| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$7,500.00 |
$7,500.00 |
$5,000.00 |
$1,000.00 |
$18,695.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 11,681 | CY |
$16.00 |
$14.00 |
$12.00 |
$16.00 |
$18.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 500 | CY |
$18.00 |
$14.50 |
$16.00 |
$16.00 |
$58.30 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$17,000.00 |
$10,000.00 |
$30,000.00 |
$50,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 420 | LF |
$1.50 |
$2.25 |
$4.25 |
$6.50 |
$6.20 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 11 | EA |
$200.00 |
$200.00 |
$825.00 |
$600.00 |
$620.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 126 | LF |
$7.50 |
$10.50 |
$27.00 |
$25.00 |
$24.80 |
| 8 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 6 | CY |
$110.00 |
$125.00 |
$425.00 |
$350.00 |
$372.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 5,422.74 | SY |
$2.50 |
$2.40 |
$5.50 |
$9.50 |
$8.70 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.12 | AC |
$1,000.00 |
$1,100.00 |
$4,700.00 |
$4,000.00 |
$4,960.00 |
| 11 | 241 2832 |
MOWING | 2.24 | AC |
$175.00 |
$160.00 |
$800.00 |
$200.00 |
$248.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 12,153.52 | SY |
$8.00 |
$7.80 |
$6.50 |
$13.00 |
$16.80 |
| 13 | 310(B) 0149 |
SUBGRADE, METHOD B | 1,907.31 | SY |
$5.00 |
$2.00 |
$1.50 |
$8.00 |
$9.60 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 425 | TON |
$40.00 |
$40.00 |
$30.00 |
$60.00 |
$105.50 |
| 15 | 407(B) 0250 |
TACK COAT | 5,241.06 | GAL |
$3.50 |
$2.50 |
$3.00 |
$4.00 |
$5.40 |
| 16 | 408 5774 |
PRIME COAT | 5,095.67 | GAL |
$5.00 |
$3.00 |
$5.00 |
$4.00 |
$9.20 |
| 17 | 409(A) 4242 |
FABRIC REINFORCEMENT | 1,385.56 | SY |
$3.50 |
$2.00 |
$6.00 |
$8.00 |
$6.45 |
| 18 | 409(B) 4268 |
BITUMINOUS BINDER | 277.11 | GAL |
$10.00 |
$8.00 |
$6.00 |
$22.00 |
$15.20 |
| 19 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 2,045.64 | TON |
$90.00 |
$95.00 |
$95.00 |
$132.00 |
$100.00 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,944.88 | TON |
$85.00 |
$85.00 |
$83.00 |
$100.00 |
$85.00 |
| 21 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 1,166.47 | TON |
$100.00 |
$105.00 |
$106.00 |
$147.00 |
$104.50 |
| 22 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 304.32 | TON |
$110.00 |
$95.00 |
$90.00 |
$135.00 |
$143.00 |
| 23 | 412 5267 |
COLD MILLING PAVEMENT | 1,146.67 | SY |
$6.50 |
$6.00 |
$6.00 |
$15.00 |
$15.00 |
| 24 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 5 | CY |
$50.00 |
$45.00 |
$43.00 |
$100.00 |
$348.50 |
| 25 | 509(A) 0319 |
CLASS AA CONCRETE | 22 | CY |
$650.00 |
$800.00 |
$850.00 |
$915.00 |
$975.50 |
| 26 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 9 | CY |
$750.00 |
$450.00 |
$1,100.00 |
$915.00 |
$1,038.00 |
| 27 | 509(D) 0325 |
CLASS C CONCRETE | 50 | CY |
$370.00 |
$300.00 |
$150.00 |
$250.00 |
$349.00 |
| 28 | 511(A) 0332 |
REINFORCING STEEL | 3,376 | LB |
$1.50 |
$1.00 |
$2.25 |
$1.60 |
$9.75 |
| 29 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 310 | LF |
$12.75 |
$8.00 |
$15.00 |
$16.00 |
$18.60 |
| 30 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 2,545 | LF |
$23.00 |
$37.00 |
$24.00 |
$33.00 |
$33.50 |
| 31 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 1,289.67 | SY |
$65.00 |
$65.00 |
$58.00 |
$85.00 |
$79.40 |
| 32 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 2 | EA |
$3,000.00 |
$1,900.00 |
$1,850.00 |
$2,100.00 |
$8,677.00 |
| 33 | 611(B) 2680 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | 2.41 | VF |
$200.00 |
$200.00 |
$325.00 |
$250.00 |
$3,279.00 |
| 34 | 611(G) 5113 |
INLET CI DES. 2 (B) | 2 | EA |
$4,200.00 |
$4,300.00 |
$4,700.00 |
$5,000.00 |
$11,170.00 |
| 35 | 611(G) 5115 |
INLET CI DES. 2 (D) | 2 | EA |
$5,200.00 |
$5,200.00 |
$5,700.00 |
$5,700.00 |
$16,660.00 |
| 36 | 611(G) 5120 |
INLET CI DES. 3 (STD) | 1 | EA |
$6,000.00 |
$5,500.00 |
$6,200.00 |
$4,600.00 |
$11,130.00 |
| 37 | 611(G) 5125 |
INLET CI DES. 3 (2D) | 2 | EA |
$7,500.00 |
$8,500.00 |
$10,000.00 |
$10,500.00 |
$12,320.00 |
| 38 | 611(G) 6000 |
INLET (SMD-TYPE 1) | 4 | EA |
$3,000.00 |
$2,600.00 |
$3,100.00 |
$5,000.00 |
$9,828.00 |
| 39 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 2 | VF |
$400.00 |
$400.00 |
$375.00 |
$450.00 |
$4,113.00 |
| 40 | 611(H) 5330 |
ADD'L DEPTH IN INLET CI DES. 3 | 5 | VF |
$450.00 |
$450.00 |
$450.00 |
$550.00 |
$2,752.00 |
| 41 | 611(L) 0487 |
JUNCTION BOXES | 254.91 | CF |
$75.00 |
$105.00 |
$74.00 |
$110.00 |
$375.00 |
| 42 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 240 | LF |
$70.00 |
$58.00 |
$59.00 |
$75.00 |
$150.00 |
| 43 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 354 | LF |
$75.00 |
$72.00 |
$73.00 |
$90.00 |
$160.00 |
| 44 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 256 | LF |
$95.00 |
$88.00 |
$87.00 |
$100.00 |
$175.00 |
| 45 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 296 | LF |
$135.00 |
$110.00 |
$115.00 |
$125.00 |
$180.00 |
| 46 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 300 | LF |
$150.00 |
$145.00 |
$135.00 |
$135.00 |
$195.00 |
| 47 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 132 | LF |
$140.00 |
$115.00 |
$115.00 |
$100.00 |
$168.00 |
| 48 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 200 | LF |
$16.00 |
$8.00 |
$35.00 |
$35.00 |
$34.90 |
| 49 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$14.00 |
$7.50 |
$35.00 |
$35.00 |
$34.90 |
| 50 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 2 | EA |
$800.00 |
$500.00 |
$500.00 |
$600.00 |
$2,018.00 |
| 51 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$18,000.00 |
$12,000.00 |
$36,400.00 |
$85,000.00 |
| 52 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 380 | LF |
$6.50 |
$6.00 |
$10.00 |
$25.00 |
$51.20 |
| 53 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 8,847.62 | SY |
$5.50 |
$3.50 |
$6.00 |
$7.00 |
$12.70 |
| 54 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 343.87 | SY |
$12.00 |
$12.00 |
$12.00 |
$30.00 |
$113.00 |
| 55 | 619(B) 4775 |
REMOVAL OF CONCRETE CURB OPENING | 12.51 | SY |
$17.00 |
$13.00 |
$33.00 |
$50.00 |
$155.50 |
| 56 | 619(C) 0924 |
SAWING PAVEMENT | 5,032 | LF |
$3.50 |
$3.50 |
$3.00 |
$5.00 |
$2.00 |
| 57 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 2 | EA |
$100.00 |
$105.00 |
$200.00 |
$230.00 |
$186.00 |
| 58 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$220.00 |
$210.00 |
$270.00 |
$310.00 |
$248.00 |
| 59 | 629(C) 4960 |
MAILBOX | 4 | EA |
$55.00 |
$50.00 |
$33.00 |
$40.00 |
$105.50 |
| 60 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 4 | EA |
$65.00 |
$25.00 |
$49.00 |
$55.00 |
$60.00 |
| 61 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$2,000.00 |
$1,500.00 |
$675.00 |
$750.00 |
$62.00 |
| 62 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 61.16 | SF |
$23.00 |
$24.00 |
$29.00 |
$32.00 |
$22.30 |
| 63 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 113.5 | LF |
$12.00 |
$13.00 |
$10.00 |
$11.00 |
$12.40 |
| 64 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 7,065 | LF |
$0.5000 |
$0.5300 |
$1.20 |
$1.35 |
$1.30 |
| 65 | 855(A) 8818 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 340 | LF |
$1.85 |
$2.10 |
$1.50 |
$1.70 |
$3.75 |
| 66 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 85 | LF |
$7.25 |
$8.40 |
$5.00 |
$8.00 |
$7.45 |
| 67 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 17 | EA |
$160.00 |
$155.00 |
$105.00 |
$120.00 |
$250.00 |
| 68 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 6,810 | LF |
$0.1800 |
$0.3300 |
$0.9000 |
$1.00 |
$0.3100 |
| 69 | 802(B) 8336 |
1 1/2" PVC SCH.40 PLASTIC CONDUIT BORED | 50 | LF |
$25.00 |
$26.00 |
$220.00 |
$32.00 |
$123.50 |
| 70 | 802(B) 8338 |
1 1/2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 275 | LF |
$10.00 |
$11.00 |
$54.00 |
$12.50 |
$16.20 |
| 71 | 803(A) 8065 |
PULL BOX(SIZE I) | 1 | EA |
$650.00 |
$800.00 |
$2,200.00 |
$950.00 |
$1,500.00 |
| 72 | 828(A) 8142 |
VEHICLE LOOP DETECTOR | 3 | EA |
$300.00 |
$260.00 |
$5,400.00 |
$310.00 |
$325.00 |
| 73 | 828(B) 8136 |
LOOP DETECTOR WIRE | 1,008 | LF |
$8.00 |
$10.00 |
$22.00 |
$12.00 |
$15.00 |
| 74 | 834(B) 8220 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 400 | LF |
$1.15 |
$2.60 |
$11.00 |
$3.15 |
$3.25 |
| 75 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 19,100 | LF |
$0.1500 |
$0.2200 |
$0.2500 |
$0.2200 |
$0.3500 |
| 76 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 480 | SD |
$12.00 |
$10.50 |
$9.00 |
$15.00 |
$18.60 |
| 77 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,700 | LF |
$25.00 |
$9.00 |
$22.00 |
$25.00 |
$27.50 |
| 78 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 3,800 | LF |
$5.50 |
$6.00 |
$2.00 |
$1.30 |
$19.90 |
| 79 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,410 | SD |
$0.4200 |
$0.2100 |
$0.0500 |
$0.0300 |
$0.5000 |
| 80 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,780 | SD |
$0.5000 |
$0.2100 |
$1.75 |
$2.00 |
$1.25 |
| 81 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,600 | SD |
$1.50 |
$1.05 |
$2.00 |
$2.25 |
$2.50 |
| 82 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 720 | SD |
$0.7000 |
$5.25 |
$1.10 |
$1.25 |
$1.85 |
| 83 | 880(C) 8848 |
WING BARRICADES | 3,600 | SD |
$2.00 |
$0.2500 |
$0.0500 |
$0.0300 |
$1.25 |
| 84 | 880(D) 8854 |
VERTICAL PANELS | 7,560 | SD |
$0.1500 |
$0.1000 |
$0.0500 |
$0.0300 |
$0.3500 |
| 85 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 6,300 | SD |
$0.3000 |
$1.50 |
$0.5500 |
$0.6500 |
$0.3500 |
| 86 | 880(F) 8878 |
DRUMS | 7,980 | SD |
$0.2000 |
$0.5100 |
$0.0500 |
$0.0700 |
$0.3500 |
| 87 | 880(I) 8902 |
FLAGGER | 20 | SD |
$160.00 |
$160.00 |
$110.00 |
$1,500.00 |
$845.00 |
| 88 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 360 | SD |
$12.00 |
$16.00 |
$16.00 |
$20.00 |
$35.00 |
| 89 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$35,000.00 |
$14,500.00 |
$25,000.00 |
$35,000.00 |
$31,000.00 |
| 90 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$12,000.00 |
$10,000.00 |
$7,500.00 |
| 91 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$126,000.00 |
$121,000.00 |
$90,000.00 |
$154,000.00 |
$145,161.83 |