| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$7,210.00 |
$110,000.00 |
$15,599.84 |
$13,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 10,271 | CY |
$7.00 |
$8.79 |
$8.80 |
$7.67 |
$10.50 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 3,422 | CY |
$12.00 |
$17.56 |
$16.50 |
$15.98 |
$67.00 |
| 4 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,439 | CY |
$9.00 |
$13.99 |
$13.20 |
$9.59 |
$15.00 |
| 5 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$30,900.00 |
$16,500.00 |
$18,113.72 |
$10,000.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,030 | LF |
$3.00 |
$1.42 |
$1.55 |
$1.76 |
$8.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 630 | LF |
$7.00 |
$6.32 |
$6.75 |
$7.85 |
$10.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 34,413 | SY |
$1.25 |
$1.43 |
$1.55 |
$1.78 |
$4.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 7.11 | AC |
$550.00 |
$252.35 |
$125.00 |
$313.28 |
$500.00 |
| 10 | 307(K) 4300 |
STABILIZED SUBGRADE | 11,893 | SY |
$7.00 |
$6.13 |
$3.85 |
$7.61 |
$7.00 |
| 11 | 407(B) 0250 |
TACK COAT | 1,513 | GAL |
$3.25 |
$3.61 |
$1.01 |
$3.51 |
$4.34 |
| 12 | 408 5774 |
PRIME COAT | 4,163 | GAL |
$4.00 |
$3.61 |
$2.01 |
$3.51 |
$4.34 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,706 | TON |
$70.00 |
$74.26 |
$86.15 |
$72.24 |
$89.44 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,633 | TON |
$75.00 |
$85.03 |
$106.15 |
$82.30 |
$102.40 |
| 15 | 412 5267 |
COLD MILLING PAVEMENT | 7,693 | SY |
$4.07 |
$3.09 |
$2.70 |
$2.00 |
$2.48 |
| 16 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 83 | CY |
$20.99 |
$21.63 |
$19.80 |
$32.66 |
$40.00 |
| 17 | 509(A) 0319 |
CLASS AA CONCRETE | 200 | CY |
$467.86 |
$363.59 |
$423.50 |
$325.51 |
$700.00 |
| 18 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$750.00 |
$437.75 |
$341.00 |
$856.59 |
$420.00 |
| 19 | 511(A) 0332 |
REINFORCING STEEL | 29,276 | LB |
$1.00 |
$1.13 |
$1.13 |
$0.1700 |
$1.25 |
| 20 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 397 | TON |
$40.00 |
$41.60 |
$61.50 |
$44.16 |
$40.00 |
| 21 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 132 | TON |
$35.00 |
$33.97 |
$36.00 |
$28.24 |
$40.00 |
| 22 | 613(B) 0698 |
72" CORR. GALV. STEEL PIPE | 198 | LF |
$108.54 |
$139.05 |
$113.50 |
$120.20 |
$150.00 |
| 23 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$45,000.00 |
$4,944.00 |
$27,500.00 |
$39,408.78 |
$15,000.00 |
| 24 | 619(B) 4725 |
REMOVAL OF FENCE | 6,774 | LF |
$1.32 |
$2.06 |
$1.65 |
$1.28 |
$2.00 |
| 25 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 36,808 | SY |
$6.00 |
$0.1000 |
$0.1100 |
$4.03 |
$3.80 |
| 26 | 619(C) 0924 |
SAWING PAVEMENT | 5,866 | LF |
$3.00 |
$6.18 |
$1.00 |
$2.24 |
$2.00 |
| 27 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 4,441 | LF |
$6.00 |
$6.18 |
$6.60 |
$7.67 |
$10.00 |
| 28 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,885 | CY |
$8.00 |
$25.75 |
$8.80 |
$7.67 |
$25.00 |
| 29 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 250 | CY |
$13.00 |
$25.75 |
$19.80 |
$11.51 |
$30.00 |
| 30 | 501(G) 6309 |
CLSM BACKFILL | 565 | CY |
$125.00 |
$225.05 |
$224.40 |
$170.52 |
$175.00 |
| 31 | 509(A) 1326 |
CLASS AA CONCRETE | 692.8 | CY |
$450.00 |
$395.88 |
$377.30 |
$610.36 |
$675.00 |
| 32 | 511(A) 1332 |
REINFORCING STEEL | 101,750 | LB |
$1.20 |
$1.02 |
$1.13 |
$0.9600 |
$1.15 |
| 33 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$22,000.00 |
$11,175.50 |
$105,000.00 |
$39,408.78 |
$15,000.00 |
| 34 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 5,600 | LF |
$0.5000 |
$0.4100 |
$0.5700 |
$0.4700 |
$0.5000 |
| 35 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$1,000.00 |
$206.00 |
$220.00 |
$233.85 |
$250.00 |
| 36 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 48 | SF |
$20.00 |
$14.42 |
$15.40 |
$16.37 |
$17.45 |
| 37 | 851(C) 8324 |
2" SQUARE TUBE POST | 140 | LF |
$20.00 |
$7.21 |
$7.70 |
$8.18 |
$9.00 |
| 38 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 11,207 | LF |
$0.2500 |
$0.6700 |
$0.7000 |
$0.7600 |
$0.9000 |
| 39 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 5,040 | LF |
$0.2800 |
$0.1600 |
$0.1500 |
$0.1800 |
$0.2000 |
| 40 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 960 | EA |
$0.6600 |
$0.5200 |
$0.5500 |
$0.5800 |
$0.6200 |
| 41 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 800 | LF |
$1.20 |
$1.03 |
$1.10 |
$1.17 |
$1.25 |
| 42 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 220 | SD |
$12.88 |
$3.09 |
$3.30 |
$3.51 |
$3.74 |
| 43 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,400 | LF |
$24.59 |
$15.45 |
$12.30 |
$20.93 |
$40.00 |
| 44 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 340 | SD |
$1.00 |
$2.06 |
$2.20 |
$2.34 |
$2.49 |
| 45 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,500 | SD |
$1.00 |
$0.2600 |
$0.2800 |
$0.2900 |
$0.3000 |
| 46 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,350 | SD |
$2.50 |
$0.2600 |
$0.2800 |
$0.2900 |
$0.3000 |
| 47 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 790 | SD |
$1.00 |
$0.2600 |
$0.2800 |
$0.2900 |
$0.3000 |
| 48 | 880(C) 8848 |
WING BARRICADES | 560 | SD |
$1.25 |
$0.1000 |
$0.1100 |
$0.1200 |
$0.1500 |
| 49 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,260 | SD |
$0.1000 |
$6.18 |
$6.60 |
$7.02 |
$7.00 |
| 50 | 880(F) 8878 |
DRUMS | 5,160 | SD |
$0.1500 |
$0.1600 |
$0.1700 |
$0.1800 |
$0.1900 |
| 51 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$35,000.00 |
$15,244.00 |
$65,000.00 |
$18,924.40 |
$12,500.00 |
| 52 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$3,090.00 |
$3,500.00 |
$1,918.01 |
$3,000.00 |
| 53 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$2,575.00 |
$4,000.00 |
$2,045.88 |
$5,609.41 |
| 54 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$125,000.00 |
$113,975.84 |
$125,000.00 |
$138,709.66 |
$175,000.00 |