| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$16,000.00 |
$8,500.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$14,000.00 |
$23,500.00 |
$65,000.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$10,900.00 |
$15,000.00 |
| 4 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 7 | EA |
$270.00 |
$450.00 |
$2,270.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 1,349 | SY |
$3.50 |
$6.00 |
$27.00 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 932 | CY |
$58.00 |
$77.00 |
$74.00 |
| 7 | 310(B) 0149 |
SUBGRADE, METHOD B | 5,185 | SY |
$1.50 |
$3.60 |
$5.25 |
| 8 | 325 5271 |
SEPARATOR FABRIC | 6,114 | SY |
$2.00 |
$3.60 |
$3.00 |
| 9 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 159 | SY |
$25.00 |
$50.00 |
$90.00 |
| 10 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 4,618 | SY |
$28.00 |
$19.25 |
$22.50 |
| 11 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 964 | CY |
$150.00 |
$234.00 |
$157.00 |
| 12 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 1,449 | LF |
$7.00 |
$17.50 |
$6.60 |
| 13 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 174 | SY |
$64.00 |
$75.00 |
$114.00 |
| 14 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 387 | SY |
$80.00 |
$68.00 |
$73.00 |
| 15 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 88 | SF |
$60.00 |
$19.00 |
$17.00 |
| 16 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 1 | EA |
$2,800.00 |
$3,400.00 |
$3,240.00 |
| 17 | 611(A) 2659 |
MANHOLE (6' DIAMETER) | 2 | EA |
$4,500.00 |
$4,680.00 |
$5,940.00 |
| 18 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 1 | EA |
$3,300.00 |
$5,900.00 |
$3,240.00 |
| 19 | 611(G) 5113 |
INLET CI DES. 2 (B) | 2 | EA |
$4,500.00 |
$7,600.00 |
$4,320.00 |
| 20 | 611(G) 5115 |
INLET CI DES. 2 (D) | 1 | EA |
$5,200.00 |
$10,000.00 |
$6,480.00 |
| 21 | 611(G) 5119 |
INLET CI DES. 2 (2D) | 1 | EA |
$6,500.00 |
$13,200.00 |
$8,100.00 |
| 22 | 611(G) 5124 |
INLET CI DES. 3 (B-D) | 2 | EA |
$7,500.00 |
$14,000.00 |
$10,260.00 |
| 23 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 40 | LF |
$70.00 |
$120.00 |
$65.00 |
| 24 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 154 | LF |
$72.00 |
$95.00 |
$76.00 |
| 25 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 316 | LF |
$106.00 |
$133.00 |
$119.00 |
| 26 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$13,000.00 |
$303.50 |
$30,000.00 |
| 27 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 1,340 | LF |
$7.00 |
$2.50 |
$15.00 |
| 28 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 1,452 | SY |
$10.00 |
$15.00 |
$12.00 |
| 29 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,977 | SY |
$7.00 |
$11.25 |
$10.00 |
| 30 | 619(B) 4741 |
REMOVAL OF DRAINAGE INLETS | 6 | EA |
$7.00 |
$280.00 |
$1,500.00 |
| 31 | 619(B) 4742 |
REMOVAL OF MANHOLES | 2 | EA |
$400.00 |
$280.00 |
$27.00 |
| 32 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 168 | SY |
$11.00 |
$12.00 |
$21.00 |
| 33 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 443 | LF |
$12.00 |
$25.50 |
$27.00 |
| 34 | 616(P) 0100 |
4" HDPE PIPE | 16 | LF |
$15.00 |
$30.00 |
$37.80 |
| 35 | 616(P) 0825 |
4" HDPE PIPE (BORED) | 236 | LF |
$45.00 |
$53.50 |
$60.50 |
| 36 | 802(C) 8552 |
2" HIGH DENSITY PE PIPE - BORED | 335 | LF |
$27.00 |
$53.50 |
$32.40 |
| 37 | 802(C) 8557 |
2" HIGH DENSITY PE PIPE - TRENCHED | 80 | LF |
$8.30 |
$24.00 |
$19.50 |
| 38 | 802(C) 8558 |
3" HIGH DENSITY PE PIPE - TRENCHED | 50 | LF |
$9.00 |
$18.00 |
$23.80 |
| 39 | 803(A) 8060 |
PULL BOX | 1 | EA |
$1,000.00 |
$950.00 |
$1,200.00 |
| 40 | 803(A) 8066 |
PULL BOX(SIZE II) | 3 | EA |
$700.00 |
$1,130.00 |
$962.00 |
| 41 | 803(B) 8085 |
GROUND BOX (GB36) | 2 | EA |
$1,500.00 |
$1,785.00 |
$4,105.00 |
| 42 | 803(B) 8105 |
GROUND BOX (R48) | 1 | EA |
$3,300.00 |
$3,000.00 |
$4,970.00 |
| 43 | 804(A) 2915 |
STRUCTURAL CONCRETE | 24.8 | CY |
$570.00 |
$950.00 |
$810.00 |
| 44 | 804(B) 2916 |
REINFORCING STEEL | 3,562 | LB |
$1.50 |
$1.50 |
$2.15 |
| 45 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 5 | EA |
$47.10 |
$30.00 |
$27.00 |
| 46 | 806(A) 8295 |
32'MTG.HT.POLE 25'T.S.&15'L. MST.ARM(G.STL.) | 2 | EA |
$12,000.00 |
$16,400.00 |
$16,750.00 |
| 47 | 806(A) 8324 |
32'MH POLE 45'TS & 15'LMA(G.STL.) | 2 | EA |
$18,000.00 |
$26,000.00 |
$23,550.00 |
| 48 | 806(B) 8894 |
10' MTG.HT.TS PED.POLE(G.STL.) | 4 | EA |
$1,000.00 |
$1,000.00 |
$1,075.00 |
| 49 | 809(A) 8090 |
ROADWAY LUMINAIRE | 4 | EA |
$1,500.00 |
$1,400.00 |
$1,585.00 |
| 50 | 810(A) 3118 |
SERVICE POLE | 1 | EA |
$2,500.00 |
$600.00 |
$1,070.00 |
| 51 | 811 8040 |
1/C NO.6 ELECTRICAL CONDUCTOR | 150 | LF |
$1.80 |
$2.40 |
$4.30 |
| 52 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 1,008 | LF |
$1.00 |
$1.20 |
$1.10 |
| 53 | 818(A) 8710 |
(SP)FIBER OPTIC CABLE, 12 SMF | 20 | LF |
$3.50 |
$40.00 |
$54.00 |
| 54 | 818(A) 8733 |
(SP)FIBER OPTIC CABLE, 144 SMF | 910 | LF |
$4.00 |
$6.50 |
$16.20 |
| 55 | 818(B) 8743 |
(SP)FIBER OPTIC PATCH PANEL, 12 PORT | 1 | EA |
$1,000.00 |
$1,400.00 |
$1,075.00 |
| 56 | 818(C) 8735 |
(SP)FIBER OPTIC CABLE SPLICE | 292 | EA |
$60.00 |
$41.50 |
$59.50 |
| 57 | 818(D) 8740 |
(SP)FIBER OPTIC CABLE TERMINATION | 12 | EA |
$60.00 |
$65.00 |
$250.00 |
| 58 | 818(F) 8370 |
(SP) SHIELD ISOLATION PEDESTAL | 1 | EA |
$120.00 |
$150.00 |
$200.00 |
| 59 | 818(G) 5570 |
(SP)FIBER OPTIC ROUTE SIGN & INSTALLATION | 3 | EA |
$80.00 |
$120.00 |
$71.50 |
| 60 | 819 8780 |
(PL)FIBER OPTIC & COMMUNICATION EQUIPMENT | 1 | LSUM |
$20,000.00 |
$22,850.00 |
$23,060.00 |
| 61 | 824(C) 6551 |
(SP)CABINET | 1 | EA |
$10,000.00 |
$37,000.00 |
$39,450.00 |
| 62 | 825 8550 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY | 1 | EA |
$30,000.00 |
$53,300.00 |
$39,450.00 |
| 63 | 828 8132 |
(PL)DETECTION SYSTEM (VIDEO) | 1 | LSUM |
$50,000.00 |
$38,000.00 |
$39,450.00 |
| 64 | 830 8000 |
PEDESTRIAN PUSH BUTTON | 8 | EA |
$1,000.00 |
$1,400.00 |
$1,580.00 |
| 65 | 831 8231 |
1WAY 3SEC. ADJ. SIG. HD. S-6 | 8 | EA |
$725.00 |
$900.00 |
$705.00 |
| 66 | 831 8280 |
1WAY 4SEC. ADJ. SIG. HD.S-13 | 2 | EA |
$900.00 |
$1,075.00 |
$1,070.00 |
| 67 | 831 8295 |
1WAY 2SEC. ADJ. PED. SIG. HD. S-20 | 8 | EA |
$650.00 |
$715.00 |
$632.00 |
| 68 | 833 3030 |
BACKPLATE | 10 | EA |
$200.00 |
$360.00 |
$205.00 |
| 69 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 968 | LF |
$1.50 |
$4.25 |
$3.30 |
| 70 | 834(A) 8208 |
7/C TRAFFIC SIGNAL ELECTRICAL CABLE | 135 | LF |
$3.00 |
$4.50 |
$4.30 |
| 71 | 834(A) 8213 |
21/C TRAFFIC SIGNAL ELECTRICAL CABLE | 412 | LF |
$5.50 |
$5.00 |
$5.40 |
| 72 | 834(B) 8220 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 142 | LF |
$2.50 |
$5.50 |
$2.15 |
| 73 | 840(A) 8592 |
E.P.S. OPTICAL EMITTER | 1 | EA |
$1,700.00 |
$6,000.00 |
$5,400.00 |
| 74 | 840(B) 8593 |
E.P.S. OPTICAL DETECTOR | 1 | EA |
$800.00 |
$1,135.00 |
$5,400.00 |
| 75 | 840(C) 8594 |
E.P.S. OPTICAL DETECTOR CABLE | 51 | LF |
$1.50 |
$1.20 |
$5.40 |
| 76 | 840(D) 8595 |
E.P.S. 2 CHANNEL PHASE SELECTOR | 3 | EA |
$2,500.00 |
$4,750.00 |
$4,140.00 |
| 77 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 31 | SF |
$18.00 |
$18.00 |
$16.20 |
| 78 | 850(C) 8118 |
MAST ARM MOUNTED SIGNS(ALUMINUM) | 66 | SF |
$70.00 |
$335.00 |
$214.00 |
| 79 | 851(B) 3216 |
2"@3.65 GALV.STEEL PIPE POST | 54 | LF |
$12.00 |
$19.00 |
$17.30 |
| 80 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 126 | LF |
$0.4000 |
$0.6000 |
$0.5500 |
| 81 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 2,640 | LF |
$6.00 |
$0.6000 |
$0.5500 |
| 82 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 198 | LF |
$1.00 |
$0.6000 |
$0.5500 |
| 83 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 456 | LF |
$4.00 |
$0.6000 |
$0.5500 |
| 84 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 6 | EA |
$175.00 |
$60.00 |
$54.00 |
| 85 | 855(A) 8827 |
TRAFFIC STRIPE(PLASTIC)(TAPE)(4" WIDE) | 2,450 | LF |
$0.9000 |
$0.8000 |
$0.7500 |
| 86 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 588 | LF |
$23.60 |
$21.25 |
$19.50 |
| 87 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 825 | LF |
$3.00 |
$2.25 |
$2.15 |
| 88 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 253 | SD |
$0.5000 |
$1.20 |
$1.10 |
| 89 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 373 | SD |
$1.00 |
$5.00 |
$4.30 |
| 90 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 347 | SD |
$0.5000 |
$5.00 |
$4.30 |
| 91 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 694 | SD |
$0.5000 |
$8.25 |
$7.60 |
| 92 | 880(F) 8878 |
DRUMS | 1,751 | SD |
$0.3000 |
$1.20 |
$1.10 |
| 93 | 802(C) 8552 |
2" HIGH DENSITY PE PIPE - BORED | 560 | LF |
$30.00 |
$54.00 |
$32.40 |
| 94 | 802(C) 8557 |
2" HIGH DENSITY PE PIPE - TRENCHED | 2,350 | LF |
$8.00 |
$12.00 |
$16.20 |
| 95 | 803(A) 8060 |
PULL BOX | 7 | EA |
$600.00 |
$1,000.00 |
$740.00 |
| 96 | 804(A) 2915 |
STRUCTURAL CONCRETE | 21.32 | CY |
$600.00 |
$950.00 |
$810.00 |
| 97 | 804(B) 2916 |
REINFORCING STEEL | 3,692 | LB |
$2.50 |
$1.50 |
$2.15 |
| 98 | 805(A) 8712 |
(PL)REMOVAL OF LIGHT POLE | 6 | EA |
$300.00 |
$600.00 |
$720.00 |
| 99 | 806(C) 8928 |
40' MTG.HT.POLE & 15' H.L.MST.ARM(G.STL.) | 13 | EA |
$4,000.00 |
$3,800.00 |
$4,650.00 |
| 100 | 809(A) 8090 |
ROADWAY LUMINAIRE | 13 | EA |
$2,500.00 |
$2,000.00 |
$1,900.00 |
| 101 | 810(A) 3118 |
SERVICE POLE | 1 | EA |
$5,000.00 |
$12,500.00 |
$7,115.00 |
| 102 | 811 8036 |
1/C NO.2 ELECTRICAL CONDUCTOR | 420 | LF |
$2.00 |
$12.00 |
$4.30 |
| 103 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 10,500 | LF |
$1.50 |
$1.50 |
$1.10 |
| 104 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$4,300.00 |
$16,200.00 |
| 105 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,858.20 |
$3,000.00 |
$8,500.00 |
| 106 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$73,000.00 |
$24,200.00 |
$100,545.75 |