| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$36,400.00 |
$50,000.00 |
$40,000.00 |
$35,000.00 |
$35,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 60,609 | CY |
$5.25 |
$5.72 |
$5.00 |
$5.75 |
$5.50 |
$6.60 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 25,671 | CY |
$7.00 |
$6.76 |
$7.25 |
$6.75 |
$6.50 |
$7.60 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,000.00 |
$52,000.00 |
$48,165.00 |
$55,000.00 |
$50,000.00 |
$70,500.00 |
| 5 | 210 0121 |
OBLITERATING ABANDONED ROAD | 1,293 | LF |
$6.00 |
$5.20 |
$2.35 |
$5.00 |
$5.00 |
$10.40 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 26,975 | LF |
$1.00 |
$1.14 |
$1.10 |
$1.28 |
$1.28 |
$1.30 |
| 7 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 4 | EA |
$250.00 |
$183.04 |
$176.00 |
$245.00 |
$245.00 |
$248.00 |
| 8 | 221(F) 0100 |
TEMPORARY SILT DIKE | 3,752 | LF |
$7.00 |
$6.94 |
$6.67 |
$5.00 |
$4.87 |
$4.95 |
| 9 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 64 | CY |
$100.00 |
$104.00 |
$50.00 |
$150.00 |
$220.00 |
$101.50 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 132,839 | SY |
$1.00 |
$1.34 |
$1.29 |
$1.50 |
$1.34 |
$1.35 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 27.44 | AC |
$300.00 |
$284.96 |
$274.00 |
$225.00 |
$225.00 |
$228.00 |
| 12 | 241 2832 |
MOWING | 89 | AC |
$55.00 |
$55.12 |
$53.00 |
$50.00 |
$50.00 |
$51.00 |
| 13 | 307(A) 4200 |
FLY ASH | 4,923.94 | TON |
$80.00 |
$3.12 |
$81.75 |
$65.00 |
$65.00 |
$79.20 |
| 14 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 97,185.61 | SY |
$2.00 |
$1.56 |
$1.25 |
$1.50 |
$1.50 |
$2.07 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 7,962.77 | TON |
$30.00 |
$37.19 |
$31.11 |
$40.00 |
$32.50 |
$27.75 |
| 16 | 407(B) 0250 |
TACK COAT | 28,972.68 | GAL |
$3.00 |
$2.02 |
$2.16 |
$1.90 |
$2.00 |
$2.95 |
| 17 | 408 5774 |
PRIME COAT | 42,482.87 | GAL |
$3.50 |
$3.04 |
$2.60 |
$3.00 |
$3.00 |
$2.65 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 22,541.16 | TON |
$65.00 |
$57.19 |
$56.00 |
$62.00 |
$72.60 |
$65.30 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 10,943.45 | TON |
$72.00 |
$59.03 |
$62.59 |
$68.00 |
$78.00 |
$67.00 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 92,901 | SY |
$1.75 |
$1.04 |
$0.5000 |
$1.50 |
$1.75 |
$2.75 |
| 21 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 131 | CY |
$25.00 |
$31.20 |
$28.00 |
$20.00 |
$30.00 |
$20.30 |
| 22 | 509(A) 0319 |
CLASS AA CONCRETE | 398 | CY |
$500.00 |
$479.19 |
$467.00 |
$380.00 |
$460.76 |
$385.75 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 1,731.8 | CY |
$300.00 |
$285.30 |
$265.00 |
$260.00 |
$274.33 |
$263.90 |
| 24 | 511(A) 0332 |
REINFORCING STEEL | 64,467 | LB |
$1.00 |
$1.02 |
$1.12 |
$1.00 |
$0.9800 |
$1.00 |
| 25 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 480 | TON |
$60.00 |
$52.00 |
$52.10 |
$50.00 |
$50.00 |
$56.00 |
| 26 | 611(G) 5485 |
INLET CDI 30SK RCB DES. 13 | 1 | EA |
$12,000.00 |
$9,906.00 |
$5,400.00 |
$4,000.00 |
$9,525.00 |
$4,060.00 |
| 27 | 611(G) 5791 |
INLET CDI 30SK RCP DES.5 | 1 | EA |
$4,000.00 |
$5,720.00 |
$2,840.00 |
$4,000.00 |
$5,500.00 |
$4,060.00 |
| 28 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$2,200.00 |
$4,160.00 |
$2,250.00 |
$3,000.00 |
$4,000.00 |
$3,045.00 |
| 29 | 611(G) 6004 |
INLET (SMD-TYPE 2A) | 1 | EA |
$2,500.00 |
$4,680.00 |
$2,580.00 |
$3,000.00 |
$4,500.00 |
$3,045.00 |
| 30 | 611(H) 5634 |
ADD'L DEPTH IN INLET CDI RCB 30SK DES. 13 | 1.05 | VF |
$1,200.00 |
$988.00 |
$157.00 |
$5,000.00 |
$950.00 |
$5,075.00 |
| 31 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 88 | LF |
$70.00 |
$67.60 |
$62.00 |
$65.00 |
$65.00 |
$56.00 |
| 32 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 72 | LF |
$85.00 |
$78.00 |
$75.50 |
$75.00 |
$75.00 |
$90.00 |
| 33 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 256 | LF |
$110.00 |
$93.60 |
$87.00 |
$90.00 |
$90.00 |
$102.00 |
| 34 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 112 | LF |
$120.00 |
$119.60 |
$120.00 |
$115.00 |
$115.00 |
$114.00 |
| 35 | 613(A) 0498 |
60" R.C.PIPE CLASS III | 56 | LF |
$600.00 |
$208.00 |
$210.00 |
$200.00 |
$200.00 |
$237.00 |
| 36 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 32 | LF |
$90.00 |
$67.60 |
$63.75 |
$65.00 |
$65.00 |
$65.00 |
| 37 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 40 | LF |
$140.00 |
$104.00 |
$98.00 |
$100.00 |
$100.00 |
$106.00 |
| 38 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 88 | LF |
$180.00 |
$119.60 |
$112.00 |
$115.00 |
$115.00 |
$152.00 |
| 39 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 2,128 | LF |
$25.00 |
$36.40 |
$23.40 |
$35.00 |
$35.00 |
$28.00 |
| 40 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 790 | LF |
$35.00 |
$41.60 |
$27.72 |
$40.00 |
$40.00 |
$37.00 |
| 41 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 78 | LF |
$65.00 |
$83.20 |
$49.08 |
$80.00 |
$80.00 |
$57.00 |
| 42 | 613(L) 4506 |
22" X 13" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$1,200.00 |
$1,040.00 |
$900.23 |
$1,000.00 |
$1,000.00 |
$836.00 |
| 43 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,400.00 |
$1,300.00 |
$1,228.63 |
$1,250.00 |
$1,250.00 |
$1,375.00 |
| 44 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$2,000.00 |
$1,560.00 |
$1,550.00 |
$1,500.00 |
$1,500.00 |
$1,705.00 |
| 45 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,000.00 |
$1,040.00 |
$1,001.58 |
$1,000.00 |
$1,000.00 |
$845.00 |
| 46 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$2,000.00 |
$1,040.00 |
$1,200.00 |
$1,100.00 |
$1,100.00 |
$1,355.00 |
| 47 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 10 | EA |
$1,400.00 |
$1,560.00 |
$1,547.52 |
$1,500.00 |
$1,500.00 |
$1,915.00 |
| 48 | 613(L) 5736 |
42" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$2,200.00 |
$1,664.00 |
$1,650.00 |
$1,600.00 |
$1,600.00 |
$2,420.00 |
| 49 | 613(L) 5742 |
60" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$2,400.00 |
$2,600.00 |
$3,000.00 |
$2,500.00 |
$2,500.00 |
$3,750.00 |
| 50 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 48 | EA |
$1,000.00 |
$1,201.20 |
$1,185.00 |
$800.00 |
$1,155.00 |
$815.00 |
| 51 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 18 | EA |
$1,200.00 |
$1,404.00 |
$1,610.00 |
$1,000.00 |
$1,350.00 |
$1,015.00 |
| 52 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$1,800.00 |
$1,872.00 |
$2,420.00 |
$1,200.00 |
$1,800.00 |
$1,218.00 |
| 53 | 613(M) 7191 |
TYPE AA4 CULVERT END TREATMENT | 4 | EA |
$2,000.00 |
$1,736.80 |
$1,820.00 |
$2,500.00 |
$1,670.00 |
$2,537.00 |
| 54 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 2 | EA |
$2,500.00 |
$2,002.00 |
$2,300.00 |
$3,000.00 |
$1,925.00 |
$3,045.00 |
| 55 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$27,300.00 |
$25,493.23 |
$26,250.00 |
$26,250.00 |
$20,300.00 |
| 56 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 457 | LF |
$8.00 |
$5.62 |
$4.89 |
$5.40 |
$5.40 |
$5.50 |
| 57 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 32 | LF |
$15.00 |
$16.12 |
$8.61 |
$15.50 |
$15.50 |
$15.25 |
| 58 | 619(C) 0924 |
SAWING PAVEMENT | 218 | LF |
$6.00 |
$6.00 |
$1.00 |
$3.00 |
$5.00 |
$6.10 |
| 59 | 622(A) 4445 |
2" PIPE RAILING | 27 | LF |
$100.00 |
$104.00 |
$100.00 |
$100.00 |
$100.00 |
$101.50 |
| 60 | 624(A) 4281 |
FENCE-STYLE WWF | 130 | LF |
$8.00 |
$8.84 |
$8.50 |
$8.50 |
$8.50 |
$8.65 |
| 61 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 34,840 | LF |
$6.00 |
$7.28 |
$7.00 |
$8.50 |
$7.00 |
$7.10 |
| 62 | 625(A) 1251 |
REMOVE AND STORE FENCE | 35,831 | LF |
$1.00 |
$1.04 |
$1.00 |
$1.50 |
$1.00 |
$1.00 |
| 63 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 4 | EA |
$115.00 |
$98.80 |
$95.00 |
$95.00 |
$95.00 |
$96.45 |
| 64 | 629(C) 4960 |
MAILBOX | 4 | EA |
$50.00 |
$26.00 |
$25.00 |
$25.00 |
$25.00 |
$25.40 |
| 65 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 4 | EA |
$70.00 |
$26.00 |
$25.00 |
$25.00 |
$25.00 |
$25.40 |
| 66 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 1 | EA |
$100.00 |
$156.00 |
$95.02 |
$150.00 |
$100.00 |
$255.00 |
| 67 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 450 | CY |
$15.00 |
$5.20 |
$12.00 |
$20.00 |
$5.00 |
$20.30 |
| 68 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 75 | CY |
$25.00 |
$31.20 |
$25.00 |
$20.00 |
$30.00 |
$20.30 |
| 69 | 509(A) 1326 |
CLASS AA CONCRETE | 173.6 | CY |
$470.00 |
$454.62 |
$458.00 |
$500.00 |
$437.13 |
$507.00 |
| 70 | 511(A) 1332 |
REINFORCING STEEL | 30,780 | LB |
$1.00 |
$1.02 |
$1.05 |
$1.00 |
$0.9800 |
$1.00 |
| 71 | 601(A) 1351 |
TYPE I PLAIN RIPRAP | 240 | TON |
$65.00 |
$52.00 |
$52.10 |
$55.00 |
$50.00 |
$55.85 |
| 72 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$25,000.00 |
$6,240.00 |
$5,000.00 |
$20,000.00 |
$6,000.00 |
$60,900.00 |
| 73 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,130 | CY |
$15.00 |
$5.20 |
$10.50 |
$20.00 |
$5.00 |
$20.30 |
| 74 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 188 | CY |
$25.00 |
$31.20 |
$25.00 |
$20.00 |
$30.00 |
$20.30 |
| 75 | 509(A) 1326 |
CLASS AA CONCRETE | 422.6 | CY |
$475.00 |
$454.62 |
$451.00 |
$400.00 |
$437.13 |
$406.00 |
| 76 | 511(A) 1332 |
REINFORCING STEEL | 70,070 | LB |
$1.00 |
$1.02 |
$1.02 |
$1.00 |
$0.9800 |
$1.00 |
| 77 | 601(A) 1351 |
TYPE I PLAIN RIPRAP | 370 | TON |
$65.00 |
$52.00 |
$52.10 |
$55.00 |
$50.00 |
$55.85 |
| 78 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 217.39 | SF |
$25.00 |
$29.12 |
$28.00 |
$28.00 |
$28.00 |
$28.45 |
| 79 | 851(C) 8324 |
2" SQUARE TUBE POST | 428.5 | LF |
$10.00 |
$6.24 |
$6.00 |
$6.00 |
$6.00 |
$6.10 |
| 80 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 56,082 | LF |
$0.5000 |
$0.4300 |
$0.4100 |
$0.4100 |
$0.4100 |
$0.4500 |
| 81 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$22,000.00 |
$15,418.00 |
$23,500.00 |
$14,825.00 |
$14,825.00 |
$17,725.00 |
| 82 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$75,000.00 |
$37,700.00 |
$28,683.20 |
$85,500.00 |
$84,405.00 |
$95,920.00 |
| 83 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$1,000.00 |
$25,000.00 |
$10,000.00 |
$15,225.00 |
| 84 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$300,000.00 |
$139,196.40 |
$300,399.70 |
$321,000.00 |
$332,000.00 |
$320,000.00 |