| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$8,000.00 |
$4,000.00 |
$7,500.00 |
$5,775.00 |
$34,167.00 |
$10,000.00 |
$12,500.00 |
$11,344.35 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 5,798 | CY |
$15.00 |
$8.00 |
$8.00 |
$8.00 |
$5.25 |
$17.69 |
$12.00 |
$14.00 |
$13.00 |
| 30 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$8,000.00 |
$8,000.00 |
$10,000.00 |
$5,000.00 |
$5,932.50 |
$13,330.00 |
$25,000.00 |
$8,725.00 |
$5,000.00 |
| 40 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,108 | LF |
$2.70 |
$2.70 |
$2.00 |
$2.49 |
$2.62 |
$2.50 |
$2.75 |
$2.49 |
$3.00 |
| 50 | 221(F) 0100 |
TEMPORARY SILT DIKE | 140 | LF |
$11.00 |
$9.20 |
$13.00 |
$8.50 |
$8.92 |
$19.00 |
$9.35 |
$8.50 |
$14.00 |
| 60 | 230(A) 2806 |
SOLID SLAB SODDING | 12,511 | SY |
$5.50 |
$4.95 |
$2.85 |
$4.95 |
$3.68 |
$4.13 |
$5.45 |
$4.95 |
$7.00 |
| 70 | 325 5271 |
SEPARATOR FABRIC | 2,956 | SY |
$1.70 |
$2.00 |
$2.60 |
$2.50 |
$1.79 |
$2.60 |
$3.00 |
$2.50 |
$1.32 |
| 80 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 989 | TON |
$30.00 |
$26.00 |
$28.00 |
$22.50 |
$20.95 |
$38.87 |
$45.00 |
$24.00 |
$30.00 |
| 90 | 613(L) 5722 |
12" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$500.00 |
$375.00 |
$385.00 |
$250.00 |
$161.87 |
$980.00 |
$1,000.00 |
$250.00 |
$1,453.62 |
| 100 | 616(I) 0125 |
12" STEEL CASING | 32 | LF |
$75.00 |
$80.00 |
$60.00 |
$100.00 |
$186.64 |
$185.00 |
$50.00 |
$100.00 |
$145.36 |
| 110 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$1,000.00 |
$12,000.00 |
$7,500.00 |
$5,512.50 |
$34,167.00 |
$8,000.00 |
$7,500.00 |
$7,500.00 |
| 120 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,312 | CY |
$8.00 |
$8.00 |
$8.00 |
$15.00 |
$5.25 |
$17.69 |
$15.00 |
$14.00 |
$12.00 |
| 130 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 246 | CY |
$23.00 |
$15.00 |
$23.00 |
$10.00 |
$31.50 |
$17.00 |
$18.00 |
$61.00 |
$50.00 |
| 140 | 509(A) 1326 |
CLASS AA CONCRETE | 482 | CY |
$800.00 |
$525.00 |
$512.00 |
$545.00 |
$620.60 |
$370.99 |
$600.00 |
$725.00 |
$800.00 |
| 150 | 511(A) 1332 |
REINFORCING STEEL | 83,067 | LB |
$1.15 |
$1.20 |
$1.50 |
$0.7600 |
$1.34 |
$1.30 |
$1.30 |
$1.50 |
$1.31 |
| 160 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,481 | TON |
$44.00 |
$37.50 |
$50.00 |
$37.50 |
$40.28 |
$57.00 |
$65.00 |
$35.00 |
$45.00 |
| 170 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 494 | TON |
$35.00 |
$34.00 |
$30.00 |
$23.50 |
$29.72 |
$49.00 |
$45.00 |
$25.00 |
$40.00 |
| 180 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 1,975 | SY |
$4.00 |
$2.00 |
$3.62 |
$37.50 |
$4.93 |
$3.40 |
$4.00 |
$3.00 |
$6.00 |
| 190 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$7,500.00 |
$10,000.00 |
$5,724.85 |
$10,000.00 |
$5,775.99 |
$21,000.00 |
$10,000.00 |
$22,000.00 |
$45,000.00 |
| 200 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 22 | SF |
$23.00 |
$24.00 |
$30.50 |
$24.00 |
$15.75 |
$25.00 |
$26.40 |
$15.00 |
$30.00 |
| 210 | 851(C) 8324 |
2" SQUARE TUBE POST | 61 | LF |
$12.00 |
$7.00 |
$15.20 |
$7.00 |
$10.50 |
$8.35 |
$7.70 |
$10.00 |
$16.00 |
| 220 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,800 | SD |
$0.5000 |
$0.1000 |
$0.3000 |
$0.1000 |
$0.3700 |
$0.4000 |
$0.1000 |
$0.3500 |
$0.7000 |
| 230 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 600 | SD |
$1.50 |
$0.2000 |
$0.3000 |
$0.2000 |
$1.05 |
$0.8500 |
$0.2000 |
$1.00 |
$2.00 |
| 240 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 600 | SD |
$1.30 |
$0.2000 |
$0.5500 |
$0.2000 |
$2.10 |
$1.12 |
$0.2000 |
$2.00 |
$1.80 |
| 250 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 300 | SD |
$0.7000 |
$1.65 |
$3.25 |
$1.65 |
$1.58 |
$0.9000 |
$1.65 |
$1.50 |
$0.7000 |
| 260 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 600 | SD |
$0.3000 |
$0.5000 |
$3.25 |
$0.5000 |
$0.5300 |
$0.4000 |
$0.5000 |
$0.5000 |
$0.3000 |
| 270 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$4,400.00 |
$2,000.00 |
$7,000.00 |
$4,287.15 |
$10,800.00 |
$4,500.00 |
$6,500.00 |
$10,000.00 |
| 280 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$1,500.00 |
$3,000.00 |
$1,000.00 |
$2,625.00 |
$6,000.00 |
$2,500.00 |
$3,000.00 |
$4,000.00 |
| 290 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$75,000.00 |
$60,000.00 |
$47,000.00 |
$25,000.00 |
$46,936.75 |
$45,000.00 |
$80,000.00 |
$69,950.00 |
$70,000.00 |