| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$13,800.00 |
$12,656.80 |
$11,500.00 |
$27,500.00 |
$45,000.00 |
$35,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 6,174.2 | CY |
$8.80 |
$9.11 |
$12.25 |
$28.33 |
$12.50 |
$18.25 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,126.08 | CY |
$13.60 |
$11.39 |
$13.50 |
$28.33 |
$13.85 |
$19.30 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$11,250.00 |
$13,289.64 |
$17,000.00 |
$27,500.00 |
$45,456.00 |
$13,125.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 23,900 | LF |
$2.80 |
$2.47 |
$2.50 |
$1.00 |
$1.98 |
$1.95 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,500 | LF |
$12.00 |
$10.11 |
$20.00 |
$8.00 |
$10.98 |
$7.99 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 43,342.45 | SY |
$3.50 |
$3.15 |
$4.50 |
$4.25 |
$2.76 |
$2.49 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 8.96 | AC |
$1,700.00 |
$1,582.10 |
$1,500.00 |
$100.00 |
$850.00 |
$1,250.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 4,115.84 | CY |
$60.00 |
$39.39 |
$48.00 |
$51.22 |
$57.35 |
$51.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 4,371.35 | TON |
$26.00 |
$28.73 |
$38.00 |
$26.33 |
$31.45 |
$30.45 |
| 11 | 407(B) 0250 |
TACK COAT | 4,933.48 | GAL |
$2.25 |
$3.15 |
$2.50 |
$3.25 |
$2.55 |
$2.25 |
| 12 | 408 5774 |
PRIME COAT | 16,303.98 | GAL |
$3.00 |
$3.28 |
$4.90 |
$0.3200 |
$2.65 |
$2.25 |
| 13 | 409(A) 4242 |
FABRIC REINFORCEMENT | 65,672.09 | SY |
$1.90 |
$1.95 |
$2.00 |
$1.75 |
$1.60 |
$1.79 |
| 14 | 409(B) 4268 |
BITUMINOUS BINDER | 16,418.02 | GAL |
$2.90 |
$2.72 |
$2.50 |
$2.50 |
$2.25 |
$3.30 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,448.15 | TON |
$95.00 |
$102.44 |
$82.25 |
$91.00 |
$81.50 |
$110.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,728.98 | TON |
$115.00 |
$122.06 |
$89.50 |
$105.00 |
$97.20 |
$110.00 |
| 17 | 412 5267 |
COLD MILLING PAVEMENT | 2,242.33 | SY |
$2.60 |
$4.39 |
$2.50 |
$8.88 |
$3.60 |
$15.00 |
| 18 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 80 | CY |
$28.00 |
$22.78 |
$45.00 |
$22.65 |
$25.00 |
$11.03 |
| 19 | 509(A) 0319 |
CLASS AA CONCRETE | 147 | CY |
$500.00 |
$498.60 |
$525.00 |
$999.00 |
$550.00 |
$455.00 |
| 20 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$335.00 |
$400.71 |
$316.25 |
$375.00 |
$385.00 |
$275.00 |
| 21 | 511(A) 0332 |
REINFORCING STEEL | 13,003 | LB |
$1.00 |
$1.63 |
$1.15 |
$1.10 |
$0.9900 |
$0.9600 |
| 22 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 82 | LF |
$85.00 |
$79.67 |
$83.00 |
$57.50 |
$70.57 |
$79.02 |
| 23 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 117 | LF |
$100.00 |
$105.31 |
$103.00 |
$63.55 |
$100.65 |
$94.72 |
| 24 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 117 | LF |
$139.00 |
$184.49 |
$150.00 |
$111.22 |
$168.95 |
$149.10 |
| 25 | 613(A) 4499 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 39 | LF |
$150.00 |
$227.26 |
$190.00 |
$164.55 |
$210.12 |
$189.00 |
| 26 | 613(A) 4500 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 38 | LF |
$175.00 |
$276.96 |
$225.00 |
$186.37 |
$260.52 |
$236.25 |
| 27 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 1,686 | LF |
$40.00 |
$51.34 |
$45.00 |
$33.34 |
$27.15 |
$42.00 |
| 28 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 6 | EA |
$2,000.00 |
$2,790.19 |
$2,500.00 |
$2,344.59 |
$3,528.00 |
$2,415.00 |
| 29 | 613(L) 4540 |
51" X 31" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$2,250.00 |
$3,709.08 |
$3,500.00 |
$3,766.22 |
$5,400.00 |
$3,150.00 |
| 30 | 613(L) 4546 |
58" X 36" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$2,500.00 |
$4,398.24 |
$3,800.00 |
$3,977.82 |
$6,600.00 |
$3,780.00 |
| 31 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$840.00 |
$1,071.98 |
$1,500.00 |
$1,174.65 |
$1,600.00 |
$1,312.50 |
| 32 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$710.00 |
$1,264.95 |
$1,500.00 |
$1,298.36 |
$1,980.00 |
$1,417.50 |
| 33 | 613(P) 7025 |
21" X 15" GALV. STEEL CULVERT END SECTION ARCH | 112 | EA |
$150.00 |
$183.78 |
$350.00 |
$222.22 |
$98.40 |
$750.00 |
| 34 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$7,600.00 |
$6,581.54 |
$15,000.00 |
$12,500.00 |
$40,000.00 |
$13,125.00 |
| 35 | 619(C) 0924 |
SAWING PAVEMENT | 800 | LF |
$5.00 |
$5.06 |
$3.00 |
$7.77 |
$3.30 |
$10.00 |
| 36 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 22 | EA |
$164.00 |
$101.25 |
$300.00 |
$125.00 |
$200.00 |
$175.00 |
| 37 | 612(K) 5758 |
2" WATER LINE REMOVED & RELAID | 20 | LF |
$75.00 |
$23.40 |
$25.00 |
$25.00 |
$36.00 |
$21.00 |
| 38 | 612(K) 5761 |
4" WATER LINE REMOVED & RELAID | 1,760 | LF |
$13.00 |
$15.82 |
$26.00 |
$35.00 |
$27.60 |
$23.10 |
| 39 | 616(D) 1050 |
2" GATE VALVE | 1 | EA |
$500.00 |
$722.67 |
$1,000.00 |
$375.00 |
$600.00 |
$1,050.00 |
| 40 | 616(D) 1060 |
4" GATE VALVE | 4 | EA |
$750.00 |
$1,023.68 |
$1,500.00 |
$425.00 |
$900.00 |
$1,050.00 |
| 41 | 616(D) 7051 |
STANDARD VALVE BOX | 5 | EA |
$150.00 |
$298.86 |
$500.00 |
$500.00 |
$240.00 |
$315.00 |
| 42 | 616(D) 7078 |
VALVE BOX EXTENSION | 5 | EA |
$75.00 |
$209.76 |
$100.00 |
$500.00 |
$120.00 |
$105.00 |
| 43 | 616(G) 1210 |
FLUSH FIRE HYDRANTS | 3 | EA |
$1,500.00 |
$1,974.78 |
$3,000.00 |
$1,750.00 |
$3,000.00 |
$2,625.00 |
| 44 | 616(I) 0100 |
8" STEEL CASING | 160 | LF |
$15.00 |
$62.12 |
$180.00 |
$75.00 |
$14.40 |
$157.50 |
| 45 | 616(J) 0100 |
HDPE CONDUIT ENCASED | 850 | LF |
$25.00 |
$5.79 |
$18.00 |
$25.00 |
$90.00 |
$15.75 |
| 46 | 616(N) 0090 |
SERVICE CONNECTION (SHORT) | 1 | EA |
$500.00 |
$507.02 |
$1,000.00 |
$1,250.00 |
$900.00 |
$1,050.00 |
| 47 | 616(N) 0092 |
SERVICE CONNECTION (LONG) | 12 | EA |
$750.00 |
$571.36 |
$1,900.00 |
$1,250.00 |
$1,800.00 |
$1,575.00 |
| 48 | 616(V) 0100 |
HYDROSTATIC PRESSURE TESTING & DISINFECTION | 1 | LSUM |
$2,000.00 |
$533.77 |
$9,500.00 |
$7,500.00 |
$2,400.00 |
$7,875.00 |
| 49 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 566 | LF |
$6.50 |
$2.84 |
$18.00 |
$25.00 |
$36.00 |
$15.75 |
| 50 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 160 | CY |
$10.00 |
$12.66 |
$33.00 |
$25.00 |
$35.00 |
$28.50 |
| 51 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 34 | CY |
$21.00 |
$22.78 |
$44.00 |
$25.00 |
$35.00 |
$38.25 |
| 52 | 509(A) 1326 |
CLASS AA CONCRETE | 77 | CY |
$700.00 |
$665.67 |
$593.00 |
$999.00 |
$445.00 |
$515.00 |
| 53 | 511(A) 1332 |
REINFORCING STEEL | 6,969 | LB |
$1.10 |
$1.63 |
$1.15 |
$1.25 |
$0.9900 |
$0.9600 |
| 54 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$32,500.00 |
$15,188.16 |
$9,500.00 |
$7,500.00 |
$30,000.00 |
$8,500.00 |
| 55 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 160 | CY |
$10.00 |
$12.66 |
$332.00 |
$25.00 |
$35.00 |
$28.50 |
| 56 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 34 | CY |
$21.00 |
$22.78 |
$42.00 |
$25.00 |
$35.00 |
$38.25 |
| 57 | 509(A) 1326 |
CLASS AA CONCRETE | 77 | CY |
$700.00 |
$665.67 |
$593.00 |
$999.00 |
$445.00 |
$515.00 |
| 58 | 511(A) 1332 |
REINFORCING STEEL | 6,969 | LB |
$1.10 |
$1.63 |
$1.15 |
$1.25 |
$0.9900 |
$0.9600 |
| 59 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$32,500.00 |
$15,188.16 |
$9,500.00 |
$7,500.00 |
$30,000.00 |
$8,500.00 |
| 60 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 70.3 | SF |
$20.00 |
$25.31 |
$22.00 |
$22.00 |
$24.00 |
$20.00 |
| 61 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 120 | LF |
$4.25 |
$10.13 |
$10.00 |
$9.60 |
$9.60 |
$8.00 |
| 62 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 84,200 | LF |
$0.3000 |
$0.4300 |
$0.3600 |
$0.4000 |
$0.4000 |
$0.3400 |
| 63 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,200.00 |
$6,075.26 |
$12,000.00 |
$6,750.00 |
$5,760.00 |
$4,800.00 |
| 64 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$31,009.16 |
$39,000.00 |
$27,500.00 |
$28,740.00 |
$41,000.00 |
| 65 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,250.00 |
$1,898.52 |
$10,000.00 |
$3,500.00 |
$4,500.00 |
$5,000.00 |
| 66 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$146,818.89 |
$96,500.00 |
$45,000.00 |
$223,000.00 |
$166,500.00 |