66 |
$16.12 |
$15.50 |
$42.50 |
$17.00 |
| 195 | 802(E) 8370 |
JUNCTION BOX(6" X 6" X 4") | 200 | EA |
$500.00 |
$689.03 |
$709.08 |
$680.00 |
$155.00 |
$746.00 |
| 196 | 803(A) 8060 |
PULL BOX | 2 | EA |
$750.00 |
$809.09 |
$832.64 |
$799.98 |
$915.00 |
$877.00 |
| 197 | 809 8091 |
ENHANCEMENT LIGHTING (COMPLETE) | 1 | LSUM |
$169,000.00 |
$205,000.00 |
$202,990.97 |
$200,000.00 |
$461,300.00 |
$213,700.00 |
| 198 | 809(B) 8098 |
UNDERPASS LUMINIARE | 18 | EA |
$400.00 |
$678.59 |
$698.34 |
$674.00 |
$1,120.00 |
$735.00 |
| 199 | 810(A) 3118 |
SERVICE POLE | 1 | EA |
$3,500.00 |
$7,500.00 |
$4,791.68 |
$4,500.00 |
$11,950.00 |
$5,040.00 |
| 200 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 8,000 | LF |
$0.9200 |
$1.04 |
$1.07 |
$1.05 |
$2.60 |
$1.15 |
| 201 | 811 8046 |
1/C NO.12 ELECTRICAL CONDUCTOR | 600 | LF |
$1.00 |
$1.04 |
$1.07 |
$1.05 |
$2.40 |
$1.15 |
| 202 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$80,000.00 |
$75,000.00 |
$95,403.82 |
$50,000.00 |
$54,000.00 |
$175,000.00 |
| 203 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$15,000.00 |
$7,500.00 |
$1,750.00 |
$3,000.00 |
$5,650.00 |
| 204 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$22,946.54 |
$12,000.00 |
$12,000.00 |
$6,000.00 |
$230,000.00 |
| 205 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$475,000.00 |
$506,781.55 |
$530,000.00 |
$556,000.00 |
$562,000.00 |
$800,000.00 |