GRADE, DRAIN, AND SURFACE US -64 (CIMARRON AVE )/US-385/CITY STREET (MAIN ST): FROM 0.3 MILES SOUTH OF THE SH -325 JCT, EXTEND NORTH IN BOISE CITY . PROJECT LENGTH = 0.994 MILE

Let date
Thursday, November 14, 2019
Contract
190383
J/P numbers
20941(04)
District
Division 6
County
Cimarron
Highway
Limits
GRADE, DRAIN, AND SURFACE US -64 (CIMARRON AVE )/US-385/CITY STREET (MAIN ST): FROM 0.3 MILES SOUTH OF THE SH -325 JCT, EXTEND NORTH IN BOISE CITY . PROJECT LENGTH = 0.994 MILE
Project number
NHPP-034N(001)PM

Bidders 2

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$8,594,223
1 IHC Scott, INC. Low bidder $10,793,088 +25.6%
2 WEBBER, LLC $11,171,645 +30.0% +3.5%

Bid tab: unit prices 122 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 IHC Scott, INC.#2 WEBBER, LLC
1201(A) 0102 CLEARING AND GRUBBING1LSUM $3,000.00 $24,922.06 $50,002.70
2202(A) 0183 UNCLASSIFIED EXCAVATION10,648CY $20.00 $31.73 $20.00
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $4,000.00 $10,374.06 $4,800.00
4221(C) 2801 TEMPORARY SILT FENCE5,105LF $3.75 $5.71 $5.00
5221(K) 0600 TEMPORARY FIBER LOG360LF $7.00 $11.94 $11.00
6230(A) 2806 SOLID SLAB SODDING2,410SY $3.50 $15.22 $29.00
7233(A) 2817 VEGETATIVE MULCHING11.16AC $550.00 $1,268.17 $1,525.00
8241 2832 MOWING1AC $150.00 $105.68 $600.00
9305 0125 CALICHE BASE4,158CY $40.00 $143.41 $80.00
10307(K) 4300 STABILIZED SUBGRADE39,907SY $12.00 $12.71 $10.00
11402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E509TON $85.00 $116.12 $95.00
12408 5774 PRIME COAT23,322GAL $5.00 $5.13 $6.00
13411(I) 6310 SUPERPAVE, TYPE S4(PATCH)(PG64-22OK)60TON $300.00 $307.81 $361.00
14414(A) 0210 P.C.CONCRETE PAVEMENT(PLACEMENT)6,117SY $44.00 $49.81 $32.00
15414(B) 5725 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT )28,767SY $40.00 $46.02 $47.00
16414(G) 5275 P.C. CONCRETE FOR PAVEMENT9,206CY $205.00 $238.79 $310.00
17501(G) 6315 CLSM BACKFILL10CY $300.00 $455.70 $200.00
18509(D) 0325 CLASS C CONCRETE10CY $400.00 $623.52 $820.00
19609(A) 0300 CONCRETE CURB (6" BARRIER-INTEGRAL)1,517LF $15.00 $48.75 $3.00
20609(B) 1513 1'-8" COMB. CURB & GUTTER (6" BARRIER)2,541LF $35.00 $84.37 $44.00
21610(A) 0602 4" CONCRETE SIDEWALK3,859SY $85.00 $126.22 $73.00
22610(A) 0650 4" DECORATIVE CONCRETE SIDEWALK1,122SY $125.00 $157.10 $105.00
23610(B) 0604 6" CONCRETE DRIVEWAY2,135SY $80.00 $123.65 $90.00
24610(I) 4610 TACTILE WARNING DEVICE-NEW480SF $45.00 $76.67 $70.00
25611(A) 2657 MANHOLE (4' DIAMETER)2EA $3,000.00 $8,448.02 $5,000.00
26611(G) 5112 INLET CI DES. 2 (STD)1EA $4,100.00 $11,026.44 $5,700.00
27611(G) 6000 INLET (SMD-TYPE 1)1EA $3,000.00 $5,142.77 $5,900.00
28611(M) 4488 REPLACEMENT OF CAST IRON HOOD2EA $700.00 $1,507.34 $2,100.00
29612(A) 0641 MANHOLES ADJUST TO GRADE1EA $1,100.00 $2,291.00 $1,200.00
30613(A) 0400 12" R.C.PIPE CLASS III73LF $55.00 $166.72 $60.00
31613(A) 0491 18" R.C.PIPE CLASS III201LF $60.00 $179.81 $70.00
32619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $6,000.00 $21,322.82 $61,000.00
33619(B) 4726 REMOVAL OF CURB AND GUTTER5,334LF $8.00 $13.91 $10.00
34619(B) 4727 REMOVAL OF CONCRETE PAVEMENT999SY $12.00 $39.95 $50.00
35619(B) 4728 REMOVAL OF ASPHALT PAVEMENT36,528SY $6.00 $5.35 $10.00
36619(B) 4766 REMOVAL OF CONCRETE DRIVEWAY1,797SY $11.00 $10.67 $25.00
37619(B) 4792 REMOVAL OF SIDEWALK3,315SY $5.00 $11.57 $20.00
38622(A) 4743 1 1/2" PIPE RAILING86LF $200.00 $369.77 $250.00
39631(A) 0200 (SP)STATIONARY BOLLARD9EA $1,200.00 $543.17 $1,000.00
40648(C) 0305 (PL) UTILITY SYSTEM (ELECTRICAL)1LSUM $20,000.00 $13,471.71 $20,000.00
41616(B) 5218 2" POLYVINYL CHLORIDE (PVC) PIPE201LF $15.00 $106.71 $32.00
42616(B) 5221 4" POLYVINYL CHLORIDE (PVC) PIPE1,316LF $17.00 $66.69 $41.00
43616(B) 5223 6" POLYVINYL CHLORIDE (PVC) PIPE972LF $25.00 $71.82 $69.00
44616(B) 5225 8" POLYVINYL CHLORIDE (PVC) PIPE90LF $30.00 $205.20 $89.00
45616(D) 0862 8" VALVES1EA $10,000.00 $14,364.35 $4,100.00
46616(D) 1050 2" GATE VALVE5EA $1,000.00 $820.82 $1,700.00
47616(D) 1060 4" GATE VALVE15EA $1,800.00 $1,026.03 $1,800.00
48616(D) 1070 6" GATE VALVE9EA $2,100.00 $1,282.53 $2,100.00
49616(D) 1080 8" GATE VALVE4EA $3,000.00 $2,052.05 $2,500.00
50616(D) 8050 6" TAPPING VALVE AND BOX1EA $2,000.00 $3,591.09 $1,900.00
51616(G) 1192 FIRE HYDRANTS3EA $6,000.00 $6,156.15 $5,500.00
52616(I) 0075 4" STEEL CASING278LF $100.00 $133.38 $34.00
53616(I) 0100 8" STEEL CASING311LF $200.00 $215.47 $69.00
54616(I) 0125 12" STEEL CASING154LF $300.00 $225.73 $179.00
55616(I) 5256 10" STEEL CASING602LF $250.00 $184.68 $172.00
56616(N) 0090 SERVICE CONNECTION (SHORT)17EA $2,200.00 $1,436.44 $1,500.00
57616(N) 0094 WET CONNECTION (2")7EA $1,000.00 $1,026.03 $2,400.00
58616(N) 0095 WET CONNECTION (4")8EA $2,000.00 $1,282.53 $3,000.00
59616(N) 0096 WET CONNECTION (8")7EA $4,000.00 $3,078.08 $3,800.00
60616(N) 0098 WET CONNECTION (6")9EA $3,000.00 $2,565.06 $3,600.00
61616(O) 0100 FITTINGS49EA $500.00 $1,539.04 $700.00
62616(P) 0075 2" HDPE PIPE342LF $30.00 $41.04 $39.00
63616(P) 0100 4" HDPE PIPE400LF $50.00 $71.82 $48.00
64616(P) 0200 6" HDPE PIPE720LF $55.00 $76.95 $89.00
65616(P) 0300 8" HDPE PIPE184LF $60.00 $107.73 $103.00
66616(P) 0850 6" HDPE PIPE (BORED)113LF $135.00 $138.51 $220.00
67616(S) 0200 4" PLUG18EA $600.00 $513.01 $550.00
68616(S) 0210 6" PLUG3EA $700.00 $769.52 $650.00
69616(S) 0215 8" PLUG3EA $800.00 $1,539.04 $750.00
70619(B) 5949 REMOVAL OF FIRE HYDRANT3EA $1,000.00 $1,026.03 $6,200.00
71611(A) 2657 MANHOLE (4' DIAMETER)7EA $4,500.00 $12,825.31 $4,200.00
72615(B) 0300 SANITARY SEWER SERVICE CONNECTION1EA $1,000.00 $5,130.13 $3,100.00
73616(I) 0100 8" STEEL CASING125LF $300.00 $179.55 $124.00
74616(I) 0175 16" STEEL CASING272LF $500.00 $256.51 $240.00
75616(P) 0100 4" HDPE PIPE138LF $40.00 $66.69 $48.00
76616(P) 0400 10" HDPE PIPE108LF $45.00 $92.34 $206.00
77616(P) 0500 12" HDPE PIPE211LF $60.00 $143.64 $275.00
78619(B) 4742 REMOVAL OF MANHOLES5EA $2,500.00 $5,130.13 $1,375.00
79619(B) 5918 REMOVAL OF EXISTING PIPE457LF $11.00 $51.30 $22.00
80805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS29EA $60.00 $129.86 $150.00
81805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS7EA $190.00 $207.77 $250.00
82823 8478 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM220SD $240.00 $114.27 $140.00
83850(A) 8110 SHEET ALUMINUM SIGNS425SF $32.00 $37.40 $43.00
84851(C) 8327 2 1/4" SQUARE TUBE POST750LF $11.00 $7.27 $9.00
85856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)26,446LF $0.6000 $1.25 $1.50
86856(A) 8540 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE)2,535LF $0.5000 $2.60 $3.00
87856(A) 8555 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE)75LF $5.00 $4.16 $5.00
88856(B) 8860 TRAFFIC STRIPE(MULTI-POLY.)(ARROWS)4EA $180.00 $311.66 $350.00
89856(B) 8870 TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS)157EA $250.00 $15.58 $30.00
90857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)9,397LF $0.4500 $0.3300 $0.4000
91857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)35,000LF $0.4000 $0.8600 $1.00
92857(E) 8887 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-11,000EA $0.8000 $0.8300 $1.00
93857(E) 8890 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-21,000EA $0.7700 $0.8800 $1.00
94857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)15,000LF $0.4000 $0.9000 $1.00
95880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF25,000SD $0.1100 $1.60 $2.00
96880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF5,000SD $0.9000 $1.60 $2.00
97880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF10,000SD $2.00 $1.60 $2.00
98880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)10,000SD $0.6000 $0.2100 $0.2500
99880(C) 8848 WING BARRICADES2,000SD $0.3000 $5.17 $6.00
100880(E) 8860 WARNING LIGHTS(TYPE A)25,000SD $0.1700 $0.0800 $0.2500
101880(F) 8878 DRUMS10,000SD $0.1300 $0.0500 $0.2500
102880(G) 8884 TUBE CHANNELIZERS25,000SD $0.5200 $0.0500 $0.2500
103880(I) 8902 FLAGGER360SD $150.00 $206.68 $200.00
104882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN1,000SD $18.00 $8.27 $10.00
105802(A) 8310 2" GALV. STEEL ELECTRICAL CONDUIT EXPOSED80LF $35.00 $36.27 $42.00
106802(B) 8342 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED9,300LF $8.00 $15.54 $18.00
107802(C) 8550 HIGH DENSITY POLYETHYLENE (HDPE) CONDUIT BORED1,880LF $48.00 $25.91 $30.00
108803(A) 8065 PULL BOX(SIZE I)10EA $600.00 $1,139.91 $1,300.00
109804(A) 2915 STRUCTURAL CONCRETE62.64CY $790.00 $1,865.31 $2,000.00
110804(B) 2916 REINFORCING STEEL6,480LB $1.75 $2.85 $3.50
111805(A) 8711 REMOVAL OF POWER POLE1EA $800.00 $1,554.43 $1,900.00
112805(A) 8712 (PL)REMOVAL OF LIGHT POLE28EA $500.00 $839.39 $1,000.00
113806(E) 0200 DECORATIVE POLE AND MAST ARM108EA $6,500.00 $5,958.64 $7,500.00
114809(A) 8090 ROADWAY LUMINAIRE108EA $1,700.00 $2,424.91 $2,900.00
115810(A) 3118 SERVICE POLE3EA $1,100.00 $11,399.14 $14,000.00
116811 8038 1/C NO.4 ELECTRICAL CONDUCTOR18,210LF $2.60 $2.28 $2.70
117811 8044 1/C NO.10 ELECTRICAL CONDUCTOR11,245LF $1.10 $1.09 $1.30
118811 8046 1/C NO.12 ELECTRICAL CONDUCTOR14,040LF $1.25 $0.8300 $1.00
119642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $90,000.00 $110,810.70 $275,000.00
120220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $4,000.00 $6,036.25 $10,000.00
121640(A) 1426 FIELD OFFICE1EA $15,000.00 $20,120.83 $200,000.00
122641 1552 MOBILIZATION1LSUM $490,000.00 $479,234.35 $511,800.00