| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$16,174.50 |
$7,500.00 |
$17,600.00 |
$29,260.00 |
$18,000.00 |
$10,000.00 |
$12,610.73 |
$11,550.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,120 | CY |
$10.20 |
$10.00 |
$8.00 |
$7.15 |
$10.05 |
$8.00 |
$8.73 |
$8.67 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$11,597.60 |
$7,500.00 |
$8,000.00 |
$18,565.00 |
$11,150.00 |
$17,500.00 |
$10,895.67 |
$8,800.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,930 | LF |
$2.40 |
$1.95 |
$2.15 |
$2.00 |
$2.20 |
$2.15 |
$1.97 |
$4.35 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 56 | LF |
$11.10 |
$7.99 |
$30.00 |
$8.15 |
$9.00 |
$8.80 |
$8.06 |
$26.95 |
| 6 | 221(K) 0600 |
TEMPORARY FIBER LOG | 70 | LF |
$6.70 |
$6.75 |
$12.00 |
$6.90 |
$7.70 |
$7.40 |
$6.81 |
$20.85 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 9,565 | SY |
$2.70 |
$2.30 |
$2.50 |
$2.35 |
$2.85 |
$2.65 |
$2.32 |
$2.75 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.98 | AC |
$1,086.40 |
$650.00 |
$750.00 |
$662.00 |
$675.00 |
$700.00 |
$655.76 |
$3,245.00 |
| 9 | 241 2832 |
MOWING | 3.96 | AC |
$137.30 |
$225.00 |
$300.00 |
$229.00 |
$235.00 |
$245.00 |
$226.99 |
$544.50 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,057 | CY |
$66.50 |
$65.00 |
$78.75 |
$76.40 |
$95.00 |
$119.00 |
$121.02 |
$119.65 |
| 11 | 307(K) 4300 |
STABILIZED SUBGRADE | 5,805 | SY |
$6.30 |
$4.50 |
$6.30 |
$5.85 |
$6.60 |
$7.00 |
$7.64 |
$6.60 |
| 12 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 5,209 | SY |
$2.80 |
$4.00 |
$3.35 |
$2.30 |
$5.50 |
$6.00 |
$6.37 |
$6.16 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 929 | TON |
$36.30 |
$30.00 |
$42.00 |
$40.70 |
$39.20 |
$55.00 |
$40.38 |
$55.26 |
| 14 | 407(B) 0250 |
TACK COAT | 762 | GAL |
$4.10 |
$2.50 |
$5.25 |
$3.55 |
$5.50 |
$2.75 |
$6.37 |
$2.75 |
| 15 | 408 5774 |
PRIME COAT | 3,597 | GAL |
$4.80 |
$6.50 |
$6.30 |
$4.00 |
$6.60 |
$7.00 |
$7.64 |
$7.15 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,596 | TON |
$100.10 |
$78.25 |
$109.20 |
$82.20 |
$104.50 |
$88.00 |
$121.02 |
$86.08 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 560 | TON |
$128.30 |
$99.25 |
$120.75 |
$127.00 |
$126.50 |
$115.00 |
$146.49 |
$109.18 |
| 18 | 509(D) 0325 |
CLASS C CONCRETE | 5 | CY |
$355.00 |
$750.00 |
$300.00 |
$846.00 |
$400.00 |
$500.00 |
$386.63 |
$715.18 |
| 19 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 70 | LF |
$53.30 |
$50.00 |
$46.00 |
$46.90 |
$78.00 |
$35.00 |
$54.67 |
$73.28 |
| 20 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$776.30 |
$600.00 |
$1,100.00 |
$1,120.00 |
$1,150.00 |
$600.00 |
$963.31 |
$1,043.26 |
| 21 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$6,382.00 |
$3,000.00 |
$2,500.00 |
$2,546.00 |
$8,000.00 |
$3,000.00 |
$6,114.52 |
$5,500.00 |
| 22 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 4,370 | SY |
$6.50 |
$3.50 |
$6.30 |
$7.65 |
$7.85 |
$9.00 |
$8.28 |
$8.80 |
| 23 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 560 | LF |
$4.20 |
$3.00 |
$4.00 |
$4.00 |
$3.30 |
$3.50 |
$3.03 |
$3.30 |
| 24 | 619(C) 0924 |
SAWING PAVEMENT | 204 | LF |
$6.40 |
$4.00 |
$8.00 |
$9.10 |
$11.00 |
$5.00 |
$4.54 |
$6.60 |
| 25 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 350 | LF |
$22.00 |
$20.00 |
$22.00 |
$18.80 |
$22.00 |
$22.00 |
$20.18 |
$22.00 |
| 26 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,724.70 |
$2,200.00 |
$2,500.00 |
$2,648.00 |
$2,420.00 |
$2,420.00 |
$2,219.49 |
$2,420.00 |
| 27 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,190.10 |
$1,800.00 |
$2,000.00 |
$1,732.00 |
$1,980.00 |
$1,980.00 |
$1,815.95 |
$2,035.00 |
| 28 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 469 | LF |
$5.40 |
$10.00 |
$14.00 |
$8.30 |
$11.00 |
$11.00 |
$10.09 |
$16.50 |
| 29 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 14 | EA |
$13.10 |
$20.00 |
$25.00 |
$15.30 |
$22.00 |
$22.00 |
$20.18 |
$22.00 |
| 30 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 175 | CY |
$23.00 |
$10.00 |
$10.00 |
$17.70 |
$12.00 |
$15.00 |
$22.93 |
$22.00 |
| 31 | 501(G) 6309 |
CLSM BACKFILL | 149.9 | CY |
$150.00 |
$175.00 |
$216.00 |
$181.00 |
$170.00 |
$150.00 |
$189.20 |
$180.25 |
| 32 | 504 6179 |
BRIDGE TRAFFIC RAIL | 671.1 | LF |
$120.00 |
$165.00 |
$130.00 |
$177.50 |
$155.00 |
$220.00 |
$368.33 |
$159.12 |
| 33 | 504(A) 1304 |
APPROACH SLAB | 204.6 | SY |
$200.00 |
$200.00 |
$270.00 |
$256.50 |
$245.00 |
$210.00 |
$192.05 |
$292.46 |
| 34 | 504(B) 1305 |
SAW-CUT GROOVING | 820.3 | SY |
$6.00 |
$4.80 |
$5.10 |
$4.90 |
$5.28 |
$5.30 |
$6.62 |
$5.28 |
| 35 | 504(C) 6250 |
SEALED EXPANSION JOINT | 58.22 | LF |
$275.00 |
$275.00 |
$253.00 |
$314.50 |
$325.00 |
$280.00 |
$293.57 |
$285.30 |
| 36 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 288,860 | LB |
$2.30 |
$1.79 |
$1.70 |
$1.59 |
$1.76 |
$1.85 |
$1.51 |
$2.01 |
| 37 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$2,500.00 |
$2,000.00 |
$1,675.00 |
$1,969.00 |
$1,860.00 |
$2,000.00 |
$2,370.38 |
$1,965.54 |
| 38 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$2,200.00 |
$2,000.00 |
$1,675.00 |
$1,969.00 |
$1,860.00 |
$2,000.00 |
$2,370.38 |
$1,965.54 |
| 39 | 509(A) 1326 |
CLASS AA CONCRETE | 170.9 | CY |
$650.00 |
$800.00 |
$675.00 |
$699.00 |
$675.00 |
$600.00 |
$774.56 |
$726.90 |
| 40 | 509(B) 1328 |
CLASS A CONCRETE | 218.3 | CY |
$610.00 |
$800.00 |
$675.00 |
$582.50 |
$697.50 |
$600.00 |
$630.32 |
$721.04 |
| 41 | 509(D) 1331 |
CLASS C CONCRETE | 20 | CY |
$550.00 |
$600.00 |
$375.00 |
$520.50 |
$650.00 |
$500.00 |
$403.47 |
$622.75 |
| 42 | 511 6306 |
MECHANICAL SPLICES | 64 | EA |
$35.00 |
$35.00 |
$38.94 |
$64.60 |
$55.00 |
$45.00 |
$35.06 |
$52.69 |
| 43 | 511(A) 1332 |
REINFORCING STEEL | 630 | LB |
$1.20 |
$1.00 |
$2.00 |
$3.75 |
$1.55 |
$1.00 |
$1.06 |
$1.34 |
| 44 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 99,910 | LB |
$1.30 |
$1.20 |
$1.14 |
$1.15 |
$1.20 |
$1.25 |
$0.8000 |
$1.24 |
| 45 | 512 6280 |
CLEANING AND PAINTING BRIDGE METAL RAIL | 200 | LF |
$15.00 |
$14.60 |
$16.00 |
$14.90 |
$16.25 |
$75.00 |
$18.60 |
$55.00 |
| 46 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$75,000.00 |
$79,820.00 |
$84,900.00 |
$81,300.00 |
$88,000.00 |
$210,000.00 |
$101,679.37 |
$220,000.00 |
| 47 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$25,000.00 |
$18,681.00 |
$21,500.00 |
$20,000.00 |
$21,000.00 |
$16,500.00 |
$23,796.95 |
$51,024.33 |
| 48 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 211 | LF |
$34.00 |
$33.00 |
$22.45 |
$31.80 |
$30.10 |
$25.00 |
$35.59 |
$32.42 |
| 49 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 704 | LF |
$39.00 |
$40.00 |
$28.00 |
$34.20 |
$32.90 |
$30.00 |
$37.79 |
$38.48 |
| 50 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 211 | LF |
$14.00 |
$14.25 |
$15.00 |
$30.10 |
$12.90 |
$20.00 |
$20.38 |
$24.20 |
| 51 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 704 | LF |
$14.00 |
$17.25 |
$14.00 |
$19.40 |
$14.10 |
$20.00 |
$20.38 |
$22.00 |
| 52 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 53 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 871 | SY |
$4.20 |
$4.00 |
$4.40 |
$4.05 |
$4.40 |
$3.50 |
$4.54 |
$4.40 |
| 54 | 516(A) 6095 |
DRILLED SHAFTS 54" DIAMETER | 252 | LF |
$750.00 |
$700.00 |
$856.46 |
$948.50 |
$750.00 |
$800.00 |
$820.22 |
$950.56 |
| 55 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 6 | EA |
$2,600.00 |
$1,575.00 |
$1,735.00 |
$2,744.00 |
$2,500.00 |
$2,000.00 |
$2,006.33 |
$4,950.00 |
| 56 | 523(A) 6550 |
SEALER CRACK PREPARATION | 113 | LF |
$4.40 |
$6.00 |
$7.00 |
$6.10 |
$6.60 |
$6.00 |
$7.64 |
$6.60 |
| 57 | 523(B) 6560 |
SEALER RESIN | 1.3 | GAL |
$130.00 |
$150.00 |
$175.00 |
$153.00 |
$165.00 |
$150.00 |
$191.08 |
$165.00 |
| 58 | 542 4610 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE A) | 1 | LSUM |
$80,000.00 |
$3,500.00 |
$47,500.00 |
$55,000.00 |
$44,500.00 |
$75,000.00 |
$12,738.58 |
$110,000.00 |
| 59 | 542 4625 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE B) | 10 | EA |
$750.00 |
$1,000.00 |
$1,219.00 |
$1,196.00 |
$1,415.00 |
$900.00 |
$900.44 |
$2,093.19 |
| 60 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,950 | TON |
$42.00 |
$45.00 |
$48.80 |
$50.30 |
$53.75 |
$55.00 |
$45.45 |
$51.07 |
| 61 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 280 | TON |
$39.00 |
$35.00 |
$48.00 |
$40.60 |
$41.70 |
$45.00 |
$34.71 |
$40.32 |
| 62 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 64 | LF |
$32.00 |
$28.00 |
$45.00 |
$58.40 |
$28.00 |
$35.00 |
$11.16 |
$27.22 |
| 63 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$25.00 |
$28.00 |
$50.00 |
$28.30 |
$33.00 |
$35.00 |
$12.15 |
$36.87 |
| 64 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$85,000.00 |
$40,000.00 |
$81,000.00 |
$88,500.00 |
$57,500.00 |
$75,000.00 |
$57,323.62 |
$104,500.00 |
| 65 | 623 0100 |
(PL)GUARDRAIL CURBING | 2 | EA |
$900.00 |
$750.00 |
$3,000.00 |
$834.50 |
$1,500.00 |
$1,000.00 |
$20.46 |
$1,508.61 |
| 66 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 10 | DAY |
$600.00 |
$600.00 |
$600.00 |
$600.00 |
$600.00 |
$600.00 |
$600.00 |
$600.00 |
| 67 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,800 | SD |
$0.5000 |
$0.2500 |
$0.3000 |
$0.5100 |
$0.2800 |
$0.2700 |
$0.2500 |
$0.2800 |
| 68 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,060 | SD |
$0.3000 |
$0.2500 |
$0.3000 |
$0.5100 |
$0.2800 |
$0.2700 |
$0.2500 |
$0.2800 |
| 69 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 360 | SD |
$1.00 |
$0.2500 |
$0.3000 |
$2.55 |
$0.2800 |
$0.2700 |
$0.2500 |
$0.2800 |
| 70 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,620 | SD |
$0.5000 |
$0.2500 |
$0.3000 |
$1.00 |
$0.2800 |
$0.2700 |
$0.2500 |
$0.2800 |
| 71 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,240 | SD |
$0.2000 |
$3.00 |
$3.30 |
$0.3600 |
$6.00 |
$3.05 |
$3.03 |
$3.30 |
| 72 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 582 | SD |
$11.50 |
$5.00 |
$6.00 |
$12.20 |
$5.50 |
$5.05 |
$5.04 |
$5.50 |
| 73 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 12 | EA |
$58.10 |
$50.00 |
$100.00 |
$25.50 |
$55.00 |
$55.00 |
$50.44 |
$55.00 |
| 74 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 65 | SF |
$21.10 |
$15.00 |
$16.00 |
$15.30 |
$16.50 |
$15.25 |
$15.13 |
$16.50 |
| 75 | 851(C) 8324 |
2" SQUARE TUBE POST | 172 | LF |
$8.50 |
$8.00 |
$9.00 |
$3.55 |
$8.80 |
$8.40 |
$8.07 |
$8.80 |
| 76 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 7,796 | LF |
$0.9000 |
$0.5000 |
$0.6000 |
$0.8700 |
$0.5500 |
$0.5200 |
$0.5000 |
$0.5500 |
| 77 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$11,000.00 |
$16,000.00 |
$14,200.00 |
$22,500.00 |
$12,500.00 |
$9,500.00 |
$13,375.51 |
$9,460.00 |
| 78 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,500.00 |
$3,000.00 |
$3,300.00 |
$5,000.00 |
$4,500.00 |
$4,000.00 |
$1,910.79 |
$3,300.00 |
| 79 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$7,500.00 |
$9,000.00 |
$2,546.00 |
$10,000.00 |
$7,500.00 |
$764.31 |
$10,560.00 |
| 80 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$142,500.00 |
$97,000.00 |
$154,922.57 |
$129,252.00 |
$100,000.00 |
$259,357.55 |
$176,110.92 |