| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$16,852.00 |
$28,000.00 |
$58,238.25 |
$60,000.00 |
$15,000.00 |
$15,000.00 |
$32,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 6,970 | CY |
$12.00 |
$7.86 |
$9.50 |
$7.35 |
$8.00 |
$18.00 |
$18.00 |
$22.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 5,678 | CY |
$13.30 |
$11.24 |
$10.50 |
$10.50 |
$13.00 |
$27.00 |
$32.00 |
$24.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$8,426.25 |
$35,000.00 |
$13,650.00 |
$60,000.00 |
$35,000.00 |
$5,000.00 |
$14,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,100 | LF |
$3.30 |
$2.25 |
$4.03 |
$4.19 |
$4.00 |
$1.70 |
$2.50 |
$4.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 252 | LF |
$14.10 |
$16.85 |
$13.80 |
$28.39 |
$20.00 |
$11.00 |
$15.00 |
$13.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 12,265 | SY |
$4.00 |
$5.30 |
$3.55 |
$5.44 |
$5.00 |
$6.20 |
$6.00 |
$5.00 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.84 | AC |
$3,270.90 |
$4,226.50 |
$1,100.00 |
$3,627.75 |
$1,250.00 |
$5,500.00 |
$4,400.00 |
$4,900.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,072 | CY |
$49.70 |
$44.94 |
$53.60 |
$42.00 |
$55.00 |
$56.00 |
$45.00 |
$75.00 |
| 10 | 325 5271 |
SEPARATOR FABRIC | 6,860 | SY |
$1.60 |
$1.97 |
$2.61 |
$1.84 |
$1.50 |
$1.25 |
$3.00 |
$4.00 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 421 | TON |
$28.70 |
$33.70 |
$28.80 |
$31.50 |
$36.00 |
$32.00 |
$30.00 |
$40.00 |
| 12 | 407(B) 0250 |
TACK COAT | 423 | GAL |
$3.50 |
$2.67 |
$3.30 |
$3.15 |
$2.50 |
$2.85 |
$4.00 |
$4.20 |
| 13 | 408 5774 |
PRIME COAT | 4,278 | GAL |
$3.90 |
$5.19 |
$4.15 |
$3.94 |
$4.50 |
$6.15 |
$6.00 |
$5.25 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,280 | TON |
$95.00 |
$95.87 |
$135.50 |
$127.58 |
$90.00 |
$103.50 |
$90.00 |
$160.00 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 690 | TON |
$115.00 |
$100.31 |
$186.50 |
$176.40 |
$95.00 |
$113.00 |
$95.00 |
$215.00 |
| 16 | 412 5267 |
COLD MILLING PAVEMENT | 3,560 | SY |
$4.00 |
$4.28 |
$2.35 |
$7.35 |
$6.00 |
$3.10 |
$5.75 |
$20.00 |
| 17 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$377.00 |
$561.75 |
$385.00 |
$300.00 |
$245.00 |
$350.00 |
$300.00 |
$500.00 |
| 18 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 132 | LF |
$37.70 |
$42.69 |
$33.65 |
$39.90 |
$48.00 |
$63.00 |
$35.00 |
$75.00 |
| 19 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$643.10 |
$1,011.15 |
$330.00 |
$945.00 |
$370.00 |
$1,200.00 |
$500.00 |
$425.00 |
| 20 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$5,617.50 |
$20,000.00 |
$26,250.00 |
$39,000.00 |
$18,415.05 |
$5,000.00 |
$28,400.00 |
| 21 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 225 | LF |
$23.30 |
$19.26 |
$20.70 |
$18.90 |
$18.00 |
$20.00 |
$20.00 |
$25.00 |
| 22 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,712.60 |
$1,391.00 |
$1,495.00 |
$1,365.00 |
$1,300.00 |
$1,600.00 |
$1,500.00 |
$1,780.00 |
| 23 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 3 | EA |
$2,779.90 |
$2,568.00 |
$2,760.00 |
$2,520.00 |
$2,400.00 |
$3,000.00 |
$2,650.00 |
$3,285.00 |
| 24 | 624(A) 4281 |
FENCE-STYLE WWF | 64 | LF |
$7.90 |
$8.98 |
$8.05 |
$8.82 |
$9.00 |
$32.00 |
$10.00 |
$10.00 |
| 25 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 374 | LF |
$7.10 |
$6.09 |
$6.61 |
$5.99 |
$6.00 |
$7.00 |
$6.27 |
$7.00 |
| 26 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,778 | LF |
$7.00 |
$6.09 |
$6.90 |
$5.99 |
$6.00 |
$5.00 |
$6.30 |
$8.50 |
| 27 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 365 | LF |
$7.50 |
$6.53 |
$7.48 |
$6.41 |
$6.50 |
$8.00 |
$7.00 |
$9.00 |
| 28 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 2 | EA |
$162.30 |
$107.00 |
$115.00 |
$105.00 |
$100.00 |
$120.00 |
$150.00 |
$150.00 |
| 29 | 629(C) 4960 |
MAILBOX | 2 | EA |
$41.50 |
$53.50 |
$60.00 |
$52.50 |
$50.00 |
$60.00 |
$50.00 |
$75.00 |
| 30 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,300 | CY |
$8.80 |
$7.86 |
$20.00 |
$7.35 |
$12.00 |
$18.00 |
$18.00 |
$38.00 |
| 31 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 266 | CY |
$20.00 |
$32.10 |
$23.00 |
$30.00 |
$15.00 |
$33.00 |
$20.00 |
$65.00 |
| 32 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 101.62 | LF |
$105.90 |
$93.22 |
$165.00 |
$145.00 |
$200.00 |
$130.00 |
$95.00 |
$68.00 |
| 33 | 509(A) 1326 |
CLASS AA CONCRETE | 328.6 | CY |
$650.00 |
$588.71 |
$385.00 |
$600.00 |
$650.00 |
$500.00 |
$800.00 |
$975.00 |
| 34 | 511(A) 1332 |
REINFORCING STEEL | 75,733 | LB |
$1.15 |
$1.14 |
$1.00 |
$1.00 |
$1.15 |
$1.10 |
$1.10 |
$1.15 |
| 35 | 601(A) 1351 |
TYPE I PLAIN RIPRAP | 115 | TON |
$50.00 |
$51.62 |
$60.00 |
$42.00 |
$50.00 |
$80.00 |
$40.00 |
$80.00 |
| 36 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$13,602.38 |
$22,000.00 |
$26,250.00 |
$20,000.00 |
$20,000.00 |
$20,000.00 |
$16,250.00 |
| 37 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 510 | CY |
$8.80 |
$10.70 |
$20.00 |
$7.35 |
$15.00 |
$25.00 |
$18.00 |
$38.00 |
| 38 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 173 | CY |
$20.00 |
$37.45 |
$23.00 |
$30.00 |
$15.00 |
$33.00 |
$20.00 |
$65.00 |
| 39 | 509(A) 1326 |
CLASS AA CONCRETE | 268.1 | CY |
$650.00 |
$674.31 |
$385.00 |
$600.00 |
$650.00 |
$500.00 |
$800.00 |
$975.00 |
| 40 | 511(A) 1332 |
REINFORCING STEEL | 45,078 | LB |
$1.15 |
$1.13 |
$1.00 |
$1.00 |
$1.15 |
$1.10 |
$1.10 |
$1.15 |
| 41 | 601(A) 1351 |
TYPE I PLAIN RIPRAP | 75 | TON |
$50.00 |
$51.62 |
$65.00 |
$42.00 |
$50.00 |
$80.00 |
$40.00 |
$80.00 |
| 42 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$13,602.38 |
$15,000.00 |
$26,250.00 |
$20,000.00 |
$15,000.00 |
$20,000.00 |
$16,250.00 |
| 43 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 4 | EA |
$18.90 |
$21.40 |
$23.00 |
$21.00 |
$20.00 |
$23.00 |
$25.00 |
$30.00 |
| 44 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 10,800 | LF |
$0.3000 |
$0.2100 |
$0.2300 |
$0.2100 |
$0.2500 |
$0.2500 |
$0.5000 |
$0.3000 |
| 45 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$25,000.00 |
$3,370.50 |
$10,000.00 |
$3,307.50 |
$6,500.00 |
$4,000.00 |
$3,150.00 |
$4,500.00 |
| 46 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$10,700.00 |
$15,000.00 |
$10,500.00 |
$13,000.00 |
$26,000.00 |
$12,000.00 |
$9,500.00 |
| 47 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$1,605.00 |
$6,575.00 |
$10,000.00 |
$2,000.00 |
$16,000.00 |
$6,000.00 |
$2,500.00 |
| 48 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$106,000.00 |
$97,564.90 |
$134,800.00 |
$100,000.00 |
$97,000.00 |
$104,900.00 |
$70,000.00 |
$95,000.00 |