Bid tab 200203

Let May 14, 2020 · Division 1 · Muskogee Sign up free

‹ May 2020 results

BRIDGE AND APPROACHES COUNTY ROAD (EW-091/SMITH FERRY ROAD ): OVER SAM CR AND SAM CR TRIBUTARY , 2.1 MI AND 2.7 MI E OF US-64 NEAR MUSKOGEE. PROJECT LENGTH = 0.292 MILE

Let date
Thursday, May 14, 2020
Contract
200203
J/P numbers
33052(04)
District
Division 1
County
Muskogee
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (EW-091/SMITH FERRY ROAD ): OVER SAM CR AND SAM CR TRIBUTARY , 2.1 MI AND 2.7 MI E OF US-64 NEAR MUSKOGEE. PROJECT LENGTH = 0.292 MILE
Project number
STP-251D(109)CI

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,491,786
1 Treas Construction Inc Low bidder $1,350,831 -9.4%
2 Robinson Construction, LLC $1,419,224 -4.9% +5.1%
3 Wyatt Contracting $1,505,498 +0.9% +11.4%
4 Grade Line Construction, LLC $1,522,557 +2.1% +12.7%
5 Tri Star Construction Arkansas, LLC $1,598,000 +7.1% +18.3%
6 BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION $1,642,829 +10.1% +21.6%
7 DOWNEY CONTRACTING, LLC $2,159,651 +44.8% +59.9%

Bid tab: unit prices 48 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Treas Construct…#2 Robinson Constr…#3 Wyatt Contracti…#4 Grade Line Cons…#5 Tri Star Constr…#6 BRIGHT LIGHTING…#7 DOWNEY CONTRACT…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $50,000.00 $16,852.00 $28,000.00 $58,238.25 $60,000.00 $15,000.00 $15,000.00 $32,500.00
2202(A) 0183 UNCLASSIFIED EXCAVATION6,970CY $12.00 $7.86 $9.50 $7.35 $8.00 $18.00 $18.00 $22.00
3202(D) 0184 UNCLASSIFIED BORROW5,678CY $13.30 $11.24 $10.50 $10.50 $13.00 $27.00 $32.00 $24.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $10,000.00 $8,426.25 $35,000.00 $13,650.00 $60,000.00 $35,000.00 $5,000.00 $14,500.00
5221(C) 2801 TEMPORARY SILT FENCE2,100LF $3.30 $2.25 $4.03 $4.19 $4.00 $1.70 $2.50 $4.00
6221(F) 0100 TEMPORARY SILT DIKE252LF $14.10 $16.85 $13.80 $28.39 $20.00 $11.00 $15.00 $13.00
7230(A) 2806 SOLID SLAB SODDING12,265SY $4.00 $5.30 $3.55 $5.44 $5.00 $6.20 $6.00 $5.00
8233(A) 2817 VEGETATIVE MULCHING4.84AC $3,270.90 $4,226.50 $1,100.00 $3,627.75 $1,250.00 $5,500.00 $4,400.00 $4,900.00
9303(A) 2100 AGGREGATE BASE TYPE A2,072CY $49.70 $44.94 $53.60 $42.00 $55.00 $56.00 $45.00 $75.00
10325 5271 SEPARATOR FABRIC6,860SY $1.60 $1.97 $2.61 $1.84 $1.50 $1.25 $3.00 $4.00
11402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E421TON $28.70 $33.70 $28.80 $31.50 $36.00 $32.00 $30.00 $40.00
12407(B) 0250 TACK COAT423GAL $3.50 $2.67 $3.30 $3.15 $2.50 $2.85 $4.00 $4.20
13408 5774 PRIME COAT4,278GAL $3.90 $5.19 $4.15 $3.94 $4.50 $6.15 $6.00 $5.25
14411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)1,280TON $95.00 $95.87 $135.50 $127.58 $90.00 $103.50 $90.00 $160.00
15411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)690TON $115.00 $100.31 $186.50 $176.40 $95.00 $113.00 $95.00 $215.00
16412 5267 COLD MILLING PAVEMENT3,560SY $4.00 $4.28 $2.35 $7.35 $6.00 $3.10 $5.75 $20.00
17509(D) 0325 CLASS C CONCRETE10CY $377.00 $561.75 $385.00 $300.00 $245.00 $350.00 $300.00 $500.00
18613(B) 0689 18" CORR. GALV. STEEL PIPE132LF $37.70 $42.69 $33.65 $39.90 $48.00 $63.00 $35.00 $75.00
19613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND6EA $643.10 $1,011.15 $330.00 $945.00 $370.00 $1,200.00 $500.00 $425.00
20619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $20,000.00 $5,617.50 $20,000.00 $26,250.00 $39,000.00 $18,415.05 $5,000.00 $28,400.00
21623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE225LF $23.30 $19.26 $20.70 $18.90 $18.00 $20.00 $20.00 $25.00
22623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $1,712.60 $1,391.00 $1,495.00 $1,365.00 $1,300.00 $1,600.00 $1,500.00 $1,780.00
23623(G) 8571 GUARDRAIL END TREATMENT (GET)3EA $2,779.90 $2,568.00 $2,760.00 $2,520.00 $2,400.00 $3,000.00 $2,650.00 $3,285.00
24624(A) 4281 FENCE-STYLE WWF64LF $7.90 $8.98 $8.05 $8.82 $9.00 $32.00 $10.00 $10.00
25624(C) 4458 FENCE-STYLE SWF (4 BARBED WIRE)374LF $7.10 $6.09 $6.61 $5.99 $6.00 $7.00 $6.27 $7.00
26624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)1,778LF $7.00 $6.09 $6.90 $5.99 $6.00 $5.00 $6.30 $8.50
27624(C) 7181 FENCE-STYLE SWF (6 BARBED WIRE)365LF $7.50 $6.53 $7.48 $6.41 $6.50 $8.00 $7.00 $9.00
28629(A) 4958 MAILBOX INSTALLATION-SINGLE2EA $162.30 $107.00 $115.00 $105.00 $100.00 $120.00 $150.00 $150.00
29629(C) 4960 MAILBOX2EA $41.50 $53.50 $60.00 $52.50 $50.00 $60.00 $50.00 $75.00
30202(A) 1301 UNCLASSIFIED EXCAVATION1,300CY $8.80 $7.86 $20.00 $7.35 $12.00 $18.00 $18.00 $38.00
31501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED266CY $20.00 $32.10 $23.00 $30.00 $15.00 $33.00 $20.00 $65.00
32504(D) 6239 CONCRETE RAIL (TR3)101.62LF $105.90 $93.22 $165.00 $145.00 $200.00 $130.00 $95.00 $68.00
33509(A) 1326 CLASS AA CONCRETE328.6CY $650.00 $588.71 $385.00 $600.00 $650.00 $500.00 $800.00 $975.00
34511(A) 1332 REINFORCING STEEL75,733LB $1.15 $1.14 $1.00 $1.00 $1.15 $1.10 $1.10 $1.15
35601(A) 1351 TYPE I PLAIN RIPRAP115TON $50.00 $51.62 $60.00 $42.00 $50.00 $80.00 $40.00 $80.00
36619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $15,000.00 $13,602.38 $22,000.00 $26,250.00 $20,000.00 $20,000.00 $20,000.00 $16,250.00
37202(A) 1301 UNCLASSIFIED EXCAVATION510CY $8.80 $10.70 $20.00 $7.35 $15.00 $25.00 $18.00 $38.00
38501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED173CY $20.00 $37.45 $23.00 $30.00 $15.00 $33.00 $20.00 $65.00
39509(A) 1326 CLASS AA CONCRETE268.1CY $650.00 $674.31 $385.00 $600.00 $650.00 $500.00 $800.00 $975.00
40511(A) 1332 REINFORCING STEEL45,078LB $1.15 $1.13 $1.00 $1.00 $1.15 $1.10 $1.10 $1.15
41601(A) 1351 TYPE I PLAIN RIPRAP75TON $50.00 $51.62 $65.00 $42.00 $50.00 $80.00 $40.00 $80.00
42619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $10,000.00 $13,602.38 $15,000.00 $26,250.00 $20,000.00 $15,000.00 $20,000.00 $16,250.00
43853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)4EA $18.90 $21.40 $23.00 $21.00 $20.00 $23.00 $25.00 $30.00
44854(A) 8800 TRAFFIC STRIPE(PAINT)(4" WIDE)10,800LF $0.3000 $0.2100 $0.2300 $0.2100 $0.2500 $0.2500 $0.5000 $0.3000
45880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $25,000.00 $3,370.50 $10,000.00 $3,307.50 $6,500.00 $4,000.00 $3,150.00 $4,500.00
46642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $25,000.00 $10,700.00 $15,000.00 $10,500.00 $13,000.00 $26,000.00 $12,000.00 $9,500.00
47220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $10,000.00 $1,605.00 $6,575.00 $10,000.00 $2,000.00 $16,000.00 $6,000.00 $2,500.00
48641 1552 MOBILIZATION1LSUM $106,000.00 $97,564.90 $134,800.00 $100,000.00 $97,000.00 $104,900.00 $70,000.00 $95,000.00