| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$38,000.00 |
$25,600.00 |
$16,500.00 |
$16,500.00 |
$5,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 34,712 | CY |
$6.00 |
$6.65 |
$6.75 |
$6.50 |
$6.16 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 12,571 | CY |
$10.00 |
$7.65 |
$7.75 |
$7.50 |
$12.26 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,000.00 |
$35,800.00 |
$47,250.00 |
$47,250.00 |
$40,000.00 |
| 5 | 210 0121 |
OBLITERATING ABANDONED ROAD | 2,174 | LF |
$7.00 |
$6.15 |
$2.50 |
$2.50 |
$13.75 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 12,726 | LF |
$1.75 |
$2.25 |
$3.00 |
$2.29 |
$3.00 |
| 7 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 10 | EA |
$250.00 |
$500.00 |
$600.00 |
$533.00 |
$530.00 |
| 8 | 221(F) 0100 |
TEMPORARY SILT DIKE | 2,478 | LF |
$7.00 |
$15.00 |
$14.00 |
$15.88 |
$17.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 126,856 | SY |
$1.30 |
$2.50 |
$3.25 |
$3.29 |
$3.35 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 26.21 | AC |
$400.00 |
$1,800.00 |
$1,100.00 |
$1,936.00 |
$2,000.00 |
| 11 | 241 2832 |
MOWING | 110 | AC |
$60.00 |
$165.00 |
$115.00 |
$186.00 |
$150.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 45,042.53 | SY |
$7.00 |
$5.20 |
$6.25 |
$5.90 |
$5.32 |
| 13 | 310(B) 0149 |
SUBGRADE, METHOD B | 3,375 | SY |
$3.00 |
$1.55 |
$2.25 |
$2.00 |
$0.9400 |
| 14 | 325 5271 |
SEPARATOR FABRIC | 6,246.31 | SY |
$1.50 |
$1.55 |
$5.00 |
$3.94 |
$3.34 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 351.78 | TON |
$50.00 |
$41.00 |
$50.00 |
$50.00 |
$44.11 |
| 16 | 407(B) 0250 |
TACK COAT | 50,760.67 | GAL |
$3.00 |
$3.22 |
$1.75 |
$2.00 |
$2.20 |
| 17 | 408 5774 |
PRIME COAT | 21,797.72 | GAL |
$4.00 |
$2.57 |
$2.50 |
$2.90 |
$3.07 |
| 18 | 409(A) 4242 |
FABRIC REINFORCEMENT | 13,985.04 | SY |
$1.75 |
$3.10 |
$2.60 |
$3.00 |
$1.68 |
| 19 | 409(B) 4268 |
BITUMINOUS BINDER | 2,797.01 | GAL |
$4.00 |
$10.25 |
$2.25 |
$10.00 |
$3.53 |
| 20 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 8,273.43 | TON |
$80.00 |
$72.50 |
$75.00 |
$77.00 |
$82.06 |
| 21 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 33,686.66 | TON |
$75.00 |
$68.00 |
$67.00 |
$71.00 |
$76.12 |
| 22 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 6,595.3 | TON |
$90.00 |
$79.20 |
$84.00 |
$84.00 |
$85.43 |
| 23 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,551.46 | TON |
$85.00 |
$69.15 |
$70.00 |
$74.50 |
$82.97 |
| 24 | 412 5267 |
COLD MILLING PAVEMENT | 67,015.39 | SY |
$2.00 |
$1.56 |
$4.00 |
$4.00 |
$1.00 |
| 25 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 43,796 | LF |
$0.1500 |
$0.2500 |
$0.2000 |
$0.1000 |
$0.1600 |
| 26 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 6,246.31 | SY |
$20.00 |
$42.95 |
$42.25 |
$42.00 |
$36.30 |
| 27 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 1,388 | CY |
$130.00 |
$204.50 |
$143.00 |
$200.00 |
$175.00 |
| 28 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 154 | CY |
$20.00 |
$20.45 |
$20.00 |
$20.00 |
$25.00 |
| 29 | 509(A) 0319 |
CLASS AA CONCRETE | 520.22 | CY |
$400.00 |
$434.50 |
$400.00 |
$425.00 |
$525.00 |
| 30 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 2.62 | CY |
$750.00 |
$460.00 |
$500.00 |
$450.00 |
$648.00 |
| 31 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$310.00 |
$409.00 |
$400.00 |
$400.00 |
$400.00 |
| 32 | 511(A) 0332 |
REINFORCING STEEL | 78,696.3 | LB |
$0.9500 |
$1.10 |
$1.00 |
$1.10 |
$1.08 |
| 33 | 609(A) 0288 |
CONCRETE CURB (6" MNTBLE-INTEGRAL) | 64.7 | LF |
$10.00 |
$12.25 |
$45.00 |
$12.00 |
$14.00 |
| 34 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 1,949.43 | SY |
$65.00 |
$49.00 |
$60.00 |
$48.00 |
$85.00 |
| 35 | 610(C) 0608 |
4" CONCRETE DIVIDING STRIP | 25.59 | SY |
$55.00 |
$103.00 |
$55.00 |
$100.00 |
$52.00 |
| 36 | 611(L) 0487 |
JUNCTION BOXES | 66.12 | CF |
$85.00 |
$100.00 |
$150.00 |
$150.00 |
$75.00 |
| 37 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 134 | LF |
$30.00 |
$25.50 |
$25.00 |
$25.00 |
$27.26 |
| 38 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 102 | LF |
$32.00 |
$31.25 |
$35.00 |
$35.00 |
$33.74 |
| 39 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 398 | LF |
$30.00 |
$25.90 |
$30.00 |
$30.00 |
$28.95 |
| 40 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 60 | LF |
$40.00 |
$31.80 |
$50.00 |
$50.00 |
$33.63 |
| 41 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$900.00 |
$305.00 |
$750.00 |
$750.00 |
$317.61 |
| 42 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,500.00 |
$547.00 |
$1,000.00 |
$1,000.00 |
$594.54 |
| 43 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 16 | EA |
$1,200.00 |
$1,534.00 |
$800.00 |
$1,500.00 |
$1,125.00 |
| 44 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 1 | EA |
$1,700.00 |
$1,942.00 |
$900.00 |
$1,900.00 |
$1,300.00 |
| 45 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 4 | EA |
$1,300.00 |
$2,250.00 |
$1,200.00 |
$2,200.00 |
$1,475.00 |
| 46 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 5 | EA |
$1,500.00 |
$2,556.00 |
$1,500.00 |
$2,500.00 |
$1,675.00 |
| 47 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$17,900.00 |
$50,000.00 |
$18,500.00 |
$25,443.02 |
| 48 | 619(B) 4725 |
REMOVAL OF FENCE | 12,361 | LF |
$2.00 |
$1.25 |
$0.3200 |
$1.50 |
$0.7400 |
| 49 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 10,156 | SY |
$5.00 |
$3.52 |
$8.00 |
$5.60 |
$4.81 |
| 50 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 252 | SY |
$8.00 |
$18.00 |
$12.00 |
$23.00 |
$16.90 |
| 51 | 619(B) 4791 |
REMOVAL OF CURB | 64 | LF |
$25.00 |
$13.00 |
$24.00 |
$30.00 |
$10.00 |
| 52 | 619(B) 6132 |
REMOVAL OF 6" CONCRETE DIVIDING STRIP | 30 | SY |
$25.00 |
$17.00 |
$50.00 |
$30.00 |
$16.90 |
| 53 | 619(B) 8610 |
REMOVE AND RESET CATTLE GUARD | 1 | EA |
$1,500.00 |
$1,500.00 |
$2,500.00 |
$2,500.00 |
$537.36 |
| 54 | 619(C) 0924 |
SAWING PAVEMENT | 47,187 | LF |
$3.00 |
$2.25 |
$1.75 |
$2.25 |
$1.75 |
| 55 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 2,757 | LF |
$5.00 |
$7.40 |
$6.25 |
$7.25 |
$5.00 |
| 56 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 592 | LF |
$4.50 |
$8.15 |
$6.75 |
$8.00 |
$5.25 |
| 57 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 2 | EA |
$85.00 |
$107.00 |
$100.00 |
$105.00 |
$100.00 |
| 58 | 629(C) 4960 |
MAILBOX | 2 | EA |
$35.00 |
$26.00 |
$50.00 |
$25.00 |
$50.00 |
| 59 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 2 | EA |
$25.00 |
$26.00 |
$50.00 |
$25.00 |
$50.00 |
| 60 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,250 | CY |
$10.00 |
$6.10 |
$20.00 |
$6.50 |
$9.00 |
| 61 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 141 | CY |
$15.00 |
$35.80 |
$20.00 |
$35.00 |
$18.00 |
| 62 | 509(A) 1326 |
CLASS AA CONCRETE | 310 | CY |
$550.00 |
$664.00 |
$320.00 |
$425.00 |
$575.32 |
| 63 | 511(A) 1332 |
REINFORCING STEEL | 53,810 | LB |
$1.00 |
$1.10 |
$1.00 |
$1.10 |
$1.10 |
| 64 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 314 | SF |
$20.00 |
$25.55 |
$16.00 |
$25.00 |
$16.00 |
| 65 | 851(C) 8324 |
2" SQUARE TUBE POST | 180 | LF |
$8.00 |
$9.20 |
$9.00 |
$9.00 |
$9.00 |
| 66 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 302 | LF |
$8.93 |
$10.20 |
$8.00 |
$10.00 |
$8.00 |
| 67 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 81,588 | LF |
$0.2500 |
$0.4900 |
$0.3500 |
$0.3500 |
$0.3500 |
| 68 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 244 | LF |
$2.93 |
$0.6000 |
$2.00 |
$0.6000 |
$2.00 |
| 69 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 1,296 | LF |
$7.24 |
$0.8000 |
$6.00 |
$0.8000 |
$6.00 |
| 70 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 60 | DAY |
$475.00 |
$475.00 |
$475.00 |
$475.00 |
$475.00 |
| 71 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 255 | SD |
$146.00 |
$64.00 |
$60.00 |
$63.00 |
$60.00 |
| 72 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 186,400 | LF |
$0.1000 |
$0.1200 |
$0.0500 |
$0.1200 |
$0.0500 |
| 73 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 30,000 | LF |
$0.2500 |
$0.2600 |
$0.2000 |
$0.2500 |
$0.2000 |
| 74 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,200 | SD |
$7.25 |
$5.10 |
$5.00 |
$5.00 |
$5.00 |
| 75 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,800 | LF |
$30.00 |
$30.00 |
$27.00 |
$29.35 |
$15.00 |
| 76 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 4,500 | LF |
$3.50 |
$0.5100 |
$1.00 |
$0.5000 |
$4.90 |
| 77 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 9,000 | SD |
$1.00 |
$0.2500 |
$0.5000 |
$0.2500 |
$0.5000 |
| 78 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 900 | SD |
$1.90 |
$3.30 |
$5.00 |
$3.25 |
$5.00 |
| 79 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,800 | SD |
$3.00 |
$3.30 |
$6.00 |
$3.25 |
$6.00 |
| 80 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,500 | SD |
$0.7500 |
$0.5000 |
$0.2500 |
$0.5000 |
$0.2500 |
| 81 | 880(C) 8848 |
WING BARRICADES | 2,400 | SD |
$1.75 |
$0.0200 |
$0.2500 |
$0.0200 |
$0.2500 |
| 82 | 880(D) 8854 |
VERTICAL PANELS | 18,000 | SD |
$0.5000 |
$0.4000 |
$0.2500 |
$0.4000 |
$0.2500 |
| 83 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,000 | SD |
$0.7500 |
$0.4500 |
$4.00 |
$0.4500 |
$4.50 |
| 84 | 880(F) 8878 |
DRUMS | 25,800 | SD |
$0.1000 |
$0.2500 |
$0.1000 |
$0.2500 |
$0.1000 |
| 85 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 600 | SD |
$13.00 |
$15.50 |
$10.00 |
$15.00 |
$10.00 |
| 86 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$70,400.00 |
$100,000.00 |
$50,500.00 |
$42,161.10 |
| 87 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$40,000.00 |
$5,000.00 |
$3,000.00 |
| 88 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$352,545.10 |
$302,500.00 |
$370,000.00 |
$380,000.00 |
$333,882.88 |