BRIDGE AND APPROACHES COUNTY ROADS (EW-141 (180TH STREET) / NS-299): EW-141, OVER TRIBUTARY TO LAFLIN CREEK 1.7 MILES WEST OF SH -76. NS-299, FROM EW-141 EXTEND NORTH NEAR CRINER . PROJECT LENGTH = 0.354 MILE
Let date Thursday, October 15, 2020
Contract 200316
J/P numbers 33067(04) District
County Grady, Mcclain
Highway
Limits BRIDGE AND APPROACHES COUNTY ROADS (EW-141 (180TH STREET) / NS-299): EW-141, OVER TRIBUTARY TO LAFLIN CREEK 1.7 MILES WEST OF SH -76. NS-299, FROM EW-141 EXTEND NORTH NEAR CRINER . PROJECT LENGTH = 0.354 MILE Project number STP-244D(071)CI
Bidders 10
# Contractor Total bid vs estimate vs low
EE Engineer's estimate $884,201
1
Treas Construction Inc Low bidder
$766,364
-13.3%
2
K & R BUILDERS, INC.
$799,991
-9.5%
+4.4%
3
RRY SERVICES LLC
$860,612
-2.7%
+12.3%
4
KLAVER CONSTRUCTION COMPANY, INC.
$875,112
-1.0%
+14.2%
5
Redlands Contracting, LLC
$902,377
+2.1%
+17.7%
6
C-P INTEGRATED SERVICES, INC.
$907,269
+2.6%
+18.4%
7
Built Right Construction, LLC
$952,695
+7.7%
+24.3%
8
Frontier Bridge, Inc.
$957,201
+8.3%
+24.9%
9
Silver Star Construction Company, Inc.
$983,600
+11.2%
+28.3%
10
HASKELL LEMON CONSTRUCTION CO.
$1,066,948
+20.7%
+39.2%
Bid tab: unit prices 46 items ExcelCSV Print
Seq Bid code Description Qty Unit Estimate
#1 Treas Construct… #2 K & R BUILDERS,… #3 RRY SERVICES LLC #4 KLAVER CONSTRUC… #5 Redlands Contra… #6 C-P INTEGRATED … #7 Built Right Con… #8 Frontier Bridge…
10 201(A) 0102
CLEARING AND GRUBBING 1 LSUM
$15,000.00
$10,250.00
$14,500.00
$15,000.00
$25,000.00
$21,000.00
$26,480.91
$5,000.00
$19,800.00
20 202(A) 0183
UNCLASSIFIED EXCAVATION 8,698 CY
$9.00
$9.00
$9.50
$8.00
$4.00
$8.00
$5.92
$10.00
$7.43
30 202(D) 0184
UNCLASSIFIED BORROW 1,506 CY
$15.00
$9.15
$10.00
$11.00
$18.00
$16.65
$13.12
$16.00
$9.90
40 221(C) 2801
TEMPORARY SILT FENCE 126 LF
$2.50
$5.00
$11.00
$6.00
$3.69
$12.00
$4.30
$4.00
$11.00
50 221(F) 0100
TEMPORARY SILT DIKE 434 LF
$15.00
$13.00
$16.50
$13.50
$12.77
$18.00
$14.90
$20.00
$16.50
60 228 4170
NYLON EROSION CONTROL MAT 3,450 SY
$15.00
$12.00
$4.40
$12.50
$28.50
$5.00
$25.25
$18.00
$4.40
70 230(A) 2806
SOLID SLAB SODDING 20,150 SY
$3.50
$2.20
$4.40
$2.40
$2.49
$4.35
$5.24
$3.00
$4.40
80 233(A) 2817
VEGETATIVE MULCHING 8.32 AC
$1,000.00
$850.00
$1,000.00
$850.00
$995.00
$2,000.00
$1,160.73
$1,000.00
$2,200.00
90 307(K) 4300
STABILIZED SUBGRADE 5,518 SY
$7.00
$5.75
$6.32
$5.95
$5.75
$6.25
$7.00
$8.00
$6.33
100 310(B) 0149
SUBGRADE, METHOD B 5,172 SY
$2.00
$3.00
$2.25
$1.25
$2.00
$5.00
$5.83
$7.00
$3.30
110 402(E) 0225
TRAFFIC BOUND SURFACE COURSE TYPE E 1,188 TON
$30.00
$27.47
$31.35
$45.00
$29.30
$48.00
$39.66
$42.00
$31.17
120 408 5774
PRIME COAT 1,849 GAL
$5.00
$4.31
$6.60
$6.00
$6.00
$6.25
$8.17
$5.00
$6.60
130 411(B) 5945
SUPERPAVE, TYPE S3(PG 64-22 OK) 1,162 TON
$85.00
$80.44
$87.50
$81.00
$79.00
$88.00
$93.44
$100.00
$86.90
140 411(C) 5960
SUPERPAVE, TYPE S4(PG 64-22 OK) 562 TON
$100.00
$99.56
$114.40
$106.00
$104.00
$116.00
$98.50
$105.00
$114.40
150 509(D) 0325
CLASS C CONCRETE 10 CY
$350.00
$585.00
$285.00
$270.00
$350.00
$310.00
$417.63
$500.00
$528.56
160 601(A) 0297
TYPE I PLAIN RIPRAP 201 TON
$50.00
$42.70
$50.50
$60.00
$39.61
$58.00
$57.16
$65.00
$57.22
170 613(A) 0492
24" R.C.PIPE CLASS III 66 LF
$85.00
$34.83
$113.00
$85.00
$44.00
$70.00
$52.36
$78.00
$92.78
180 613(B) 0689
18" CORR. GALV. STEEL PIPE 104 LF
$35.00
$20.48
$32.00
$50.00
$28.00
$45.00
$30.91
$30.00
$40.81
190 613(B) 0696
60" CORR. GALV. STEEL PIPE 106 LF
$120.00
$81.29
$83.50
$235.00
$85.00
$145.00
$80.81
$65.00
$142.73
200 613(B) 4528
28" X 20" CORR. GALV. STEEL PIPE ARCH 142 LF
$40.00
$29.30
$35.00
$60.00
$34.00
$52.00
$44.27
$40.00
$43.22
210 613(L) 4516
28" X 20" PREFAB. CULVERT END SECTION, ARCH 8 EA
$800.00
$210.63
$312.00
$400.00
$820.00
$410.00
$845.76
$250.00
$804.72
220 613(L) 5726
18" PREFAB. CULVERT END SECTION, ROUND 6 EA
$530.00
$173.69
$235.00
$400.00
$600.00
$318.00
$482.96
$525.00
$571.98
230 613(L) 5730
24" PREFAB. CULVERT END SECTION, ROUND 2 EA
$800.00
$661.07
$1,000.00
$1,000.00
$750.00
$1,125.00
$1,006.98
$1,500.00
$1,202.05
240 619(A) 0920
REMOVAL OF STRUCTURES & OBSTRUCTIONS 1 LSUM
$10,000.00
$5,000.00
$4,240.00
$4,500.00
$10,000.00
$8,500.00
$3,499.68
$5,000.00
$4,400.00
250 619(B) 4728
REMOVAL OF ASPHALT PAVEMENT 493 SY
$6.00
$3.00
$7.00
$9.00
$15.00
$8.00
$15.17
$12.00
$6.60
260 624(C) 4459
FENCE-STYLE SWF (5 BARBED WIRE) 2,550 LF
$6.00
$6.90
$7.59
$6.90
$3.75
$10.30
$5.83
$6.00
$7.59
270 624(H) 5920
(PL) GATE 1 EA
$600.00
$3,000.00
$3,300.00
$3,000.00
$500.00
$1,200.00
$874.92
$1,700.00
$3,300.00
280 629(E) 5048
REMOVE AND RESET MAILBOX 7 EA
$200.00
$50.00
$165.00
$125.00
$75.00
$350.00
$291.64
$100.00
$275.00
290 202(A) 1301
UNCLASSIFIED EXCAVATION 598 CY
$12.00
$20.00
$7.50
$10.00
$8.00
$12.00
$9.33
$12.00
$11.00
300 501(A) 1306
STRUCTURAL EXCAVATION UNCLASSIFIED 81 CY
$30.00
$20.00
$15.50
$15.00
$10.00
$42.00
$17.50
$20.00
$88.00
310 509(A) 1326
CLASS AA CONCRETE 207 CY
$600.00
$577.98
$560.00
$650.00
$654.85
$480.00
$477.12
$600.00
$739.59
320 511(A) 1332
REINFORCING STEEL 28,200 LB
$1.00
$0.9800
$0.9500
$1.05
$0.9000
$1.40
$1.05
$1.50
$1.24
330 601(B) 1353
TYPE I-A PLAIN RIPRAP 431 TON
$50.00
$47.70
$48.75
$70.00
$39.61
$58.00
$57.16
$65.00
$51.72
340 601(C) 1355
TYPE I-A FILTER BLANKET 126 TON
$40.00
$36.05
$36.50
$55.00
$28.21
$54.00
$13.71
$45.00
$39.21
350 619(D) 1397
REMOVAL OF EXISTING BRIDGE STRUCTURE 1 LSUM
$25,000.00
$5,099.50
$8,750.00
$10,000.00
$6,000.00
$18,000.00
$12,832.16
$5,000.00
$44,000.00
360 805(D) 8756
(PL)REMOVE & RESET EXISTING SIGNS 3 EA
$150.00
$125.00
$137.50
$125.00
$125.00
$145.00
$291.64
$125.00
$110.00
370 850(A) 8110
SHEET ALUMINUM SIGNS 8 SF
$25.00
$50.00
$55.00
$20.00
$50.00
$28.00
$58.33
$50.00
$22.00
380 851(C) 8327
2 1/4" SQUARE TUBE POST 22 LF
$9.00
$8.00
$8.80
$10.00
$8.00
$12.50
$9.33
$8.00
$11.00
390 880(B) 8818
CONSTRUCTION SIGNS 0 TO 6.25 SF 1,500 SD
$0.8500
$0.1000
$0.1100
$0.1100
$0.1000
$0.5000
$0.1200
$0.1000
$0.1100
400 880(B) 8821
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF 600 SD
$1.00
$0.3000
$0.3300
$0.5400
$0.3000
$1.00
$0.3500
$0.3000
$0.5500
410 880(B) 8824
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 2,400 SD
$1.15
$0.3000
$0.3300
$0.1100
$0.3000
$0.5000
$0.3500
$0.3000
$0.1100
420 880(C) 8842
CONSTRUCTION BARRICADES(TYPE III) 450 SD
$1.10
$2.00
$2.20
$2.00
$2.00
$0.7500
$2.33
$2.00
$0.2800
430 880(E) 8860
WARNING LIGHTS(TYPE A) 900 SD
$0.4500
$0.3500
$0.3900
$3.75
$0.3500
$4.25
$0.4100
$0.3500
$3.85
440 642(B) 0096
CONSTRUCTION STAKING LEVEL II 1 LSUM
$10,000.00
$9,500.00
$7,700.00
$7,000.00
$7,000.00
$8,500.00
$9,332.48
$12,000.00
$13,310.00
450 220 2800
SWPPP DOCUMENTATION AND MANAGEMENT 1 LSUM
$5,000.00
$2,500.00
$1,600.00
$500.00
$2,500.00
$7,500.00
$6,999.36
$2,000.00
$3,850.00
460 641 1399
MOBILIZATION 1 LSUM
$64,467.00
$58,319.68
$34,500.00
$68,000.00
$110,578.32
$40,000.00
$32,517.86
$75,000.00
$72,486.64
Showing the first 8 bidders. The Excel and CSV downloads include all 10.