Bid tab 200290

Let Sep 17, 2020 · Division 8 · Osage Sign up free

‹ Sep 2020 results

BRIDGE AND APPROACHES SH-99: OVER BIRCH CREEK, 3.0 MILES NORTH OF THE SH -10 JUNCTION NEAR THE HULAH WILDLIFE MANAGEMENT AREA . PROJECT LENGTH = 0.028 MILES

Let date
Thursday, September 17, 2020
Contract
200290
J/P numbers
28860(04)
District
Division 8
County
Osage
Highway
Limits
BRIDGE AND APPROACHES SH-99: OVER BIRCH CREEK, 3.0 MILES NORTH OF THE SH -10 JUNCTION NEAR THE HULAH WILDLIFE MANAGEMENT AREA . PROJECT LENGTH = 0.028 MILES
Project number
STP-257B(056)SS

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,376,904
1 BRIDGECO CONTRACTORS, INC. Low bidder $996,447 -27.6%
2 B & B BRIDGE COMPANY, LLC $1,043,852 -24.2% +4.8%
4 Treas Construction Inc $1,189,899 -13.6% +19.4%
5 Built Right Construction, LLC $1,315,066 -4.5% +32.0%
6 KLAVER CONSTRUCTION COMPANY, INC. $1,447,982 +5.2% +45.3%
7 RRY SERVICES LLC $1,563,715 +13.6% +56.9%
8 Tri Star Construction Arkansas, LLC $1,874,800 +36.2% +88.1%

Bid tab: unit prices 58 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BRIDGECO CONTRA…#2 B & B BRIDGE CO…#4 Treas Construct…#5 Built Right Con…#6 KLAVER CONSTRUC…#7 RRY SERVICES LLC#8 Tri Star Constr…
10201(A) 0102 CLEARING AND GRUBBING1LSUM $15,000.00 $15,500.00 $7,500.00 $8,925.00 $10,000.00 $25,000.00 $35,000.00 $55,135.40
20202(A) 0183 UNCLASSIFIED EXCAVATION2,804CY $15.00 $6.50 $6.50 $8.93 $15.00 $11.79 $15.00 $29.55
30202(D) 0184 UNCLASSIFIED BORROW1,789CY $18.00 $8.75 $14.00 $16.01 $15.00 $13.34 $28.00 $28.02
40205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $15,000.00 $6,500.00 $7,500.00 $7,875.00 $10,000.00 $7,695.07 $7,000.00 $38,796.65
50221(C) 2801 TEMPORARY SILT FENCE865LF $2.00 $3.99 $2.99 $3.14 $5.00 $3.99 $3.99 $5.40
60221(D) 2803 TEMPORARY SEDIMENT FILTER3EA $240.00 $550.00 $425.00 $446.25 $600.00 $598.00 $598.00 $812.30
70221(F) 0100 TEMPORARY SILT DIKE42LF $10.00 $22.50 $18.50 $19.43 $32.00 $29.98 $29.98 $40.70
80230(A) 2806 SOLID SLAB SODDING7,189SY $5.00 $4.50 $3.90 $4.09 $5.00 $4.29 $4.50 $5.85
90232(A) 2813 SEEDING METHOD A2AC $500.00 $2,150.00 $1,750.00 $1,837.50 $3,000.00 $2,985.00 $2,985.00 $4,054.75
100233(A) 2817 VEGETATIVE MULCHING2AC $600.00 $2,150.00 $1,750.00 $1,837.50 $3,000.00 $2,985.00 $2,985.00 $4,054.75
110241 2832 MOWING7AC $65.00 $475.00 $299.00 $313.95 $1,000.00 $455.00 $455.00 $618.05
120303(A) 2100 AGGREGATE BASE TYPE A260CY $50.00 $81.30 $56.00 $78.75 $75.00 $65.37 $100.00 $67.90
130310(B) 0149 SUBGRADE, METHOD B889SY $5.00 $8.00 $2.50 $4.73 $3.00 $3.83 $3.00 $2.05
140325 5271 SEPARATOR FABRIC931SY $5.00 $9.02 $7.50 $5.25 $4.00 $7.73 $6.50 $9.00
150402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E80TON $30.00 $36.15 $28.00 $34.65 $45.00 $31.72 $33.00 $55.45
160407(B) 0250 TACK COAT391GAL $3.00 $3.15 $3.00 $2.10 $5.00 $3.00 $3.25 $8.25
170408 5774 PRIME COAT998GAL $5.00 $4.25 $4.00 $13.13 $6.00 $4.00 $4.00 $9.10
180411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)476TON $90.00 $115.05 $98.00 $236.25 $120.00 $98.00 $106.00 $103.62
190411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)215TON $105.00 $130.70 $99.00 $294.00 $125.00 $99.00 $108.00 $115.05
200501(G) 6315 CLSM BACKFILL4CY $400.00 $220.00 $200.00 $421.52 $300.00 $400.00 $200.00 $136.05
210601(A) 0297 TYPE I PLAIN RIPRAP77TON $40.00 $50.15 $48.00 $45.52 $65.00 $51.78 $60.00 $83.70
220601(B) 0536 TYPE I-A PLAIN RIPRAP105TON $50.00 $50.15 $48.00 $45.52 $65.00 $51.78 $60.00 $83.70
230601(C) 0538 TYPE I-A FILTER BLANKET35TON $30.00 $42.75 $28.00 $33.64 $45.00 $38.45 $40.00 $74.20
240611(G) 5705 INLET CDI RCP DES. 22EA $3,000.00 $2,950.00 $2,039.00 $4,200.00 $3,700.00 $6,150.00 $4,000.00 $8,001.94
250611(H) 5790 ADD'L DEPTH IN INLET CDI RCP DES. 28VF $250.00 $250.00 $500.00 $315.00 $4,500.00 $650.00 $400.00 $1,727.35
260613(A) 0492 24" R.C.PIPE CLASS III230LF $85.00 $85.84 $85.00 $68.25 $85.00 $81.26 $95.00 $166.90
270613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND1EA $800.00 $2,100.00 $750.00 $840.00 $910.00 $2,968.00 $825.00 $1,372.36
280619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $10,000.00 $5,500.00 $8,500.00 $3,675.00 $20,000.00 $9,904.00 $25,000.00 $30,858.73
290619(B) 0291 REMOVAL OF HEADWALL2EA $500.00 $1,200.00 $1,000.00 $1,575.00 $2,500.00 $3,000.00 $6,700.00 $8,711.70
300619(B) 4725 REMOVAL OF FENCE1,329LF $2.00 $2.50 $1.00 $1.05 $2.50 $1.00 $3.25 $1.35
310619(B) 4728 REMOVAL OF ASPHALT PAVEMENT400SY $4.00 $8.00 $5.50 $10.50 $12.00 $50.00 $12.00 $11.60
320619(C) 0924 SAWING PAVEMENT48LF $10.00 $10.00 $5.00 $15.75 $15.00 $100.00 $6.00 $33.85
330624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)1,358LF $5.00 $6.50 $6.00 $6.30 $7.50 $8.00 $8.00 $8.16
340202(A) 1301 UNCLASSIFIED EXCAVATION1,330CY $20.00 $6.00 $7.00 $5.25 $40.00 $14.45 $16.00 $27.07
350501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED345CY $30.00 $14.00 $35.00 $36.75 $35.00 $20.00 $25.00 $44.63
360509(A) 1326 CLASS AA CONCRETE793.5CY $800.00 $450.00 $560.00 $577.35 $550.00 $745.70 $900.00 $587.30
370511(A) 1332 REINFORCING STEEL136,710LB $1.20 $1.03 $1.00 $1.06 $1.55 $1.00 $1.10 $1.25
380619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $40,000.00 $35,000.00 $30,000.00 $10,500.00 $15,000.00 $45,000.00 $45,000.00 $91,684.40
390823 8478 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM140SD $150.00 $78.00 $75.00 $78.75 $78.00 $75.00 $81.00 $101.90
400856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)4,000LF $1.50 $1.09 $1.05 $1.10 $2.00 $1.05 $1.13 $1.45
410857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)500LF $0.5000 $1.04 $1.00 $1.05 $2.00 $1.00 $1.08 $1.35
420857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)500LF $0.7500 $1.03 $1.00 $1.05 $3.00 $1.00 $1.08 $1.35
430857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)4,000LF $0.5000 $0.2700 $0.2500 $0.2600 $2.00 $0.2500 $0.2700 $0.3500
440870(A) 8485 SAND FILLED IMPACT ATTENUATION MODULE380SD $3.00 $5.20 $5.00 $5.25 $15.00 $5.00 $5.40 $6.80
450877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER1,200LF $25.00 $26.00 $21.00 $25.20 $20.00 $38.00 $60.00 $32.62
460877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER1,400LF $7.00 $2.75 $4.00 $2.10 $1.00 $7.00 $3.00 $2.70
470880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF1,720SD $1.00 $0.5200 $0.5000 $0.5300 $0.2000 $0.5000 $0.5400 $0.7000
480880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF1,280SD $1.80 $0.1100 $0.1000 $1.05 $0.2000 $0.1000 $0.1100 $0.1500
490880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF1,200SD $2.00 $5.20 $5.00 $5.25 $3.25 $5.00 $5.40 $6.80
500880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)280SD $2.00 $0.1200 $0.1000 $0.1100 $3.25 $0.1000 $0.1100 $0.1500
510880(C) 8848 WING BARRICADES480SD $2.00 $2.52 $2.50 $2.63 $0.2000 $2.50 $2.70 $3.40
520880(D) 8854 VERTICAL PANELS825SD $1.00 $0.2700 $0.2500 $0.2600 $0.5000 $0.2500 $0.2700 $0.3500
530880(E) 8860 WARNING LIGHTS(TYPE A)1,520SD $0.5000 $0.2700 $0.2500 $0.2600 $0.3000 $0.2500 $0.2700 $0.3500
540880(F) 8878 DRUMS840SD $1.00 $1.04 $1.00 $1.05 $1.00 $1.00 $1.08 $1.35
550642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $15,000.00 $8,750.00 $7,500.00 $9,030.00 $10,000.00 $6,600.00 $5,720.00 $11,683.95
560220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $10,000.00 $3,500.00 $2,000.00 $2,625.00 $3,500.00 $6,500.00 $1,275.00 $13,011.92
570640(A) 1398 FIELD OFFICE1EA $10,000.00 $7,000.00 $3,000.00 $2,000.00 $10,000.00 $4,500.00 $3,000.00 $312,227.28
580641 1399 MOBILIZATION1LSUM $81,500.00 $68,000.00 $79,400.00 $82,442.47 $100,000.00 $197,450.39 $97,500.00 $104,000.00