| 10 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$30,000.00 |
$19,975.00 |
$10,500.00 |
$41,903.69 |
$25,000.00 |
$30,000.00 |
$20,000.00 |
$132,030.45 |
| 20 | 221(C) 2801 |
TEMPORARY SILT FENCE | 200 | LF |
$2.75 |
$2.35 |
$4.25 |
$4.58 |
$3.25 |
$4.75 |
$4.50 |
$5.17 |
| 30 | 221(F) 0100 |
TEMPORARY SILT DIKE | 200 | LF |
$10.00 |
$7.70 |
$9.85 |
$10.61 |
$15.00 |
$11.00 |
$12.00 |
$11.99 |
| 40 | 230(A) 2806 |
SOLID SLAB SODDING | 2,900 | SY |
$3.50 |
$3.00 |
$3.88 |
$4.18 |
$2.80 |
$4.50 |
$5.50 |
$7.16 |
| 50 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.6 | AC |
$1,000.00 |
$500.00 |
$1,985.00 |
$950.00 |
$1,400.00 |
$2,200.00 |
$1,500.00 |
$4,850.87 |
| 60 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 118 | TON |
$38.00 |
$35.30 |
$27.00 |
$25.91 |
$38.00 |
$45.00 |
$45.00 |
$55.39 |
| 70 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$250.00 |
$325.00 |
$300.00 |
$450.00 |
$350.00 |
$500.00 |
$469.87 |
| 80 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 78 | LF |
$35.00 |
$48.60 |
$34.00 |
$30.69 |
$75.00 |
$50.00 |
$60.00 |
$53.03 |
| 90 | 613(M) 7151 |
TYPE B3 CULVERT END TREATMENT | 2 | EA |
$1,200.00 |
$1,600.00 |
$1,250.00 |
$1,165.02 |
$900.00 |
$1,400.00 |
$1,500.00 |
$888.62 |
| 100 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 5.18 | SF |
$30.00 |
$50.00 |
$50.00 |
$16.16 |
$51.00 |
$55.00 |
$26.00 |
$31.65 |
| 110 | 851(C) 8324 |
2" SQUARE TUBE POST | 8 | LF |
$20.00 |
$25.00 |
$25.00 |
$5.39 |
$26.00 |
$27.50 |
$8.00 |
$9.74 |
| 120 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 4 | EA |
$20.00 |
$15.00 |
$15.00 |
$16.16 |
$18.00 |
$16.50 |
$26.00 |
$31.65 |
| 130 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 522 | CY |
$8.50 |
$6.15 |
$15.00 |
$9.22 |
$25.00 |
$20.00 |
$12.00 |
$10.96 |
| 140 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 99 | CY |
$18.00 |
$10.15 |
$10.00 |
$12.54 |
$25.00 |
$20.00 |
$20.00 |
$48.69 |
| 150 | 509(A) 1326 |
CLASS AA CONCRETE | 214.11 | CY |
$750.00 |
$475.00 |
$546.53 |
$473.23 |
$550.00 |
$650.00 |
$600.00 |
$531.95 |
| 160 | 511(A) 1332 |
REINFORCING STEEL | 39,249 | LB |
$1.10 |
$0.9300 |
$0.9000 |
$1.09 |
$1.20 |
$1.00 |
$2.00 |
$1.07 |
| 170 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 743 | TON |
$50.00 |
$45.00 |
$52.00 |
$41.53 |
$50.00 |
$45.00 |
$65.00 |
$63.79 |
| 180 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 248 | TON |
$40.00 |
$35.50 |
$29.00 |
$28.25 |
$38.00 |
$40.00 |
$50.00 |
$52.95 |
| 190 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$6,500.00 |
$5,500.00 |
$5,952.39 |
$15,000.00 |
$10,000.00 |
$10,000.00 |
$9,129.60 |
| 200 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 150 | SD |
$0.3500 |
$2.00 |
$2.00 |
$2.15 |
$2.20 |
$2.20 |
$4.00 |
$4.87 |
| 210 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 600 | SD |
$0.9500 |
$0.5000 |
$0.5000 |
$2.15 |
$0.6000 |
$0.5500 |
$4.00 |
$4.87 |
| 220 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 750 | SD |
$0.5000 |
$0.5000 |
$0.5000 |
$2.15 |
$0.6000 |
$0.5500 |
$0.1000 |
$0.1200 |
| 230 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,650 | SD |
$0.2000 |
$1.00 |
$1.00 |
$0.3800 |
$1.20 |
$1.10 |
$0.4000 |
$0.4900 |
| 240 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$3,600.00 |
$3,000.00 |
$5,322.80 |
$4,500.00 |
$3,500.00 |
$5,000.00 |
$5,477.76 |
| 250 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$1,250.00 |
$2,500.00 |
$2,333.77 |
$1,500.00 |
$2,000.00 |
$2,500.00 |
$6,086.40 |
| 260 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$35,000.00 |
$25,000.00 |
$17,952.78 |
$37,081.17 |
$33,000.00 |
$35,000.00 |
$40,000.00 |
$33,942.02 |