| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$50,000.00 |
$15,000.00 |
$26,000.00 |
$13,312.19 |
$78,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,838 | CY |
$14.00 |
$15.00 |
$28.00 |
$18.00 |
$28.52 |
$22.50 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$3,250.00 |
$10,000.00 |
$37,000.00 |
$11,688.45 |
$36,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,390 | LF |
$3.00 |
$3.00 |
$2.99 |
$3.18 |
$4.21 |
$1.25 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 112 | LF |
$16.00 |
$10.00 |
$18.99 |
$20.22 |
$13.94 |
$6.75 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 6,338 | SY |
$4.80 |
$7.35 |
$6.95 |
$7.40 |
$8.70 |
$5.26 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 5,324 | CY |
$45.00 |
$58.00 |
$62.00 |
$70.00 |
$60.63 |
$76.00 |
| 8 | 310(B) 0149 |
SUBGRADE, METHOD B | 3,002 | SY |
$3.60 |
$4.00 |
$4.60 |
$6.50 |
$8.04 |
$3.15 |
| 9 | 325 5271 |
SEPARATOR FABRIC | 3,137 | SY |
$2.00 |
$1.50 |
$3.75 |
$3.00 |
$3.96 |
$0.8500 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 197 | TON |
$35.00 |
$23.00 |
$31.00 |
$25.00 |
$123.03 |
$49.50 |
| 11 | 407(B) 0250 |
TACK COAT | 119 | GAL |
$3.40 |
$2.05 |
$8.00 |
$2.13 |
$8.37 |
$2.25 |
| 12 | 408 5774 |
PRIME COAT | 723 | GAL |
$3.70 |
$10.00 |
$3.50 |
$1.00 |
$8.45 |
$10.69 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 707 | TON |
$86.00 |
$120.00 |
$103.50 |
$122.48 |
$139.62 |
$135.88 |
| 14 | 412 5267 |
COLD MILLING PAVEMENT | 45,424 | SY |
$1.30 |
$1.75 |
$2.50 |
$4.25 |
$1.83 |
$1.57 |
| 15 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 48,501 | SY |
$12.00 |
$9.90 |
$4.00 |
$11.50 |
$16.00 |
$12.92 |
| 16 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 9,626 | CY |
$120.00 |
$156.00 |
$153.00 |
$105.00 |
$115.00 |
$213.00 |
| 17 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 147 | LF |
$39.00 |
$25.00 |
$40.00 |
$45.00 |
$86.10 |
$47.64 |
| 18 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 6 | EA |
$1,260.00 |
$700.00 |
$1,750.00 |
$2,400.00 |
$1,846.70 |
$191.94 |
| 19 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$10,000.00 |
$4,000.00 |
$22,000.00 |
$4,321.22 |
$1,200.00 |
| 20 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 510 | SY |
$9.99 |
$6.50 |
$15.00 |
$10.00 |
$12.94 |
$6.39 |
| 21 | 619(C) 0924 |
SAWING PAVEMENT | 172 | LF |
$6.60 |
$3.25 |
$15.00 |
$5.40 |
$6.40 |
$4.32 |
| 22 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 300 | LF |
$22.00 |
$19.00 |
$18.00 |
$19.17 |
$22.53 |
$20.25 |
| 23 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,523.00 |
$1,225.00 |
$1,175.00 |
$2,662.50 |
$1,470.44 |
$2,812.25 |
| 24 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,490.00 |
$2,650.00 |
$2,550.00 |
$1,597.50 |
$3,191.17 |
$1,687.35 |
| 25 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,007 | LF |
$8.00 |
$8.75 |
$5.00 |
$8.95 |
$6.26 |
$5.62 |
| 26 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 1 | EA |
$1,025.00 |
$1,450.00 |
$800.00 |
$1,491.00 |
$1,001.15 |
$899.92 |
| 27 | 626(A) 1257 |
MONUMENTS | 3 | EA |
$500.00 |
$2,550.00 |
$2,500.00 |
$500.00 |
$1,789.56 |
$850.00 |
| 28 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 136 | CY |
$18.00 |
$7.50 |
$25.00 |
$20.00 |
$18.01 |
$23.25 |
| 29 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 246 | CY |
$30.00 |
$31.00 |
$40.00 |
$75.00 |
$26.86 |
$21.60 |
| 30 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 136 | CY |
$30.00 |
$67.00 |
$35.00 |
$50.00 |
$23.75 |
$10.82 |
| 31 | 501(F) 6352 |
GRANULAR BACKFILL | 140 | CY |
$45.00 |
$46.00 |
$55.00 |
$85.00 |
$58.52 |
$66.00 |
| 32 | 504(B) 1305 |
SAW-CUT GROOVING | 251.8 | SY |
$7.00 |
$10.00 |
$9.20 |
$9.20 |
$11.51 |
$10.35 |
| 33 | 504(C) 6250 |
SEALED EXPANSION JOINT | 87 | LF |
$120.00 |
$62.50 |
$25.00 |
$100.00 |
$34.16 |
$300.00 |
| 34 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 253.33 | LF |
$93.00 |
$100.00 |
$150.00 |
$135.00 |
$106.07 |
$88.00 |
| 35 | 508 6359 |
PRECAST ARCH CULVERT | 58 | LF |
$4,000.00 |
$5,250.00 |
$8,600.00 |
$5,950.00 |
$5,506.33 |
$9,200.00 |
| 36 | 509(A) 1326 |
CLASS AA CONCRETE | 350 | CY |
$706.00 |
$315.00 |
$720.00 |
$600.00 |
$880.58 |
$470.00 |
| 37 | 511(A) 1332 |
REINFORCING STEEL | 25,952 | LB |
$1.00 |
$1.10 |
$1.50 |
$1.65 |
$1.07 |
$0.8400 |
| 38 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 5,836 | LB |
$1.50 |
$1.50 |
$2.00 |
$2.25 |
$1.67 |
$2.03 |
| 39 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 166 | SY |
$5.30 |
$6.25 |
$6.00 |
$6.00 |
$7.51 |
$6.75 |
| 40 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,027 | TON |
$43.00 |
$32.00 |
$30.00 |
$40.00 |
$60.93 |
$35.05 |
| 41 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 514 | TON |
$35.00 |
$22.00 |
$24.00 |
$35.00 |
$41.99 |
$21.61 |
| 42 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 2,054 | SY |
$3.00 |
$1.30 |
$1.50 |
$3.00 |
$1.29 |
$4.50 |
| 43 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$25,000.00 |
$30,000.00 |
$35,000.00 |
$25,000.00 |
$15,000.00 |
| 44 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 122.58 | SF |
$21.00 |
$26.00 |
$25.00 |
$26.63 |
$31.29 |
$28.12 |
| 45 | 851(C) 8324 |
2" SQUARE TUBE POST | 237.5 | LF |
$8.00 |
$11.00 |
$10.00 |
$10.65 |
$12.51 |
$11.25 |
| 46 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 48,408 | LF |
$0.5000 |
$0.5500 |
$0.5000 |
$0.5300 |
$0.6300 |
$0.5600 |
| 47 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 62 | LF |
$7.80 |
$8.60 |
$8.50 |
$9.05 |
$10.64 |
$9.56 |
| 48 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$12,000.00 |
$6,000.00 |
$55,000.00 |
$7,508.64 |
$8,800.00 |
| 49 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 28 | SD |
$26.00 |
$26.00 |
$25.00 |
$26.63 |
$31.29 |
$30.00 |
| 50 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$40,500.00 |
$31,817.63 |
$57,000.00 |
$14,901.52 |
$16,800.00 |
| 51 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$2,000.00 |
$2,500.00 |
$22,000.00 |
$3,128.60 |
$1,000.00 |
| 52 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$174,000.00 |
$197,184.52 |
$184,700.00 |
$204,289.00 |
$169,330.40 |
$191,500.00 |