| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$9,300.00 |
$15,095.30 |
$41,145.00 |
$74,500.00 |
$140,000.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 15,458 | CY |
$8.00 |
$7.30 |
$8.88 |
$7.95 |
$8.19 |
$9.35 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 125,707 | CY |
$11.00 |
$8.45 |
$10.46 |
$10.30 |
$11.40 |
$11.25 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$100,000.00 |
$60,000.00 |
$51,984.56 |
$115,030.00 |
$110,000.00 |
$150,000.00 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,659 | LF |
$3.00 |
$1.59 |
$1.55 |
$1.55 |
$1.65 |
$1.65 |
| 60 | 221(F) 0100 |
TEMPORARY SILT DIKE | 259 | LF |
$15.00 |
$7.10 |
$6.96 |
$7.00 |
$7.40 |
$8.00 |
| 70 | 221(K) 0600 |
TEMPORARY FIBER LOG | 7,034 | LF |
$5.00 |
$5.31 |
$5.20 |
$5.25 |
$5.50 |
$5.20 |
| 80 | 230(A) 2806 |
SOLID SLAB SODDING | 55,440 | SY |
$5.00 |
$1.54 |
$1.51 |
$1.50 |
$1.73 |
$1.64 |
| 90 | 233(A) 2817 |
VEGETATIVE MULCHING | 11.5 | AC |
$1,750.00 |
$532.50 |
$521.00 |
$524.00 |
$500.00 |
$550.00 |
| 100 | 241 2832 |
MOWING | 30.4 | AC |
$125.00 |
$69.23 |
$67.73 |
$68.10 |
$65.00 |
$72.00 |
| 110 | 307(K) 4300 |
STABILIZED SUBGRADE | 13,207.6 | SY |
$7.50 |
$5.90 |
$6.25 |
$7.45 |
$7.70 |
$7.00 |
| 120 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 160 | TON |
$50.00 |
$47.00 |
$37.75 |
$49.70 |
$55.00 |
$40.00 |
| 130 | 407(B) 0250 |
TACK COAT | 1,895 | GAL |
$4.50 |
$3.91 |
$3.82 |
$3.85 |
$3.67 |
$4.10 |
| 140 | 408 5774 |
PRIME COAT | 5,204.3 | GAL |
$5.00 |
$0.5000 |
$11.21 |
$11.30 |
$10.76 |
$11.50 |
| 150 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,980 | TON |
$80.00 |
$84.45 |
$82.63 |
$83.10 |
$90.00 |
$89.00 |
| 160 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,473 | TON |
$95.00 |
$93.82 |
$91.79 |
$92.30 |
$100.00 |
$99.00 |
| 170 | 509(D) 0325 |
CLASS C CONCRETE | 57.5 | CY |
$500.00 |
$700.00 |
$342.29 |
$350.00 |
$385.00 |
$375.00 |
| 180 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$2,800.00 |
$3,750.00 |
$2,969.70 |
$5,754.00 |
$2,600.00 |
$3,000.00 |
| 190 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 63 | LF |
$35.00 |
$56.00 |
$48.97 |
$57.00 |
$40.00 |
$45.00 |
| 200 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 36 | LF |
$38.00 |
$63.00 |
$60.44 |
$66.50 |
$50.00 |
$53.00 |
| 210 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 125 | LF |
$55.00 |
$96.00 |
$86.24 |
$99.90 |
$62.00 |
$85.00 |
| 220 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,000.00 |
$1,100.00 |
$489.74 |
$1,152.00 |
$1,100.00 |
$250.00 |
| 230 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,200.00 |
$1,200.00 |
$567.89 |
$1,422.00 |
$1,300.00 |
$375.00 |
| 240 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,800.00 |
$2,000.00 |
$1,047.21 |
$2,422.00 |
$2,000.00 |
$900.00 |
| 250 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$15,000.00 |
$5,210.00 |
$25,545.00 |
$11,000.00 |
$4,000.00 |
| 260 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 9,636 | SY |
$5.00 |
$5.00 |
$2.61 |
$6.20 |
$7.50 |
$6.30 |
| 270 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 4,226 | LF |
$5.00 |
$4.00 |
$3.13 |
$4.20 |
$5.50 |
$2.00 |
| 280 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 625 | LF |
$25.00 |
$25.29 |
$25.01 |
$21.00 |
$26.40 |
$32.00 |
| 290 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,550.00 |
$2,982.00 |
$2,605.00 |
$2,987.00 |
$3,080.00 |
$3,800.00 |
| 300 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,200.00 |
$2,343.00 |
$2,188.20 |
$3,118.00 |
$2,420.00 |
$3,500.00 |
| 310 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 4,810 | LF |
$6.50 |
$5.59 |
$5.47 |
$5.50 |
$5.78 |
$5.80 |
| 320 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 1,013 | LF |
$7.50 |
$5.80 |
$5.68 |
$5.70 |
$6.60 |
$6.10 |
| 330 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,690 | CY |
$20.00 |
$17.00 |
$9.27 |
$7.95 |
$10.00 |
$15.00 |
| 340 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 270 | CY |
$25.00 |
$25.00 |
$37.77 |
$35.20 |
$40.00 |
$20.00 |
| 350 | 509(A) 1326 |
CLASS AA CONCRETE | 576.3 | CY |
$550.00 |
$450.00 |
$438.42 |
$418.00 |
$545.00 |
$475.00 |
| 360 | 511(A) 1332 |
REINFORCING STEEL | 104,620 | LB |
$1.00 |
$1.00 |
$1.17 |
$1.15 |
$1.15 |
$1.20 |
| 370 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$13,000.00 |
$19,745.90 |
$28,010.00 |
$20,000.00 |
$7,500.00 |
| 380 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 85 | CY |
$35.00 |
$32.00 |
$23.38 |
$37.20 |
$11.70 |
$20.00 |
| 390 | 501(G) 6309 |
CLSM BACKFILL | 189.8 | CY |
$200.00 |
$175.00 |
$141.69 |
$149.00 |
$182.50 |
$180.00 |
| 400 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,170.2 | LF |
$250.00 |
$220.00 |
$213.15 |
$221.00 |
$228.00 |
$225.00 |
| 410 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$300.00 |
$270.00 |
$248.29 |
$243.00 |
$265.00 |
$225.00 |
| 420 | 504(B) 1305 |
SAW-CUT GROOVING | 1,260.3 | SY |
$5.00 |
$3.83 |
$3.75 |
$3.75 |
$4.00 |
$4.00 |
| 430 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 567 | LF |
$95.00 |
$95.00 |
$109.68 |
$106.50 |
$96.00 |
$80.00 |
| 440 | 506(A) 1322 |
STRUCTURAL STEEL | 1,190 | LB |
$4.00 |
$3.00 |
$3.60 |
$4.15 |
$3.00 |
$3.75 |
| 450 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$1,000.00 |
$800.00 |
$658.70 |
$792.00 |
$540.00 |
$550.00 |
| 460 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,000.00 |
$2,600.00 |
$2,105.63 |
$2,769.00 |
$2,100.00 |
$2,150.00 |
| 470 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$600.00 |
$500.00 |
$502.73 |
$549.50 |
$725.00 |
$400.00 |
| 480 | 509(A) 1326 |
CLASS AA CONCRETE | 309.3 | CY |
$650.00 |
$670.00 |
$719.71 |
$660.00 |
$670.00 |
$1,000.00 |
| 490 | 509(B) 1328 |
CLASS A CONCRETE | 179.2 | CY |
$650.00 |
$750.00 |
$670.12 |
$594.50 |
$699.00 |
$1,000.00 |
| 500 | 510(C) 6138 |
SLOPE WALL (5") | 960.3 | SY |
$250.00 |
$105.00 |
$106.48 |
$131.00 |
$115.00 |
$225.00 |
| 510 | 511(A) 1332 |
REINFORCING STEEL | 1,500 | LB |
$1.00 |
$1.10 |
$0.9900 |
$2.85 |
$1.40 |
$1.10 |
| 520 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 125,710 | LB |
$1.10 |
$1.20 |
$1.12 |
$1.40 |
$1.31 |
$1.30 |
| 530 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 747 | LF |
$40.00 |
$40.00 |
$38.05 |
$46.50 |
$38.50 |
$35.00 |
| 540 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 747 | LF |
$20.00 |
$21.00 |
$18.62 |
$17.10 |
$16.50 |
$20.00 |
| 550 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 560 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,042.2 | SY |
$4.50 |
$4.05 |
$3.96 |
$4.00 |
$4.20 |
$5.00 |
| 570 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 148 | LF |
$1,000.00 |
$940.00 |
$1,197.41 |
$1,043.00 |
$905.00 |
$850.00 |
| 580 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$4,000.00 |
$1,757.25 |
$2,269.30 |
$5,597.00 |
$3,500.00 |
$3,000.00 |
| 590 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163.1 | LF |
$5.00 |
$4.26 |
$4.17 |
$4.20 |
$4.00 |
$3.50 |
| 600 | 523(B) 6560 |
SEALER RESIN | 1.9 | GAL |
$150.00 |
$213.00 |
$208.40 |
$209.50 |
$200.00 |
$200.00 |
| 610 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 180 | LF |
$35.00 |
$30.00 |
$23.30 |
$38.90 |
$28.00 |
$24.00 |
| 620 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 76 | LF |
$35.00 |
$30.00 |
$29.63 |
$27.10 |
$30.00 |
$24.00 |
| 630 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$80,000.00 |
$90,000.00 |
$224,548.85 |
$104,510.00 |
$83,000.00 |
$95,000.00 |
| 640 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 30 | DAY |
$300.00 |
$300.00 |
$300.00 |
$300.00 |
$300.00 |
$300.00 |
| 650 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 21,700 | SD |
$0.2500 |
$0.0500 |
$0.0500 |
$0.0200 |
$0.0600 |
$0.0700 |
| 660 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,100 | SD |
$1.00 |
$0.1100 |
$0.1000 |
$1.80 |
$0.1100 |
$0.1100 |
| 670 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,450 | SD |
$1.50 |
$0.2700 |
$0.2600 |
$1.80 |
$0.2800 |
$0.2800 |
| 680 | 880(B) 8827 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 1,575 | SD |
$2.00 |
$0.5300 |
$0.5200 |
$1.80 |
$0.5500 |
$0.5400 |
| 690 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,575 | SD |
$1.50 |
$0.2700 |
$0.2600 |
$6.30 |
$0.2800 |
$0.2800 |
| 700 | 880(C) 8848 |
WING BARRICADES | 1,050 | SD |
$1.50 |
$0.0500 |
$0.0500 |
$0.0200 |
$0.0600 |
$0.0600 |
| 710 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 5,600 | SD |
$0.7500 |
$0.2700 |
$0.2600 |
$0.6300 |
$0.2800 |
$0.2800 |
| 720 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 378 | SD |
$15.00 |
$10.65 |
$10.42 |
$14.70 |
$11.00 |
$11.00 |
| 730 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 18 | SF |
$30.00 |
$26.63 |
$26.05 |
$47.20 |
$27.50 |
$30.00 |
| 740 | 851(C) 8324 |
2" SQUARE TUBE POST | 24 | LF |
$15.00 |
$10.65 |
$10.42 |
$8.40 |
$11.00 |
$15.00 |
| 750 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 22 | EA |
$16.50 |
$21.30 |
$20.84 |
$14.20 |
$22.00 |
$22.00 |
| 760 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 9,407 | LF |
$2.00 |
$0.6400 |
$0.6300 |
$0.7300 |
$0.6600 |
$0.6100 |
| 770 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$13,099.50 |
$17,630.00 |
$43,275.00 |
$18,000.00 |
$10,000.00 |
| 780 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$2,750.00 |
$5,503.00 |
$5,000.00 |
$3,000.00 |
| 790 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$263,000.00 |
$243,750.00 |
$253,301.56 |
$399,921.98 |
$265,000.00 |
$315,000.00 |