| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$32,000.00 |
$42,400.00 |
$62,000.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 23,771 | CY |
$7.25 |
$6.65 |
$6.50 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,116 | CY |
$11.00 |
$10.60 |
$12.00 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$64,500.00 |
$53,000.00 |
$50,000.00 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 16,915 | LF |
$3.00 |
$2.65 |
$2.48 |
| 60 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,260 | LF |
$15.00 |
$16.85 |
$15.88 |
| 70 | 230(A) 2806 |
SOLID SLAB SODDING | 85,350 | SY |
$5.00 |
$3.25 |
$2.95 |
| 80 | 233(A) 2817 |
VEGETATIVE MULCHING | 18 | AC |
$1,750.00 |
$2,115.00 |
$1,995.00 |
| 90 | 241 2832 |
MOWING | 36 | AC |
$150.00 |
$154.00 |
$145.00 |
| 100 | 307(K) 4300 |
STABILIZED SUBGRADE | 29,579 | SY |
$8.00 |
$7.70 |
$6.55 |
| 110 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,264 | TON |
$65.00 |
$49.80 |
$64.00 |
| 120 | 407(B) 0250 |
TACK COAT | 14,060 | GAL |
$3.25 |
$3.75 |
$2.30 |
| 130 | 408 5774 |
PRIME COAT | 19,455 | GAL |
$5.00 |
$3.60 |
$3.00 |
| 140 | 409(A) 4242 |
FABRIC REINFORCEMENT | 10,267 | SY |
$2.50 |
$2.35 |
$3.75 |
| 150 | 409(B) 4268 |
BITUMINOUS BINDER | 2,567 | GAL |
$3.25 |
$3.80 |
$4.00 |
| 160 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 5,823 | TON |
$90.00 |
$103.50 |
$110.00 |
| 170 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 20,585 | TON |
$80.00 |
$89.35 |
$105.00 |
| 180 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 4,482 | TON |
$105.00 |
$114.00 |
$119.00 |
| 190 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,150 | TON |
$95.00 |
$95.55 |
$111.00 |
| 200 | 412 5267 |
COLD MILLING PAVEMENT | 3,179 | SY |
$5.00 |
$4.05 |
$2.00 |
| 210 | 413(A) 4870 |
RUMBLE STRIP-CENTERLINE HMA-CON | 13,620 | LF |
$0.2000 |
$0.3200 |
$0.4600 |
| 220 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 27,961 | LF |
$0.1800 |
$0.2000 |
$0.3400 |
| 230 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 992 | CY |
$25.75 |
$8.50 |
$8.00 |
| 240 | 509(B) 0321 |
CLASS A CONCRETE | 139 | CY |
$700.00 |
$858.60 |
$810.00 |
| 250 | 509(D) 0325 |
CLASS C CONCRETE | 25 | CY |
$550.00 |
$339.20 |
$320.00 |
| 260 | 511(A) 0332 |
REINFORCING STEEL | 12,365 | LB |
$1.10 |
$1.35 |
$1.28 |
| 270 | 609(B) 1526 |
2'-8" COMB. CURB & GUTTER (8" BARRIER) | 54 | LF |
$43.00 |
$44.50 |
$42.00 |
| 280 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 48 | LF |
$80.00 |
$95.40 |
$114.65 |
| 290 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 182 | LF |
$70.00 |
$82.65 |
$58.75 |
| 300 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 210 | LF |
$110.00 |
$107.60 |
$87.00 |
| 310 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 116 | LF |
$165.00 |
$156.90 |
$91.55 |
| 320 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 304 | LF |
$170.00 |
$167.00 |
$129.40 |
| 330 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 18 | LF |
$50.00 |
$47.70 |
$25.00 |
| 340 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 1,023 | LF |
$25.00 |
$21.20 |
$30.00 |
| 350 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 341 | LF |
$25.00 |
$21.20 |
$30.00 |
| 360 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,700.00 |
$4,240.00 |
$2,650.00 |
| 370 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,000.00 |
$2,650.00 |
$1,200.00 |
| 380 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 8 | EA |
$1,500.00 |
$2,252.00 |
$2,125.00 |
| 390 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 4 | EA |
$3,000.00 |
$2,910.00 |
$2,745.00 |
| 400 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 4 | EA |
$4,000.00 |
$4,399.00 |
$4,150.00 |
| 410 | 613(M) 7202 |
TYPE BB6 CULVERT END TREATMENT | 2 | EA |
$5,200.00 |
$4,494.00 |
$4,240.00 |
| 420 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 3 | EA |
$800.00 |
$795.00 |
$850.00 |
| 430 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$60,000.00 |
$55,120.00 |
$35,000.00 |
| 440 | 619(B) 0291 |
REMOVAL OF HEADWALL | 16 | EA |
$1,000.00 |
$1,272.00 |
$1,200.00 |
| 450 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 268 | LF |
$13.00 |
$11.65 |
$21.00 |
| 460 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 25,573 | SY |
$7.00 |
$4.25 |
$7.50 |
| 470 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 52 | SY |
$11.00 |
$9.54 |
$22.00 |
| 480 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 19 | SY |
$15.00 |
$11.65 |
$20.00 |
| 490 | 619(C) 0924 |
SAWING PAVEMENT | 27,529 | LF |
$3.35 |
$1.85 |
$3.00 |
| 500 | 624(A) 4281 |
FENCE-STYLE WWF | 257 | LF |
$9.00 |
$7.42 |
$8.00 |
| 510 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 2,119 | LF |
$5.80 |
$5.30 |
$5.35 |
| 520 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 7,927 | LF |
$7.25 |
$5.57 |
$5.50 |
| 530 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 3 | EA |
$150.00 |
$106.00 |
$225.00 |
| 540 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 3 | EA |
$240.00 |
$212.00 |
$250.00 |
| 550 | 629(C) 4960 |
MAILBOX | 18 | EA |
$50.00 |
$53.00 |
$30.00 |
| 560 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 18 | EA |
$38.00 |
$26.50 |
$40.00 |
| 570 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 360 | CY |
$11.00 |
$12.75 |
$12.00 |
| 580 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 164 | CY |
$25.00 |
$47.70 |
$45.00 |
| 590 | 508 6335 |
REMOVAL OF CULVERT END | 2 | EA |
$7,500.00 |
$10,070.00 |
$9,500.00 |
| 600 | 509(A) 1326 |
CLASS AA CONCRETE | 277.8 | CY |
$700.00 |
$540.60 |
$510.00 |
| 610 | 511(A) 1332 |
REINFORCING STEEL | 38,290 | LB |
$1.10 |
$1.25 |
$1.18 |
| 620 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 540 | CY |
$11.00 |
$12.70 |
$12.00 |
| 630 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 84 | CY |
$25.00 |
$47.70 |
$45.00 |
| 640 | 508 6335 |
REMOVAL OF CULVERT END | 2 | EA |
$7,000.00 |
$7,420.00 |
$7,000.00 |
| 650 | 509(A) 1326 |
CLASS AA CONCRETE | 146.4 | CY |
$700.00 |
$540.60 |
$510.00 |
| 660 | 511(A) 1332 |
REINFORCING STEEL | 20,210 | LB |
$1.10 |
$1.35 |
$1.25 |
| 670 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 250 | DAY |
$490.00 |
$490.00 |
$490.00 |
| 680 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 98,400 | LF |
$0.7000 |
$0.8800 |
$1.00 |
| 690 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 25,000 | LF |
$0.1900 |
$0.2800 |
$0.5000 |
| 700 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 40 | SD |
$26.60 |
$26.50 |
$8.00 |
| 710 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,670 | SD |
$0.2700 |
$1.06 |
$0.0200 |
| 720 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,040 | SD |
$0.5100 |
$1.06 |
$1.00 |
| 730 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,840 | SD |
$1.32 |
$3.20 |
$3.00 |
| 740 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,480 | SD |
$0.7400 |
$5.30 |
$2.50 |
| 750 | 880(C) 8848 |
WING BARRICADES | 1,000 | SD |
$2.71 |
$1.06 |
$0.0200 |
| 760 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,900 | SD |
$0.4000 |
$2.65 |
$0.3000 |
| 770 | 880(F) 8878 |
DRUMS | 3,550 | SD |
$0.2400 |
$0.5300 |
$0.7500 |
| 780 | 880(G) 8890 |
CHANNELIZER CONES | 13,330 | SD |
$0.2300 |
$0.8000 |
$0.0500 |
| 790 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 290 | SD |
$11.43 |
$21.20 |
$20.00 |
| 800 | 804(A) 2915 |
STRUCTURAL CONCRETE | 3.14 | CY |
$912.92 |
$530.00 |
$350.00 |
| 810 | 804(B) 2916 |
REINFORCING STEEL | 474 | LB |
$1.98 |
$2.15 |
$2.25 |
| 820 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 59 | EA |
$72.91 |
$79.50 |
$95.00 |
| 830 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 11 | EA |
$235.42 |
$239.50 |
$125.00 |
| 840 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 661.99 | SF |
$23.86 |
$19.10 |
$28.00 |
| 850 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 35 | SF |
$45.00 |
$63.60 |
$32.00 |
| 860 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 43 | LF |
$35.00 |
$29.70 |
$26.00 |
| 870 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 105 | LF |
$18.01 |
$21.20 |
$19.00 |
| 880 | 851(B) 3219 |
3 1/2"@9.11 GALV.STEEL PIPE POST | 74 | LF |
$30.00 |
$23.35 |
$22.00 |
| 890 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 1,113.5 | LF |
$6.35 |
$8.50 |
$7.00 |
| 900 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 52,186 | LF |
$0.7000 |
$0.7200 |
$0.6600 |
| 910 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 537 | LF |
$3.64 |
$2.15 |
$4.00 |
| 920 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 3 | EA |
$508.83 |
$1,590.00 |
$1,300.00 |
| 930 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 25,000 | LF |
$0.1900 |
$0.2100 |
$0.5000 |
| 940 | 890 7700 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$4,000.00 |
$10,600.00 |
$15,000.00 |
| 950 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$35,000.00 |
$59,255.00 |
$45,900.00 |
| 960 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$16,350.00 |
$8,500.00 |
| 970 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$305,100.00 |
$396,000.00 |
$333,000.00 |