| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$9,000.00 |
$10,000.00 |
$10,000.00 |
$7,000.00 |
$16,785.00 |
$20,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$20,000.00 |
$18,000.00 |
$27,000.00 |
$20,000.00 |
$20,000.00 |
$31,480.00 |
$35,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 200 | LF |
$2.00 |
$2.45 |
$2.75 |
$2.61 |
$4.00 |
$4.70 |
$3.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 200 | LF |
$7.50 |
$14.44 |
$15.00 |
$15.38 |
$10.00 |
$13.20 |
$15.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 3,570 | SY |
$2.00 |
$2.40 |
$3.00 |
$2.56 |
$3.75 |
$3.60 |
$3.00 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.74 | AC |
$628.29 |
$250.00 |
$250.00 |
$266.25 |
$100.00 |
$110.50 |
$350.00 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 229 | TON |
$35.00 |
$65.00 |
$34.00 |
$50.00 |
$47.00 |
$123.50 |
$45.00 |
| 8 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$325.00 |
$350.00 |
$350.00 |
$300.00 |
$400.00 |
$400.00 |
$450.00 |
| 9 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 63.5 | SY |
$80.00 |
$90.00 |
$90.00 |
$80.00 |
$200.00 |
$141.50 |
$70.00 |
| 10 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 46 | LF |
$80.00 |
$85.00 |
$90.00 |
$100.00 |
$85.00 |
$120.00 |
$190.00 |
| 11 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 50 | LF |
$35.00 |
$55.00 |
$35.00 |
$95.00 |
$41.00 |
$54.50 |
$120.00 |
| 12 | 613(M) 7151 |
TYPE B3 CULVERT END TREATMENT | 2 | EA |
$1,300.00 |
$1,200.00 |
$1,500.00 |
$1,800.00 |
$1,950.00 |
$1,984.00 |
$2,500.00 |
| 13 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 4 | EA |
$20.00 |
$28.00 |
$31.00 |
$26.63 |
$30.00 |
$30.90 |
$30.00 |
| 14 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,791 | CY |
$8.00 |
$7.00 |
$10.00 |
$10.00 |
$10.50 |
$7.70 |
$20.00 |
| 15 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 83.8 | CY |
$16.00 |
$5.00 |
$15.00 |
$30.00 |
$25.50 |
$38.20 |
$20.00 |
| 16 | 509(A) 1326 |
CLASS AA CONCRETE | 207.8 | CY |
$600.00 |
$553.65 |
$585.00 |
$553.25 |
$680.00 |
$581.00 |
$580.00 |
| 17 | 511(A) 1332 |
REINFORCING STEEL | 32,595 | LB |
$1.00 |
$0.8500 |
$1.00 |
$1.00 |
$1.00 |
$1.60 |
$1.10 |
| 18 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 900 | TON |
$45.00 |
$39.00 |
$45.00 |
$55.00 |
$50.75 |
$43.00 |
$70.00 |
| 19 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 300 | TON |
$36.00 |
$33.00 |
$35.00 |
$45.00 |
$38.00 |
$42.30 |
$55.00 |
| 20 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$7,500.00 |
$7,800.00 |
$5,000.00 |
$5,000.00 |
$6,750.00 |
$15,540.00 |
$20,000.00 |
| 21 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$1,820.00 |
$2,000.00 |
$2,683.80 |
$3,000.00 |
$5,436.00 |
$4,000.00 |
| 22 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$4,200.00 |
$4,600.00 |
$5,964.00 |
$6,500.00 |
$8,062.00 |
$8,000.00 |
| 23 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$2,500.00 |
$4,000.00 |
$3,500.00 |
$2,200.00 |
$6,187.00 |
$2,500.00 |
| 24 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$30,000.00 |
$11,401.34 |
$17,500.00 |
$35,000.00 |
$38,250.00 |
$44,873.32 |
$45,000.00 |