| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$6,500.00 |
$2,500.00 |
$7,250.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 870 | CY |
$8.00 |
$10.00 |
$7.77 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,640 | CY |
$10.00 |
$12.00 |
$12.77 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$6,000.00 |
$1,000.00 |
$2,750.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,900 | LF |
$2.00 |
$2.10 |
$2.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 210 | LF |
$9.00 |
$8.00 |
$12.55 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 5,900 | SY |
$2.50 |
$7.25 |
$4.55 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 2 | AC |
$500.00 |
$4,000.00 |
$777.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 570 | CY |
$49.00 |
$46.00 |
$47.50 |
| 10 | 325 5271 |
SEPARATOR FABRIC | 3,115 | SY |
$1.75 |
$2.10 |
$4.00 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 734 | TON |
$26.00 |
$28.00 |
$26.33 |
| 12 | 407(B) 0250 |
TACK COAT | 390 | GAL |
$4.00 |
$1.00 |
$1.25 |
| 13 | 408 5774 |
PRIME COAT | 1,695 | GAL |
$5.00 |
$3.75 |
$4.44 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 380 | TON |
$75.00 |
$75.00 |
$84.68 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 245 | TON |
$83.00 |
$79.00 |
$88.46 |
| 16 | 412 5267 |
COLD MILLING PAVEMENT | 2,140 | SY |
$2.60 |
$1.35 |
$1.99 |
| 17 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$430.00 |
$295.00 |
| 18 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 160 | TON |
$41.00 |
$47.00 |
$38.99 |
| 19 | 613(EE) 5610 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 168 | LF |
$35.00 |
$29.00 |
$39.00 |
| 20 | 613(EE) 5680 |
(SP) 60" CORRUGATED POLYPROPYLENE PIPE | 240 | LF |
$150.00 |
$155.00 |
$165.00 |
| 21 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$760.00 |
$350.00 |
$375.00 |
| 22 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$6,000.00 |
$5,000.00 |
$2,250.00 |
| 23 | 619(C) 0924 |
SAWING PAVEMENT | 44 | LF |
$10.00 |
$8.00 |
$15.00 |
| 24 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$20.00 |
$23.00 |
$24.33 |
| 25 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,400.00 |
$1,650.00 |
$2,933.00 |
| 26 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,500.00 |
$2,800.00 |
$1,816.00 |
| 27 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 1,632 | LF |
$5.00 |
$5.75 |
$7.33 |
| 28 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,350 | CY |
$8.00 |
$14.00 |
$7.77 |
| 29 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 360 | CY |
$21.00 |
$18.00 |
$12.25 |
| 30 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 200 | CY |
$32.00 |
$25.00 |
$12.77 |
| 31 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 129 | LF |
$70.00 |
$105.00 |
$122.00 |
| 32 | 509(A) 1326 |
CLASS AA CONCRETE | 331 | CY |
$600.00 |
$380.00 |
$395.00 |
| 33 | 511(A) 1332 |
REINFORCING STEEL | 60,835 | LB |
$0.9500 |
$0.9500 |
$1.10 |
| 34 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$7,500.00 |
$27,500.00 |
| 35 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 3,600 | LF |
$0.6000 |
$0.3500 |
$0.4000 |
| 36 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,000.00 |
$2,000.00 |
$4,250.00 |
| 37 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$40,000.00 |
$3,000.00 |
$7,250.00 |
| 38 | 202(E) 0186 |
SELECT BORROW | 2,000 | CY |
$23.90 |
$10.00 |
$27.50 |
| 39 | 221(F) 0100 |
TEMPORARY SILT DIKE | 245 | LF |
$9.00 |
$8.00 |
$9.00 |
| 40 | 230(A) 2806 |
SOLID SLAB SODDING | 5,000 | SY |
$2.50 |
$7.15 |
$4.65 |
| 41 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 500 | CY |
$59.80 |
$46.00 |
$52.33 |
| 42 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,433 | TON |
$29.60 |
$24.00 |
$26.55 |
| 43 | 407(A) 4659 |
FOG SEAL | 500 | GAL |
$3.10 |
$3.75 |
$4.25 |
| 44 | 407(B) 0250 |
TACK COAT | 4,754 | GAL |
$3.20 |
$1.00 |
$1.12 |
| 45 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,424 | TON |
$75.00 |
$75.00 |
$84.68 |
| 46 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,790 | TON |
$83.20 |
$79.00 |
$88.46 |
| 47 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 550 | TON |
$100.00 |
$160.00 |
$174.50 |
| 48 | 412 5267 |
COLD MILLING PAVEMENT | 30,940 | SY |
$2.60 |
$2.75 |
$1.45 |
| 49 | 509(D) 0325 |
CLASS C CONCRETE | 12 | CY |
$400.00 |
$420.00 |
$295.00 |
| 50 | 611(G) 5707 |
INLET CDI RCP DES. 4 | 1 | EA |
$3,500.00 |
$4,600.00 |
$2,750.00 |
| 51 | 612(J) 4480 |
WATER LINE LOWERED | 60 | LF |
$50.00 |
$80.00 |
$100.00 |
| 52 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 56 | LF |
$120.00 |
$110.00 |
$66.24 |
| 53 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 228 | LF |
$175.00 |
$160.00 |
$112.33 |
| 54 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 40 | LF |
$158.00 |
$170.00 |
$78.99 |
| 55 | 613(A) 4499 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 100 | LF |
$213.00 |
$210.00 |
$156.49 |
| 56 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,350.00 |
$1,250.00 |
$1,650.00 |
| 57 | 613(L) 4540 |
51" X 31" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$2,000.00 |
$1,800.00 |
$3,333.00 |
| 58 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,500.00 |
$1,800.00 |
$2,250.00 |
| 59 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 10 | EA |
$2,000.00 |
$1,950.00 |
$2,999.00 |
| 60 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 444 | CY |
$41.00 |
$44.00 |
$67.50 |
| 61 | 613(V) 1180 |
TRENCH EXCAVATION | 366 | CY |
$18.50 |
$10.00 |
$42.55 |
| 62 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$25,000.00 |
$12,750.00 |
| 63 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$1,500.00 |
$1,250.00 |
$2,250.00 |
| 64 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 6 | SF |
$22.20 |
$16.50 |
$42.00 |
| 65 | 851(C) 8324 |
2" SQUARE TUBE POST | 24 | LF |
$10.80 |
$15.00 |
$14.00 |
| 66 | 853 9039 |
DELINEATORS(TYPE 2, CODE 3) | 12 | EA |
$30.00 |
$28.00 |
$27.00 |
| 67 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 77,508 | LF |
$0.6000 |
$0.3500 |
$0.3900 |
| 68 | 880(I) 8902 |
FLAGGER | 10 | SD |
$151.00 |
$150.00 |
$400.00 |
| 69 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$14,000.00 |
$4,250.00 |
| 70 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 120 | SD |
$25.00 |
$6.00 |
$33.00 |
| 71 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$20,000.00 |
$27,500.00 |
| 72 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$2,500.00 |
$4,250.00 |
| 73 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$125,000.00 |
$95,000.00 |
$49,000.00 |