Bid tab 200316

Let Oct 15, 2020 · · Grady, Mcclain Sign up free

‹ Oct 2020 results

BRIDGE AND APPROACHES COUNTY ROADS (EW-141 (180TH STREET) / NS-299): EW-141, OVER TRIBUTARY TO LAFLIN CREEK 1.7 MILES WEST OF SH -76. NS-299, FROM EW-141 EXTEND NORTH NEAR CRINER . PROJECT LENGTH = 0.354 MILE

Let date
Thursday, October 15, 2020
Contract
200316
J/P numbers
33067(04)
District
County
Grady, Mcclain
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROADS (EW-141 (180TH STREET) / NS-299): EW-141, OVER TRIBUTARY TO LAFLIN CREEK 1.7 MILES WEST OF SH -76. NS-299, FROM EW-141 EXTEND NORTH NEAR CRINER . PROJECT LENGTH = 0.354 MILE
Project number
STP-244D(071)CI

Bidders 10

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$884,201
1 Treas Construction Inc Low bidder $766,364 -13.3%
2 K & R BUILDERS, INC. $799,991 -9.5% +4.4%
3 RRY SERVICES LLC $860,612 -2.7% +12.3%
4 KLAVER CONSTRUCTION COMPANY, INC. $875,112 -1.0% +14.2%
5 Redlands Contracting, LLC $902,377 +2.1% +17.7%
6 C-P INTEGRATED SERVICES, INC. $907,269 +2.6% +18.4%
7 Built Right Construction, LLC $952,695 +7.7% +24.3%
8 Frontier Bridge, Inc. $957,201 +8.3% +24.9%
9 Silver Star Construction Company, Inc. $983,600 +11.2% +28.3%
10 HASKELL LEMON CONSTRUCTION CO. $1,066,948 +20.7% +39.2%

Bid tab: unit prices 46 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Treas Construct…#2 K & R BUILDERS,…#3 RRY SERVICES LLC#4 KLAVER CONSTRUC…#5 Redlands Contra…#6 C-P INTEGRATED …#7 Built Right Con…#8 Frontier Bridge…
10201(A) 0102 CLEARING AND GRUBBING1LSUM $15,000.00 $10,250.00 $14,500.00 $15,000.00 $25,000.00 $21,000.00 $26,480.91 $5,000.00 $19,800.00
20202(A) 0183 UNCLASSIFIED EXCAVATION8,698CY $9.00 $9.00 $9.50 $8.00 $4.00 $8.00 $5.92 $10.00 $7.43
30202(D) 0184 UNCLASSIFIED BORROW1,506CY $15.00 $9.15 $10.00 $11.00 $18.00 $16.65 $13.12 $16.00 $9.90
40221(C) 2801 TEMPORARY SILT FENCE126LF $2.50 $5.00 $11.00 $6.00 $3.69 $12.00 $4.30 $4.00 $11.00
50221(F) 0100 TEMPORARY SILT DIKE434LF $15.00 $13.00 $16.50 $13.50 $12.77 $18.00 $14.90 $20.00 $16.50
60228 4170 NYLON EROSION CONTROL MAT3,450SY $15.00 $12.00 $4.40 $12.50 $28.50 $5.00 $25.25 $18.00 $4.40
70230(A) 2806 SOLID SLAB SODDING20,150SY $3.50 $2.20 $4.40 $2.40 $2.49 $4.35 $5.24 $3.00 $4.40
80233(A) 2817 VEGETATIVE MULCHING8.32AC $1,000.00 $850.00 $1,000.00 $850.00 $995.00 $2,000.00 $1,160.73 $1,000.00 $2,200.00
90307(K) 4300 STABILIZED SUBGRADE5,518SY $7.00 $5.75 $6.32 $5.95 $5.75 $6.25 $7.00 $8.00 $6.33
100310(B) 0149 SUBGRADE, METHOD B5,172SY $2.00 $3.00 $2.25 $1.25 $2.00 $5.00 $5.83 $7.00 $3.30
110402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E1,188TON $30.00 $27.47 $31.35 $45.00 $29.30 $48.00 $39.66 $42.00 $31.17
120408 5774 PRIME COAT1,849GAL $5.00 $4.31 $6.60 $6.00 $6.00 $6.25 $8.17 $5.00 $6.60
130411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)1,162TON $85.00 $80.44 $87.50 $81.00 $79.00 $88.00 $93.44 $100.00 $86.90
140411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)562TON $100.00 $99.56 $114.40 $106.00 $104.00 $116.00 $98.50 $105.00 $114.40
150509(D) 0325 CLASS C CONCRETE10CY $350.00 $585.00 $285.00 $270.00 $350.00 $310.00 $417.63 $500.00 $528.56
160601(A) 0297 TYPE I PLAIN RIPRAP201TON $50.00 $42.70 $50.50 $60.00 $39.61 $58.00 $57.16 $65.00 $57.22
170613(A) 0492 24" R.C.PIPE CLASS III66LF $85.00 $34.83 $113.00 $85.00 $44.00 $70.00 $52.36 $78.00 $92.78
180613(B) 0689 18" CORR. GALV. STEEL PIPE104LF $35.00 $20.48 $32.00 $50.00 $28.00 $45.00 $30.91 $30.00 $40.81
190613(B) 0696 60" CORR. GALV. STEEL PIPE106LF $120.00 $81.29 $83.50 $235.00 $85.00 $145.00 $80.81 $65.00 $142.73
200613(B) 4528 28" X 20" CORR. GALV. STEEL PIPE ARCH142LF $40.00 $29.30 $35.00 $60.00 $34.00 $52.00 $44.27 $40.00 $43.22
210613(L) 4516 28" X 20" PREFAB. CULVERT END SECTION, ARCH8EA $800.00 $210.63 $312.00 $400.00 $820.00 $410.00 $845.76 $250.00 $804.72
220613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND6EA $530.00 $173.69 $235.00 $400.00 $600.00 $318.00 $482.96 $525.00 $571.98
230613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND2EA $800.00 $661.07 $1,000.00 $1,000.00 $750.00 $1,125.00 $1,006.98 $1,500.00 $1,202.05
240619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $10,000.00 $5,000.00 $4,240.00 $4,500.00 $10,000.00 $8,500.00 $3,499.68 $5,000.00 $4,400.00
250619(B) 4728 REMOVAL OF ASPHALT PAVEMENT493SY $6.00 $3.00 $7.00 $9.00 $15.00 $8.00 $15.17 $12.00 $6.60
260624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)2,550LF $6.00 $6.90 $7.59 $6.90 $3.75 $10.30 $5.83 $6.00 $7.59
270624(H) 5920 (PL) GATE1EA $600.00 $3,000.00 $3,300.00 $3,000.00 $500.00 $1,200.00 $874.92 $1,700.00 $3,300.00
280629(E) 5048 REMOVE AND RESET MAILBOX7EA $200.00 $50.00 $165.00 $125.00 $75.00 $350.00 $291.64 $100.00 $275.00
290202(A) 1301 UNCLASSIFIED EXCAVATION598CY $12.00 $20.00 $7.50 $10.00 $8.00 $12.00 $9.33 $12.00 $11.00
300501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED81CY $30.00 $20.00 $15.50 $15.00 $10.00 $42.00 $17.50 $20.00 $88.00
310509(A) 1326 CLASS AA CONCRETE207CY $600.00 $577.98 $560.00 $650.00 $654.85 $480.00 $477.12 $600.00 $739.59
320511(A) 1332 REINFORCING STEEL28,200LB $1.00 $0.9800 $0.9500 $1.05 $0.9000 $1.40 $1.05 $1.50 $1.24
330601(B) 1353 TYPE I-A PLAIN RIPRAP431TON $50.00 $47.70 $48.75 $70.00 $39.61 $58.00 $57.16 $65.00 $51.72
340601(C) 1355 TYPE I-A FILTER BLANKET126TON $40.00 $36.05 $36.50 $55.00 $28.21 $54.00 $13.71 $45.00 $39.21
350619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $25,000.00 $5,099.50 $8,750.00 $10,000.00 $6,000.00 $18,000.00 $12,832.16 $5,000.00 $44,000.00
360805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS3EA $150.00 $125.00 $137.50 $125.00 $125.00 $145.00 $291.64 $125.00 $110.00
370850(A) 8110 SHEET ALUMINUM SIGNS8SF $25.00 $50.00 $55.00 $20.00 $50.00 $28.00 $58.33 $50.00 $22.00
380851(C) 8327 2 1/4" SQUARE TUBE POST22LF $9.00 $8.00 $8.80 $10.00 $8.00 $12.50 $9.33 $8.00 $11.00
390880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF1,500SD $0.8500 $0.1000 $0.1100 $0.1100 $0.1000 $0.5000 $0.1200 $0.1000 $0.1100
400880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF600SD $1.00 $0.3000 $0.3300 $0.5400 $0.3000 $1.00 $0.3500 $0.3000 $0.5500
410880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF2,400SD $1.15 $0.3000 $0.3300 $0.1100 $0.3000 $0.5000 $0.3500 $0.3000 $0.1100
420880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)450SD $1.10 $2.00 $2.20 $2.00 $2.00 $0.7500 $2.33 $2.00 $0.2800
430880(E) 8860 WARNING LIGHTS(TYPE A)900SD $0.4500 $0.3500 $0.3900 $3.75 $0.3500 $4.25 $0.4100 $0.3500 $3.85
440642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $10,000.00 $9,500.00 $7,700.00 $7,000.00 $7,000.00 $8,500.00 $9,332.48 $12,000.00 $13,310.00
450220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $2,500.00 $1,600.00 $500.00 $2,500.00 $7,500.00 $6,999.36 $2,000.00 $3,850.00
460641 1399 MOBILIZATION1LSUM $64,467.00 $58,319.68 $34,500.00 $68,000.00 $110,578.32 $40,000.00 $32,517.86 $75,000.00 $72,486.64

Showing the first 8 bidders. The Excel and CSV downloads include all 10.