| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$72,000.00 |
$40,000.00 |
$60,000.00 |
$125,000.00 |
$75,000.00 |
$67,000.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 65,679 | CY |
$8.10 |
$5.55 |
$6.75 |
$10.00 |
$6.00 |
$7.38 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 36,265 | CY |
$9.65 |
$6.85 |
$8.25 |
$12.50 |
$8.50 |
$8.75 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$45,000.00 |
$80,000.00 |
$87,100.00 |
$125,000.00 |
$125,000.00 |
$95,000.00 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 8,072 | LF |
$4.00 |
$1.83 |
$1.70 |
$2.00 |
$3.00 |
$3.00 |
| 60 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 13 | EA |
$250.00 |
$258.75 |
$238.00 |
$250.00 |
$295.00 |
$500.00 |
| 70 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,090 | LF |
$9.75 |
$7.92 |
$7.30 |
$7.50 |
$19.25 |
$9.00 |
| 80 | 230(A) 2806 |
SOLID SLAB SODDING | 103,030 | SY |
$2.15 |
$2.24 |
$2.05 |
$2.20 |
$3.00 |
$3.25 |
| 90 | 233(A) 2817 |
VEGETATIVE MULCHING | 22 | AC |
$250.00 |
$690.00 |
$634.00 |
$660.00 |
$2,000.00 |
$1,800.00 |
| 100 | 241 2832 |
MOWING | 44 | AC |
$125.00 |
$155.25 |
$143.00 |
$150.00 |
$300.00 |
$800.00 |
| 110 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 17,669 | CY |
$45.00 |
$44.82 |
$51.50 |
$42.50 |
$55.00 |
$60.24 |
| 120 | 307(K) 4300 |
STABILIZED SUBGRADE | 50,013 | SY |
$6.00 |
$6.15 |
$6.80 |
$5.25 |
$6.00 |
$8.00 |
| 130 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 50,013 | SY |
$4.65 |
$5.90 |
$6.50 |
$3.99 |
$6.00 |
$7.59 |
| 140 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 7,217 | TON |
$24.50 |
$25.45 |
$28.00 |
$25.66 |
$40.00 |
$30.00 |
| 150 | 407(B) 0250 |
TACK COAT | 12,908 | GAL |
$2.50 |
$2.29 |
$2.60 |
$2.50 |
$2.50 |
$2.59 |
| 160 | 408 5774 |
PRIME COAT | 38,712 | GAL |
$2.50 |
$2.42 |
$0.7000 |
$2.50 |
$2.75 |
$2.74 |
| 170 | 409(A) 4242 |
FABRIC REINFORCEMENT | 8,563 | SY |
$2.25 |
$1.80 |
$2.65 |
$1.99 |
$2.00 |
$2.50 |
| 180 | 409(B) 4268 |
BITUMINOUS BINDER | 1,713 | GAL |
$4.00 |
$4.07 |
$5.60 |
$5.00 |
$5.00 |
$4.56 |
| 190 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 1,511 | TON |
$78.00 |
$86.35 |
$98.75 |
$85.00 |
$86.00 |
$97.00 |
| 200 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 10,941 | TON |
$72.00 |
$83.77 |
$78.30 |
$82.50 |
$85.00 |
$93.92 |
| 210 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 8,471 | TON |
$84.00 |
$91.23 |
$97.50 |
$90.00 |
$90.00 |
$102.29 |
| 220 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,710 | TON |
$80.00 |
$90.12 |
$86.25 |
$87.50 |
$90.00 |
$101.00 |
| 230 | 412 5267 |
COLD MILLING PAVEMENT | 26,293 | SY |
$2.50 |
$3.87 |
$2.40 |
$4.00 |
$1.00 |
$4.34 |
| 240 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 216 | CY |
$26.00 |
$20.00 |
$21.15 |
$25.00 |
$23.00 |
$25.45 |
| 250 | 501(G) 6315 |
CLSM BACKFILL | 20 | CY |
$195.00 |
$195.00 |
$185.00 |
$175.00 |
$200.00 |
$195.00 |
| 260 | 509(A) 0319 |
CLASS AA CONCRETE | 573 | CY |
$425.00 |
$419.75 |
$464.50 |
$425.00 |
$550.00 |
$593.77 |
| 270 | 509(D) 0325 |
CLASS C CONCRETE | 585 | CY |
$275.00 |
$345.00 |
$280.00 |
$350.00 |
$500.00 |
$396.00 |
| 280 | 511(A) 0332 |
REINFORCING STEEL | 10,780.4 | LB |
$1.05 |
$1.15 |
$1.05 |
$1.22 |
$1.15 |
$1.28 |
| 290 | 511(B) 4269 |
EPOXY COATED REINFORCING STEEL | 128,700 | LB |
$1.20 |
$1.38 |
$1.10 |
$1.40 |
$1.25 |
$1.50 |
| 300 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 182 | TON |
$47.00 |
$45.00 |
$66.75 |
$39.00 |
$60.00 |
$55.00 |
| 310 | 609(B) 1523 |
2'-8" COMB. CURB & GUTTER (4" MNTBLE) | 1,787 | LF |
$6.00 |
$28.75 |
$27.50 |
$22.50 |
$19.50 |
$30.00 |
| 320 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 1 | EA |
$2,400.00 |
$1,986.16 |
$2,100.00 |
$4,500.00 |
$3,000.00 |
$4,500.00 |
| 330 | 611(G) 5113 |
INLET CI DES. 2 (B) | 1 | EA |
$4,650.00 |
$8,346.80 |
$8,800.00 |
$2,500.00 |
$4,500.00 |
$2,750.00 |
| 340 | 611(G) 5118 |
INLET CI DES. 2 (B-D) | 1 | EA |
$5,010.00 |
$11,319.98 |
$12,000.00 |
$3,500.00 |
$4,000.00 |
$2,750.00 |
| 350 | 611(G) 5970 |
INLET W/SMALL JCT. BOX, CI, DES.2 | 3 | EA |
$6,800.00 |
$4,613.29 |
$4,900.00 |
$2,500.00 |
$6,025.00 |
$3,000.00 |
| 360 | 611(G) 5972 |
INLET W/SMALL JCT. BOX, CI, DES.2(B) | 3 | EA |
$7,600.00 |
$6,907.14 |
$7,300.00 |
$3,500.00 |
$7,650.00 |
$3,000.00 |
| 370 | 611(G) 5974 |
INLET W/SMALL JCT. BOX, CI, DES.2(D) | 1 | EA |
$8,800.00 |
$10,183.55 |
$10,800.00 |
$3,500.00 |
$8,000.00 |
$3,000.00 |
| 380 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 5 | EA |
$2,700.00 |
$2,911.81 |
$3,075.00 |
$2,500.00 |
$3,125.00 |
$3,000.00 |
| 390 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 4 | VF |
$420.00 |
$850.45 |
$900.00 |
$750.00 |
$500.00 |
$1,000.00 |
| 400 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 618 | LF |
$62.00 |
$37.70 |
$40.00 |
$65.00 |
$55.00 |
$45.00 |
| 410 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 1,127 | LF |
$70.00 |
$53.30 |
$56.30 |
$85.00 |
$75.00 |
$53.30 |
| 420 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 140 | LF |
$115.00 |
$102.58 |
$108.00 |
$125.00 |
$125.00 |
$110.00 |
| 430 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 942 | LF |
$33.00 |
$36.21 |
$38.20 |
$35.00 |
$40.00 |
$40.00 |
| 440 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 512 | LF |
$10.00 |
$47.52 |
$50.00 |
$40.00 |
$55.00 |
$49.00 |
| 450 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 80 | LF |
$45.00 |
$59.32 |
$63.00 |
$45.00 |
$85.00 |
$60.00 |
| 460 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 1,792 | LF |
$11.75 |
$26.00 |
$27.50 |
$20.00 |
$10.00 |
$30.00 |
| 470 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 90 | LF |
$13.92 |
$24.00 |
$25.50 |
$20.00 |
$10.00 |
$30.00 |
| 480 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 8 | EA |
$575.00 |
$1,167.04 |
$1,230.00 |
$750.00 |
$925.00 |
$1,439.00 |
| 490 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,175.00 |
$1,359.26 |
$1,430.00 |
$1,000.00 |
$1,100.00 |
$1,676.00 |
| 500 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,600.00 |
$2,718.52 |
$3,000.00 |
$1,250.00 |
$1,600.00 |
$3,352.00 |
| 510 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 30 | EA |
$1,090.00 |
$1,380.00 |
$1,750.00 |
$1,250.00 |
$1,200.00 |
$1,800.00 |
| 520 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 13 | EA |
$1,380.00 |
$1,495.00 |
$2,050.00 |
$1,500.00 |
$1,300.00 |
$2,500.00 |
| 530 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$500.00 |
$575.00 |
$700.00 |
$500.00 |
$600.00 |
$800.00 |
| 540 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$35,000.00 |
$40,000.00 |
$42,000.00 |
$50,000.00 |
$25,000.00 |
$55,000.00 |
| 550 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 26,358 | SY |
$3.80 |
$2.00 |
$2.65 |
$3.00 |
$3.00 |
$3.00 |
| 560 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,754 | LF |
$3.75 |
$3.00 |
$5.00 |
$5.00 |
$3.00 |
$5.00 |
| 570 | 619(B) 8610 |
REMOVE AND RESET CATTLE GUARD | 1 | EA |
$1,575.00 |
$500.00 |
$2,000.00 |
$1,250.00 |
$1,500.00 |
$500.00 |
| 580 | 624(A) 4281 |
FENCE-STYLE WWF | 1,310 | LF |
$6.00 |
$8.76 |
$12.60 |
$8.00 |
$7.50 |
$12.00 |
| 590 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 2,889 | LF |
$4.75 |
$6.36 |
$10.35 |
$6.00 |
$6.00 |
$7.00 |
| 600 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 9,553 | LF |
$5.25 |
$6.72 |
$11.15 |
$6.25 |
$6.00 |
$7.00 |
| 610 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 2,088 | LF |
$6.00 |
$7.08 |
$12.20 |
$6.75 |
$7.00 |
$8.00 |
| 620 | 624(E) 4288 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 247 | LF |
$8.00 |
$57.60 |
$19.00 |
$65.00 |
$50.00 |
$50.00 |
| 630 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 9 | EA |
$165.00 |
$250.00 |
$590.00 |
$150.00 |
$100.00 |
$150.00 |
| 640 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$40,000.00 |
$16,000.00 |
$42,500.00 |
$5,000.00 |
$35,000.00 |
| 650 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,450 | CY |
$10.00 |
$20.00 |
$6.30 |
$10.00 |
$15.00 |
$10.00 |
| 660 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 540 | CY |
$26.00 |
$20.00 |
$21.00 |
$25.00 |
$25.00 |
$22.00 |
| 670 | 509(A) 1326 |
CLASS AA CONCRETE | 1,282.3 | CY |
$650.00 |
$419.75 |
$438.50 |
$425.00 |
$550.00 |
$660.00 |
| 680 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 239,360 | LB |
$1.30 |
$1.38 |
$1.10 |
$1.25 |
$1.50 |
$1.38 |
| 690 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$45,000.00 |
$40,000.00 |
$16,000.00 |
$47,500.00 |
$5,000.00 |
$45,000.00 |
| 700 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 52,000 | LF |
$0.1500 |
$0.1000 |
$0.0800 |
$0.1200 |
$0.2000 |
$0.1000 |
| 710 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 24,000 | LF |
$0.7500 |
$0.1000 |
$0.0500 |
$0.1200 |
$0.5000 |
$0.1000 |
| 720 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 750 | SD |
$8.50 |
$6.00 |
$10.60 |
$5.50 |
$6.00 |
$6.17 |
| 730 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,000 | LF |
$20.00 |
$38.00 |
$35.75 |
$25.00 |
$20.00 |
$49.00 |
| 740 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,000 | LF |
$5.50 |
$5.00 |
$9.50 |
$10.00 |
$3.00 |
$9.00 |
| 750 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,880 | SD |
$0.3200 |
$1.20 |
$0.7000 |
$1.10 |
$2.00 |
$1.23 |
| 760 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,080 | SD |
$0.5000 |
$2.40 |
$2.65 |
$2.20 |
$4.80 |
$2.47 |
| 770 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,080 | SD |
$1.00 |
$0.3000 |
$2.65 |
$0.3000 |
$4.90 |
$0.3100 |
| 780 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,320 | SD |
$0.7500 |
$0.3000 |
$0.3700 |
$0.3000 |
$0.5000 |
$0.3100 |
| 790 | 880(C) 8848 |
WING BARRICADES | 360 | SD |
$0.7500 |
$1.20 |
$3.15 |
$1.25 |
$0.0200 |
$1.23 |
| 800 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,880 | SD |
$0.3000 |
$3.60 |
$1.05 |
$3.33 |
$0.4500 |
$3.70 |
| 810 | 880(F) 8878 |
DRUMS | 28,280 | SD |
$0.1500 |
$0.1800 |
$0.2500 |
$0.2000 |
$0.0500 |
$0.1900 |
| 820 | 880(M) 8325 |
(PL)SPEED MONITORING DEVICE | 1,440 | SD |
$20.00 |
$9.00 |
$5.30 |
$10.00 |
$8.00 |
$9.25 |
| 830 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 720 | SD |
$13.20 |
$18.00 |
$15.85 |
$20.00 |
$8.00 |
$18.50 |
| 840 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 24,899 | LF |
$0.2500 |
$0.1400 |
$0.1500 |
$0.1600 |
$0.3500 |
$0.1700 |
| 850 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 21 | EA |
$90.00 |
$30.00 |
$52.80 |
$30.00 |
$95.00 |
$30.83 |
| 860 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$235.00 |
$240.00 |
$264.00 |
$250.00 |
$350.00 |
$246.00 |
| 870 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 218 | SF |
$24.00 |
$30.00 |
$15.80 |
$30.00 |
$30.00 |
$30.83 |
| 880 | 851(C) 8324 |
2" SQUARE TUBE POST | 401 | LF |
$9.50 |
$18.00 |
$5.30 |
$20.00 |
$6.00 |
$18.50 |
| 890 | 853 9051 |
DELINEATORS(TYPE 2, CODE 1, FLEXIBLE) | 32 | EA |
$20.00 |
$48.00 |
$37.00 |
$42.50 |
$48.00 |
$49.33 |
| 900 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 52,180 | LF |
$0.4000 |
$0.4600 |
$0.3200 |
$0.4200 |
$0.5000 |
$0.4700 |
| 910 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,753 | LF |
$1.25 |
$2.40 |
$0.6300 |
$2.25 |
$2.00 |
$2.47 |
| 920 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 24 | LF |
$5.00 |
$12.00 |
$1.90 |
$12.50 |
$4.00 |
$12.33 |
| 930 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 6 | EA |
$140.00 |
$150.00 |
$211.00 |
$150.00 |
$250.00 |
$154.17 |
| 940 | 858(A) 8896 |
PAVEMENT MARKERS CLASS A TYPE 1-A | 97 | EA |
$4.25 |
$6.00 |
$5.28 |
$6.00 |
$8.00 |
$6.17 |
| 950 | 858(A) 8914 |
PAVEMENT MARKERS CLASS A TYPE 2-D | 217 | EA |
$6.75 |
$6.00 |
$5.28 |
$6.00 |
$8.00 |
$6.17 |
| 960 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$60,000.00 |
$80,000.00 |
$33,000.00 |
$75,000.00 |
$20,000.00 |
$65,000.00 |
| 970 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$9,500.00 |
$2,500.00 |
$1,500.00 |
$2,500.00 |
$5,000.00 |
$3,500.00 |
| 980 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$389,500.00 |
$318,000.00 |
$395,000.00 |
$175,000.00 |
$250,000.00 |
$320,000.00 |