| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$6,000.00 |
$17,850.00 |
$22,400.00 |
$7,500.00 |
$22,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,300 | CY |
$12.00 |
$22.50 |
$17.50 |
$15.00 |
$15.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$8,000.00 |
$5,186.00 |
$2,500.00 |
$6,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,171 | LF |
$1.30 |
$2.99 |
$2.00 |
$2.99 |
$2.99 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 56 | LF |
$15.00 |
$34.00 |
$6.25 |
$34.00 |
$34.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 1,149 | SY |
$6.00 |
$6.95 |
$3.40 |
$6.95 |
$6.95 |
| 7 | 232(B) 2814 |
SEEDING METHOD B | 0.69 | AC |
$2,500.00 |
$5,950.00 |
$7,500.00 |
$5,950.00 |
$5,950.00 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.69 | AC |
$400.00 |
$5,950.00 |
$7,500.00 |
$5,950.00 |
$5,950.00 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,400 | TON |
$45.00 |
$27.00 |
$25.00 |
$22.00 |
$38.00 |
| 10 | 509(D) 0325 |
CLASS C CONCRETE | 12 | CY |
$300.00 |
$150.00 |
$438.75 |
$300.00 |
$300.00 |
| 11 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 4 | TON |
$100.00 |
$80.00 |
$60.50 |
$50.00 |
$85.00 |
| 12 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 2 | TON |
$80.00 |
$80.00 |
$78.40 |
$50.00 |
$100.00 |
| 13 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 48 | LF |
$30.00 |
$50.00 |
$56.70 |
$45.00 |
$50.00 |
| 14 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$850.00 |
$300.00 |
$294.50 |
$450.00 |
$375.00 |
| 15 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$8,250.00 |
$12,606.00 |
$5,000.00 |
$3,000.00 |
| 16 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 16 | LF |
$50.00 |
$10.00 |
$82.00 |
$65.00 |
$70.00 |
| 17 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 1 | EA |
$1,200.00 |
$1,500.00 |
$3,782.00 |
$3,000.00 |
$3,000.00 |
| 18 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 160 | CY |
$20.00 |
$50.00 |
$15.15 |
$40.00 |
$25.00 |
| 19 | 501(G) 6309 |
CLSM BACKFILL | 126 | CY |
$170.00 |
$175.00 |
$111.00 |
$125.00 |
$175.00 |
| 20 | 508 6359 |
PRECAST ARCH CULVERT | 60 | LF |
$4,500.00 |
$5,000.00 |
$5,967.00 |
$7,350.00 |
$9,000.00 |
| 21 | 509(A) 1326 |
CLASS AA CONCRETE | 7 | CY |
$900.00 |
$500.00 |
$1,400.00 |
$520.00 |
$1,000.00 |
| 22 | 509(B) 1328 |
CLASS A CONCRETE | 122 | CY |
$700.00 |
$1,150.00 |
$1,075.00 |
$705.00 |
$700.00 |
| 23 | 511(A) 1332 |
REINFORCING STEEL | 15,648 | LB |
$1.10 |
$0.7500 |
$1.00 |
$1.00 |
$1.25 |
| 24 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 1,132 | LB |
$2.00 |
$0.0100 |
$1.60 |
$2.00 |
$3.00 |
| 25 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 59 | SY |
$4.00 |
$10.00 |
$4.55 |
$10.00 |
$20.00 |
| 26 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,178 | TON |
$40.00 |
$34.00 |
$47.85 |
$36.00 |
$43.00 |
| 27 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 180 | TON |
$32.00 |
$30.00 |
$78.40 |
$30.00 |
$35.00 |
| 28 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 104 | LF |
$40.00 |
$65.00 |
$14.40 |
$50.00 |
$35.00 |
| 29 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 120 | LF |
$20.00 |
$65.00 |
$14.05 |
$45.00 |
$35.00 |
| 30 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$12,250.00 |
$14,941.50 |
$10,000.00 |
$20,000.00 |
| 31 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 462.5 | LF |
$20.00 |
$41.72 |
$82.00 |
$41.72 |
$65.00 |
| 32 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,250.00 |
$4,273.00 |
$3,782.00 |
$4,273.00 |
$3,000.00 |
| 33 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,000.00 |
$2,450.00 |
$3,025.00 |
$2,450.00 |
$4,400.00 |
| 34 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,000.00 |
$4,500.00 |
$9,705.00 |
$4,500.00 |
$5,790.00 |
| 35 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$1,250.00 |
$1,000.00 |
$4,415.00 |
$3,000.00 |
$1,275.00 |
| 36 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$42,200.00 |
$30,000.00 |
$28,000.00 |
$87,050.00 |
$77,000.00 |