Bid tab 190087

Let Apr 18, 2019 · Division 8 · Nowata Sign up free

‹ Apr 2019 results

BRIDGE REHABILITATION SH -10: OVER UNNAMED CREEK, 1.6 MILES EAST OF THE US -169 JUNCTION NEAR LENAPAH . PROJECT LENGTH = 0.108 MILE

Let date
Thursday, April 18, 2019
Contract
190087
J/P numbers
31364(04)
District
Division 8
County
Nowata
Highway
Limits
BRIDGE REHABILITATION SH -10: OVER UNNAMED CREEK, 1.6 MILES EAST OF THE US -169 JUNCTION NEAR LENAPAH . PROJECT LENGTH = 0.108 MILE
Project number
SBR-253C(046)SB

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$509,928
1 Tri Star Construction Arkansas, LLC Low bidder $519,208 +1.8%
2 RRY SERVICES LLC $582,424 +14.2% +12.2%
3 B & B BRIDGE COMPANY, LLC $635,141 +24.6% +22.3%
4 Built Right Construction, LLC $737,679 +44.7% +42.1%
5 KLAVER CONSTRUCTION COMPANY, INC. $748,245 +46.7% +44.1%

Bid tab: unit prices 48 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Tri Star Constr…#2 RRY SERVICES LLC#3 B & B BRIDGE CO…#4 Built Right Con…#5 KLAVER CONSTRUC…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $5,000.00 $3,160.80 $6,500.00 $7,500.00 $5,000.00 $10,000.00
2202(H) 0185 EARTHWORK1LSUM $18,500.00 $18,515.50 $20,000.00 $45,000.00 $15,000.00 $50,000.00
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $4,500.00 $9,293.40 $6,500.00 $5,500.00 $7,500.00 $4,500.00
4221(C) 2801 TEMPORARY SILT FENCE1,200LF $2.50 $2.20 $2.99 $2.99 $4.00 $2.99
5221(F) 0100 TEMPORARY SILT DIKE168LF $9.00 $10.20 $39.00 $39.00 $15.00 $39.00
6230(A) 2806 SOLID SLAB SODDING3,866SY $2.50 $1.90 $3.95 $3.95 $4.50 $3.95
7233(A) 2817 VEGETATIVE MULCHING1.6AC $1,500.00 $703.00 $2,900.00 $2,900.00 $1,500.00 $2,900.00
8303(A) 2100 AGGREGATE BASE TYPE A234CY $60.00 $73.70 $100.00 $67.88 $70.00 $75.00
9402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E189TON $30.00 $43.10 $40.00 $40.00 $30.00 $42.00
10407(B) 0250 TACK COAT477GAL $3.00 $4.00 $3.50 $3.00 $4.00 $4.00
11408 5774 PRIME COAT279GAL $3.50 $4.10 $6.00 $3.00 $10.00 $4.00
12411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)840TON $75.00 $85.20 $75.00 $75.15 $150.00 $95.00
13411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)174TON $85.00 $100.20 $125.00 $103.00 $100.00 $109.00
14411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)136TON $82.00 $92.50 $115.00 $80.60 $150.00 $105.00
15412 5267 COLD MILLING PAVEMENT1,418SY $2.00 $3.10 $9.00 $6.50 $10.00 $7.00
16619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $5,000.00 $1,798.00 $3,000.00 $4,900.00 $5,000.00 $5,400.00
17619(B) 4728 REMOVAL OF ASPHALT PAVEMENT129SY $5.00 $17.10 $25.00 $12.00 $10.00 $20.00
18619(B) 4780 REMOVAL OF GUARDRAIL498LF $4.00 $2.40 $6.00 $8.00 $7.00 $5.00
19619(C) 0924 SAWING PAVEMENT1,208LF $4.00 $1.50 $6.00 $8.00 $15.00 $6.00
20623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE150LF $20.00 $23.00 $22.00 $22.00 $25.00 $22.00
21623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $3,000.00 $2,769.30 $1,800.00 $2,600.00 $3,000.00 $2,650.00
22623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,000.00 $1,881.00 $2,650.00 $2,000.00 $3,000.00 $1,800.00
23202(A) 1301 UNCLASSIFIED EXCAVATION560CY $10.00 $7.90 $14.00 $12.50 $12.00 $20.00
24501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED161CY $35.00 $26.10 $18.00 $30.00 $20.00 $5.00
25502(A) 6173 ENGINEERED FALSEWORK1LSUM $10,000.00 $5,006.20 $15,000.00 $20,000.00 $5,000.00 $47,189.52
26504(D) 6245 CONCRETE RAIL (TR4)52LF $80.00 $176.70 $200.00 $100.00 $100.00 $125.00
27509(A) 1326 CLASS AA CONCRETE156.9CY $900.00 $503.20 $800.00 $1,045.00 $700.00 $1,481.62
28511(A) 1332 REINFORCING STEEL28,050LB $1.10 $1.20 $1.20 $1.00 $3.00 $0.9000
29515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)28SY $5.00 $6.00 $10.00 $10.00 $5.00 $100.00
30520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER20LF $30.00 $80.00 $80.00 $35.00 $30.00 $90.00
31520(C) 6060 EPOXY RESIN, ABOVE WATER2GAL $90.00 $85.00 $85.00 $40.00 $150.00 $90.00
32619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $15,000.00 $71,764.50 $26,000.00 $30,000.00 $20,000.00 $5,000.00
33823 8478 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM120SD $125.00 $185.00 $110.00 $99.25 $77.00 $185.00
34856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)1,700LF $0.5000 $1.00 $2.00 $2.00 $3.10 $1.00
35857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)3,450LF $0.3000 $0.1000 $0.2000 $0.2000 $0.5200 $0.1000
36857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)3,450LF $1.25 $0.8000 $0.9000 $0.9000 $1.50 $0.7500
37857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)1,680LF $0.5000 $0.1000 $0.2500 $0.2500 $1.75 $0.1000
38871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.240SD $15.00 $5.00 $5.00 $5.00 $8.00 $5.00
39877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER300LF $27.50 $25.30 $22.50 $30.00 $29.00 $48.25
40880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF3,120SD $0.7000 $0.1000 $2.00 $2.00 $0.5000 $0.1000
41880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF2,220SD $1.00 $1.00 $1.50 $1.50 $0.5500 $1.00
42880(C) 8848 WING BARRICADES480SD $3.75 $1.00 $1.00 $1.00 $4.00 $1.00
43880(E) 8860 WARNING LIGHTS(TYPE A)1,920SD $0.5000 $0.1000 $0.2500 $0.2500 $0.6500 $0.1000
44880(F) 8878 DRUMS4,800SD $0.2100 $0.1000 $0.2500 $0.2500 $1.30 $0.1000
45880(I) 8902 FLAGGER30SD $84.91 $277.50 $300.00 $250.00 $10.00 $600.00
46642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $5,000.00 $7,774.00 $6,994.00 $4,300.00 $15,000.00 $10,000.00
47220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $2,000.00 $500.00 $2,000.00 $5,000.00 $2,500.00
48641 1399 MOBILIZATION1LSUM $48,000.00 $45,049.20 $54,000.00 $63,000.00 $120,000.00 $53,347.31