| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$141,500.00 |
$248,000.00 |
$82,560.00 |
$47,476.00 |
$79,175.00 |
$234,952.55 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 97,286 | CY |
$8.00 |
$4.50 |
$5.00 |
$4.95 |
$6.35 |
$7.65 |
$12.30 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 29,670.46 | CY |
$10.00 |
$0.0100 |
$0.8000 |
$6.45 |
$0.1000 |
$3.35 |
$0.5000 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$50,000.00 |
$125,000.00 |
$160,000.00 |
$88,065.00 |
$73,840.00 |
$79,015.00 |
$226,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 30,770 | LF |
$3.50 |
$2.02 |
$2.40 |
$2.30 |
$2.17 |
$2.70 |
$2.20 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 9,359 | LF |
$10.00 |
$8.80 |
$10.00 |
$9.60 |
$9.15 |
$15.05 |
$9.15 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 195,033 | SY |
$2.25 |
$1.80 |
$2.00 |
$1.95 |
$1.87 |
$1.95 |
$1.94 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 40.3 | AC |
$1,000.00 |
$200.00 |
$1,000.00 |
$926.50 |
$884.00 |
$915.00 |
$915.00 |
| 9 | 241 2832 |
MOWING | 81 | AC |
$100.00 |
$75.00 |
$175.00 |
$163.50 |
$156.00 |
$214.00 |
$155.00 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 490 | CY |
$45.00 |
$74.50 |
$65.00 |
$89.60 |
$57.72 |
$72.70 |
$68.30 |
| 11 | 307(K) 4300 |
STABILIZED SUBGRADE | 41,740 | SY |
$7.00 |
$6.75 |
$6.50 |
$11.70 |
$6.99 |
$13.00 |
$7.00 |
| 12 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 13,533 | SY |
$4.00 |
$6.25 |
$1.40 |
$7.45 |
$8.06 |
$8.10 |
$4.75 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 446 | TON |
$40.00 |
$49.38 |
$47.00 |
$30.80 |
$25.93 |
$51.20 |
$36.00 |
| 14 | 407(A) 4659 |
FOG SEAL | 800 | GAL |
$5.00 |
$1.00 |
$2.35 |
$7.80 |
$7.80 |
$8.00 |
$4.05 |
| 15 | 407(B) 0250 |
TACK COAT | 5,829 | GAL |
$3.15 |
$1.00 |
$2.50 |
$3.70 |
$4.00 |
$3.60 |
$2.50 |
| 16 | 408 5774 |
PRIME COAT | 16,146 | GAL |
$6.00 |
$1.00 |
$2.75 |
$5.00 |
$4.68 |
$4.85 |
$2.50 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 9,803 | TON |
$70.00 |
$85.00 |
$80.00 |
$80.00 |
$81.12 |
$76.65 |
$76.80 |
| 18 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,707 | TON |
$90.00 |
$95.00 |
$91.50 |
$85.00 |
$92.04 |
$86.35 |
$84.50 |
| 19 | 411(D) 5975 |
SUPERPAVE, TYPE S5(PG 64-22 OK) | 2,522 | TON |
$100.00 |
$75.00 |
$91.00 |
$85.25 |
$82.16 |
$88.50 |
$72.65 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 40,015 | SY |
$8.00 |
$0.7900 |
$1.50 |
$2.30 |
$2.50 |
$5.55 |
$2.50 |
| 21 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 135 | CY |
$20.00 |
$30.00 |
$23.00 |
$33.00 |
$27.04 |
$37.65 |
$39.00 |
| 22 | 509(A) 0319 |
CLASS AA CONCRETE | 364 | CY |
$400.00 |
$470.00 |
$538.00 |
$418.50 |
$452.40 |
$489.15 |
$516.00 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 1,610 | CY |
$325.00 |
$295.00 |
$280.00 |
$352.50 |
$308.88 |
$231.15 |
$304.00 |
| 24 | 511(A) 0332 |
REINFORCING STEEL | 54,172 | LB |
$0.9500 |
$1.10 |
$0.7500 |
$0.9400 |
$1.20 |
$1.05 |
$1.20 |
| 25 | 514(J) 6390 |
TEMPORARY SHEET PILING | 1 | LSUM |
$100,000.00 |
$175,000.00 |
$250,000.00 |
$88,065.00 |
$104,000.00 |
$53,750.00 |
$128,450.00 |
| 26 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 264 | TON |
$60.00 |
$58.00 |
$75.00 |
$86.78 |
$49.98 |
$69.90 |
$56.20 |
| 27 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 66 | TON |
$40.00 |
$44.00 |
$58.00 |
$122.00 |
$37.85 |
$69.90 |
$51.00 |
| 28 | 611(G) 5388 |
INLET CDI RCB DES. 2 | 1 | EA |
$15,000.00 |
$5,800.00 |
$5,700.00 |
$4,954.00 |
$3,669.12 |
$3,762.50 |
$2,690.00 |
| 29 | 611(G) 5395 |
INLET CDI RCB DES. 9 | 2 | EA |
$15,000.00 |
$9,000.00 |
$7,500.00 |
$7,155.00 |
$5,220.80 |
$5,912.50 |
$5,715.00 |
| 30 | 611(G) 5706 |
INLET CDI RCP DES. 3 | 1 | EA |
$15,000.00 |
$4,160.00 |
$6,100.00 |
$3,523.00 |
$3,669.12 |
$3,762.50 |
$2,675.00 |
| 31 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 9 | EA |
$10,000.00 |
$3,200.00 |
$3,500.00 |
$3,523.00 |
$3,822.00 |
$3,440.00 |
$2,580.00 |
| 32 | 611(H) 5537 |
ADD'L DEPTH IN INLET CDI RCB DES. 2 | 3.74 | VF |
$500.00 |
$500.00 |
$700.00 |
$440.50 |
$265.20 |
$376.25 |
$388.00 |
| 33 | 611(H) 5544 |
ADD'L DEPTH IN INLET CDI RCB DES. 9 | 8.31 | VF |
$750.00 |
$600.00 |
$800.00 |
$495.50 |
$348.40 |
$956.75 |
$463.00 |
| 34 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 148 | LF |
$60.00 |
$54.00 |
$65.00 |
$64.40 |
$59.94 |
$62.00 |
$59.80 |
| 35 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 108 | LF |
$90.00 |
$75.00 |
$95.00 |
$97.50 |
$82.11 |
$84.90 |
$80.80 |
| 36 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 1,334 | LF |
$30.00 |
$28.00 |
$40.00 |
$31.40 |
$36.31 |
$37.55 |
$42.10 |
| 37 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 1,114 | LF |
$50.00 |
$33.00 |
$47.00 |
$51.20 |
$41.34 |
$42.75 |
$50.20 |
| 38 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 84 | LF |
$75.00 |
$70.00 |
$93.00 |
$90.80 |
$78.86 |
$81.55 |
$120.00 |
| 39 | 613(B) 0698 |
72" CORR. GALV. STEEL PIPE | 522 | LF |
$100.00 |
$85.00 |
$106.00 |
$127.00 |
$126.72 |
$131.00 |
$213.00 |
| 40 | 613(B) 5717 |
15" CORR. GALV. STEEL PIPE | 98 | LF |
$30.00 |
$27.00 |
$41.00 |
$30.80 |
$34.07 |
$35.25 |
$39.50 |
| 41 | 613(L) 5724 |
15" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$1,000.00 |
$1,500.00 |
$715.00 |
$440.50 |
$433.68 |
$448.30 |
$276.00 |
| 42 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,000.00 |
$1,150.00 |
$865.00 |
$660.50 |
$984.88 |
$1,018.05 |
$1,144.00 |
| 43 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,100.00 |
$1,400.00 |
$1,000.00 |
$1,046.00 |
$1,144.00 |
$1,182.50 |
$1,405.00 |
| 44 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$2,500.00 |
$3,500.00 |
$2,200.00 |
$2,036.00 |
$1,373.84 |
$1,420.10 |
$936.00 |
| 45 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 28 | EA |
$1,200.00 |
$1,100.00 |
$1,200.00 |
$1,321.00 |
$1,508.00 |
$1,505.00 |
$1,092.00 |
| 46 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 6 | EA |
$1,400.00 |
$1,200.00 |
$1,400.00 |
$1,431.00 |
$1,882.40 |
$1,935.00 |
$1,352.00 |
| 47 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 1 | EA |
$2,000.00 |
$1,350.00 |
$2,000.00 |
$1,761.00 |
$2,756.00 |
$2,150.00 |
$1,924.00 |
| 48 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 10 | EA |
$2,000.00 |
$2,000.00 |
$2,300.00 |
$1,541.00 |
$3,411.20 |
$2,365.00 |
$2,366.00 |
| 49 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$1,750.00 |
$1,400.00 |
$1,500.00 |
$2,202.00 |
$2,437.76 |
$2,150.00 |
$1,862.00 |
| 50 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 1,372 | CY |
$50.00 |
$50.00 |
$30.00 |
$66.10 |
$51.05 |
$52.80 |
$23.00 |
| 51 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$14,000.00 |
$90,000.00 |
$35,000.00 |
$27,520.00 |
$23,894.00 |
$68,775.00 |
$145,000.00 |
| 52 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 443 | SY |
$5.00 |
$19.06 |
$3.30 |
$32.50 |
$10.40 |
$12.90 |
$25.00 |
| 53 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 595 | LF |
$5.00 |
$4.00 |
$20.00 |
$6.60 |
$3.12 |
$6.45 |
$9.50 |
| 54 | 619(C) 0924 |
SAWING PAVEMENT | 576 | LF |
$5.00 |
$3.75 |
$3.00 |
$8.80 |
$8.32 |
$5.40 |
$2.60 |
| 55 | 624(A) 4281 |
FENCE-STYLE WWF | 4,982 | LF |
$5.00 |
$6.75 |
$7.75 |
$7.20 |
$6.86 |
$7.10 |
$8.10 |
| 56 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 8,391 | LF |
$4.50 |
$5.00 |
$5.50 |
$5.35 |
$5.10 |
$5.30 |
$6.00 |
| 57 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 13,047 | LF |
$5.00 |
$5.50 |
$6.25 |
$5.90 |
$5.61 |
$5.85 |
$7.00 |
| 58 | 624(E) 4288 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 202 | LF |
$10.00 |
$23.00 |
$26.50 |
$24.50 |
$23.40 |
$24.20 |
$43.70 |
| 59 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 7,450 | CY |
$7.50 |
$5.20 |
$8.00 |
$6.35 |
$8.84 |
$6.60 |
$15.60 |
| 60 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 402 | CY |
$18.00 |
$30.00 |
$35.00 |
$33.00 |
$124.80 |
$32.25 |
$35.40 |
| 61 | 509(A) 1326 |
CLASS AA CONCRETE | 1,263.1 | CY |
$425.00 |
$370.00 |
$430.00 |
$402.00 |
$569.46 |
$451.50 |
$397.00 |
| 62 | 511(A) 1332 |
REINFORCING STEEL | 194,770 | LB |
$1.25 |
$1.10 |
$1.00 |
$0.9400 |
$1.08 |
$1.05 |
$1.00 |
| 63 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$100,000.00 |
$20,000.00 |
$50,000.00 |
$96,164.12 |
$52,675.00 |
$35,000.00 |
| 64 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 5,450 | CY |
$7.50 |
$5.20 |
$8.00 |
$6.35 |
$8.84 |
$6.60 |
$15.60 |
| 65 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 352 | CY |
$18.00 |
$30.00 |
$35.00 |
$33.00 |
$93.60 |
$32.25 |
$35.50 |
| 66 | 509(A) 1326 |
CLASS AA CONCRETE | 1,051.8 | CY |
$425.00 |
$390.00 |
$450.00 |
$402.00 |
$569.46 |
$451.50 |
$400.00 |
| 67 | 511(A) 1332 |
REINFORCING STEEL | 144,180 | LB |
$1.25 |
$1.10 |
$1.00 |
$0.9400 |
$1.05 |
$1.05 |
$1.00 |
| 68 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$45,000.00 |
$100,000.00 |
$20,000.00 |
$50,000.00 |
$95,932.07 |
$63,425.00 |
$35,000.00 |
| 69 | 413(A) 4870 |
RUMBLE STRIP-CENTERLINE HMA-CON | 30,600 | LF |
$0.1500 |
$0.0500 |
$0.1500 |
$0.1900 |
$0.0500 |
$0.2000 |
$0.2500 |
| 70 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 71,200 | LF |
$0.1500 |
$0.0500 |
$0.1400 |
$0.1600 |
$0.0500 |
$0.1600 |
$0.2000 |
| 71 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 171.65 | SF |
$25.00 |
$18.50 |
$20.00 |
$26.20 |
$18.72 |
$25.80 |
$25.00 |
| 72 | 851(C) 8324 |
2" SQUARE TUBE POST | 365 | LF |
$10.00 |
$10.25 |
$11.50 |
$7.65 |
$10.40 |
$7.55 |
$7.30 |
| 73 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 91,118 | LF |
$0.2600 |
$0.4000 |
$0.5000 |
$0.3600 |
$0.4100 |
$0.3500 |
$0.3500 |
| 74 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 90 | LF |
$0.7500 |
$10.25 |
$12.00 |
$1.80 |
$10.40 |
$1.80 |
$1.70 |
| 75 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 88,700 | LF |
$0.1500 |
$0.1100 |
$0.1300 |
$0.1300 |
$0.1100 |
$0.1500 |
$0.1500 |
| 76 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 2,060 | EA |
$0.7500 |
$0.5000 |
$0.6000 |
$0.7400 |
$0.5200 |
$0.7500 |
$0.7000 |
| 77 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,800 | SD |
$12.00 |
$5.10 |
$6.00 |
$6.55 |
$5.20 |
$6.45 |
$6.25 |
| 78 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,975 | LF |
$25.00 |
$30.00 |
$12.00 |
$19.60 |
$20.07 |
$20.45 |
$18.70 |
| 79 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,975 | LF |
$30.00 |
$2.00 |
$6.00 |
$2.60 |
$4.16 |
$3.70 |
$2.50 |
| 80 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 23,700 | SD |
$0.4000 |
$0.2500 |
$0.3000 |
$0.0200 |
$0.2600 |
$0.0300 |
$0.0200 |
| 81 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,500 | SD |
$0.7500 |
$2.00 |
$2.40 |
$2.70 |
$2.08 |
$2.70 |
$2.60 |
| 82 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 9,900 | SD |
$2.00 |
$0.5000 |
$0.6000 |
$2.70 |
$0.5200 |
$2.70 |
$2.60 |
| 83 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,400 | SD |
$1.00 |
$0.5000 |
$0.6000 |
$3.25 |
$0.5200 |
$3.25 |
$3.15 |
| 84 | 880(C) 8848 |
WING BARRICADES | 6,000 | SD |
$3.75 |
$0.1000 |
$0.1500 |
$0.0200 |
$0.1000 |
$0.0300 |
$0.0200 |
| 85 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 6,900 | SD |
$1.00 |
$3.55 |
$4.00 |
$0.7600 |
$3.64 |
$0.7500 |
$0.7300 |
| 86 | 880(F) 8878 |
DRUMS | 27,900 | SD |
$0.5000 |
$0.2000 |
$0.2500 |
$0.0200 |
$0.2100 |
$0.0300 |
$0.0200 |
| 87 | 880(G) 8884 |
TUBE CHANNELIZERS | 14,700 | SD |
$0.4000 |
$0.2000 |
$0.2500 |
$0.0200 |
$0.2100 |
$0.0300 |
$0.0200 |
| 88 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 600 | SD |
$12.50 |
$15.25 |
$18.00 |
$21.80 |
$15.60 |
$21.50 |
$20.80 |
| 89 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$37,834.53 |
$60,500.00 |
$116,000.00 |
$120,000.00 |
$44,720.00 |
$83,850.00 |
$63,000.00 |
| 90 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$90,000.00 |
$2,650.00 |
$6,760.00 |
$8,600.00 |
$23,000.00 |
| 91 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$12,000.00 |
$15,000.00 |
$51,500.00 |
$5,300.00 |
$4,680.00 |
$9,675.00 |
$32,000.00 |
| 92 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$350,000.00 |
$340,000.00 |
$362,000.00 |
$375,000.00 |
$326,315.62 |
$461,216.75 |
$390,806.00 |