| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$40,600.00 |
$45,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,859 | CY |
$9.03 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,099 | CY |
$12.00 |
$12.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,108 | LF |
$1.69 |
$1.62 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 256 | LF |
$7.77 |
$7.44 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 11,089 | SY |
$1.43 |
$2.16 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.58 | AC |
$468.00 |
$594.00 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 528 | CY |
$50.00 |
$51.70 |
| 9 | 310(B) 0149 |
SUBGRADE, METHOD B | 2,311 | SY |
$1.43 |
$2.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 407 | TON |
$26.40 |
$25.85 |
| 11 | 408 5774 |
PRIME COAT | 681 | GAL |
$2.72 |
$6.48 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 466 | TON |
$98.00 |
$104.49 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 266 | TON |
$125.00 |
$138.78 |
| 14 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$269.00 |
$300.00 |
| 15 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 95 | TON |
$20.30 |
$34.05 |
| 16 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 48 | LF |
$35.90 |
$39.85 |
| 17 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$294.00 |
$360.00 |
| 18 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$18,900.00 |
$25,000.00 |
| 19 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,901 | SY |
$3.59 |
$6.00 |
| 20 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,456 | LF |
$4.61 |
$9.07 |
| 21 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,080 | CY |
$9.03 |
$5.00 |
| 22 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 143 | CY |
$21.80 |
$30.00 |
| 23 | 501(G) 6309 |
CLSM BACKFILL | 119.3 | CY |
$154.00 |
$165.00 |
| 24 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$35,000.00 |
$150,000.00 |
| 25 | 509(A) 1326 |
CLASS AA CONCRETE | 490.1 | CY |
$450.00 |
$540.00 |
| 26 | 511(A) 1332 |
REINFORCING STEEL | 58,120 | LB |
$0.9500 |
$0.9800 |
| 27 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 838 | TON |
$42.50 |
$43.00 |
| 28 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 267 | TON |
$36.10 |
$30.00 |
| 29 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,800.00 |
$8,000.00 |
| 30 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 2 | EA |
$1,610.00 |
$4,968.00 |
| 31 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 100 | SD |
$128.00 |
$56.97 |
| 32 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,200 | LF |
$0.1700 |
$0.6000 |
| 33 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 150 | SD |
$7.48 |
$21.60 |
| 34 | 871(C) 8707 |
RELOCATION OF CONSTRUCTION ZONE QUADGUARD IMPACT ATTENUATOR | 4 | EA |
$522.00 |
$810.00 |
| 35 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 500 | LF |
$21.00 |
$19.44 |
| 36 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 500 | LF |
$2.99 |
$3.89 |
| 37 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,510.00 |
$10,098.00 |
| 38 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$6,372.00 |
| 39 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,160.00 |
$3,500.00 |
| 40 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$65,000.00 |
$73,000.00 |