| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 18 | CY |
$30.00 |
$17.35 |
$42.32 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 521 | CY |
$14.47 |
$9.02 |
$29.14 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$2,000.00 |
$2,081.59 |
$3,598.07 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 949 | LF |
$2.04 |
$4.15 |
$3.20 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 56 | LF |
$10.98 |
$26.30 |
$20.28 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 1,412 | SY |
$3.07 |
$9.64 |
$7.44 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.29 | AC |
$309.39 |
$9,367.17 |
$7,225.14 |
| 8 | 241 2832 |
MOWING | 1 | AC |
$117.56 |
$548.15 |
$422.80 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 615 | CY |
$49.50 |
$32.20 |
$59.81 |
| 10 | 310(B) 0149 |
SUBGRADE, METHOD B | 269 | SY |
$5.10 |
$5.55 |
$11.04 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 43 | TON |
$113.59 |
$166.53 |
$284.21 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 211 | TON |
$109.52 |
$166.53 |
$130.54 |
| 13 | 501(G) 6309 |
CLSM BACKFILL | 266 | CY |
$124.09 |
$190.12 |
$140.80 |
| 14 | 510(C) 6138 |
SLOPE WALL (5") | 415 | SY |
$135.36 |
$52.04 |
$126.48 |
| 15 | 610(B) 5016 |
8" CONCRETE DRIVEWAY | 194 | SY |
$100.00 |
$62.49 |
$55.24 |
| 16 | 611(A) 2658 |
MANHOLE (5' DIAMETER) | 1 | EA |
$7,147.99 |
$4,440.73 |
$4,335.42 |
| 17 | 611(A) 2659 |
MANHOLE (6' DIAMETER) | 1 | EA |
$6,758.64 |
$4,995.82 |
$5,331.19 |
| 18 | 611(B) 2682 |
ADD'L.DEPTH IN MANHOLE (6' DIAMETER) | 4.51 | VF |
$512.16 |
$159.59 |
$213.81 |
| 19 | 611(G) 4012 |
SPECIAL INLET DRAIN | 1 | EA |
$5,000.00 |
$5,967.23 |
$6,066.73 |
| 20 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 92 | LF |
$70.00 |
$41.58 |
$120.81 |
| 21 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 10 | LF |
$102.00 |
$48.46 |
$219.63 |
| 22 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 309 | LF |
$160.00 |
$80.27 |
$154.53 |
| 23 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 519 | LF |
$240.00 |
$145.66 |
$165.03 |
| 24 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 125 | LF |
$23.79 |
$18.73 |
$14.53 |
| 25 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 16 | LF |
$20.00 |
$18.73 |
$15.20 |
| 26 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 1 | EA |
$1,816.88 |
$2,038.58 |
$2,313.86 |
| 27 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$500.00 |
$1,665.28 |
$1,521.16 |
| 28 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$5,000.00 |
$20,815.92 |
$60,505.86 |
| 29 | 619(B) 4725 |
REMOVAL OF FENCE | 127 | LF |
$1.00 |
$2.78 |
$8.53 |
| 30 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 194 | SY |
$14.26 |
$13.88 |
$9.37 |
| 31 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 244 | SY |
$9.89 |
$9.71 |
$9.19 |
| 32 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 106 | LF |
$4.93 |
$6.94 |
$16.17 |
| 33 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 946 | LF |
$5.24 |
$6.94 |
$12.50 |
| 34 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 375 | LF |
$17.77 |
$34.69 |
$19.80 |
| 35 | 623(C) 5202 |
BEAM GUARDRAIL THRIE-BEAM SINGLE | 25 | LF |
$75.00 |
$208.16 |
$48.17 |
| 36 | 623(E) 7113 |
BEAM GUARDRAIL TRANSITION SECTION | 4 | EA |
$1,000.00 |
$1,040.80 |
$428.16 |
| 37 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,246.06 |
$3,469.32 |
$2,515.41 |
| 38 | 624(A) 4281 |
FENCE-STYLE WWF | 131 | LF |
$12.31 |
$13.88 |
$26.76 |
| 39 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 15 | EA |
$14.50 |
$34.69 |
$16.06 |
| 40 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 180 | SD |
$7.75 |
$34.69 |
$26.76 |
| 41 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 975 | LF |
$24.86 |
$21.51 |
$16.59 |
| 42 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 540 | SD |
$0.8400 |
$2.78 |
$2.14 |
| 43 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 270 | SD |
$1.51 |
$2.78 |
$2.14 |
| 44 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 630 | SD |
$1.20 |
$2.78 |
$2.14 |
| 45 | 880(C) 8848 |
WING BARRICADES | 180 | SD |
$1.43 |
$2.78 |
$2.14 |
| 46 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 360 | SD |
$1.20 |
$2.78 |
$2.14 |
| 47 | 880(F) 8878 |
DRUMS | 810 | SD |
$0.3700 |
$1.39 |
$1.07 |
| 48 | 880(G) 8890 |
CHANNELIZER CONES | 90 | SD |
$0.3000 |
$1.39 |
$1.07 |
| 49 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$1,000.00 |
$5,550.91 |
$4,281.55 |
| 50 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$45,000.00 |
$40,035.96 |
$50,254.69 |