| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$88,200.00 |
$77,997.50 |
$40,000.00 |
$120,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 70,961 | CY |
$8.00 |
$4.99 |
$8.86 |
$8.50 |
$8.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$52,500.00 |
$25,000.00 |
$100,000.00 |
$150,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,230 | LF |
$5.00 |
$1.94 |
$1.85 |
$2.00 |
$2.04 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 2,110 | LF |
$10.00 |
$13.43 |
$12.79 |
$14.00 |
$14.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 200,000 | SY |
$2.50 |
$1.73 |
$1.65 |
$1.88 |
$2.00 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 49.32 | AC |
$700.00 |
$525.00 |
$500.00 |
$550.00 |
$505.00 |
| 8 | 303(A) 2200 |
(SP)AGGREGATE BASE TYPE A, PLANT MIXED | 18,222 | CY |
$60.00 |
$69.09 |
$92.00 |
$76.50 |
$74.97 |
| 9 | 311(B) 0152 |
PROCESSING EXISTING BASE & SURFACE, METHOD B | 36,914 | LF |
$5.50 |
$1.91 |
$2.00 |
$5.75 |
$7.31 |
| 10 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 101,014 | SY |
$2.50 |
$1.47 |
$2.25 |
$2.45 |
$2.50 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 6,182 | TON |
$45.00 |
$31.34 |
$50.00 |
$49.00 |
$38.75 |
| 12 | 407(B) 0250 |
TACK COAT | 5,988 | GAL |
$3.50 |
$4.17 |
$2.17 |
$4.35 |
$4.40 |
| 13 | 408 5774 |
PRIME COAT | 23,213 | GAL |
$4.50 |
$4.41 |
$2.56 |
$4.60 |
$4.75 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 13,291 | TON |
$75.00 |
$86.22 |
$84.65 |
$93.00 |
$90.33 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 8,874 | TON |
$85.00 |
$92.82 |
$88.86 |
$100.00 |
$97.24 |
| 16 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 149 | CY |
$20.00 |
$31.50 |
$30.00 |
$13.00 |
$16.00 |
| 17 | 509(A) 0319 |
CLASS AA CONCRETE | 384 | CY |
$700.00 |
$667.22 |
$648.75 |
$600.00 |
$775.00 |
| 18 | 509(D) 0325 |
CLASS C CONCRETE | 293 | CY |
$350.00 |
$440.09 |
$271.25 |
$325.00 |
$425.00 |
| 19 | 511(A) 0332 |
REINFORCING STEEL | 61,167 | LB |
$1.25 |
$1.18 |
$1.19 |
$0.9500 |
$1.08 |
| 20 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 424 | TON |
$47.00 |
$51.08 |
$57.22 |
$45.00 |
$52.00 |
| 21 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 142 | TON |
$40.00 |
$37.57 |
$46.66 |
$37.00 |
$45.00 |
| 22 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 98 | LF |
$90.00 |
$52.50 |
$119.42 |
$70.00 |
$110.00 |
| 23 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 100 | LF |
$100.00 |
$86.10 |
$137.26 |
$90.00 |
$120.00 |
| 24 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 66 | LF |
$175.00 |
$183.75 |
$284.50 |
$185.00 |
$222.00 |
| 25 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 284 | LF |
$95.00 |
$105.00 |
$149.66 |
$105.00 |
$129.00 |
| 26 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 152 | LF |
$150.00 |
$128.10 |
$189.72 |
$125.00 |
$130.00 |
| 27 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 83 | LF |
$175.00 |
$178.50 |
$234.49 |
$170.00 |
$200.00 |
| 28 | 613(A) 4499 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 55 | LF |
$200.00 |
$262.50 |
$292.45 |
$225.00 |
$225.00 |
| 29 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 1,553 | LF |
$40.00 |
$24.15 |
$32.38 |
$30.00 |
$54.00 |
| 30 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 55 | LF |
$45.00 |
$42.00 |
$44.06 |
$45.00 |
$96.00 |
| 31 | 613(M) 7150 |
TYPE A3 CULVERT END TREATMENT | 58 | EA |
$1,200.00 |
$1,187.33 |
$1,300.00 |
$1,345.00 |
$1,250.00 |
| 32 | 613(M) 7151 |
TYPE B3 CULVERT END TREATMENT | 12 | EA |
$1,400.00 |
$1,324.54 |
$1,400.00 |
$1,450.00 |
$1,550.00 |
| 33 | 613(M) 7152 |
TYPE C3 CULVERT END TREATMENT | 4 | EA |
$1,600.00 |
$1,751.54 |
$1,500.00 |
$1,680.00 |
$2,500.00 |
| 34 | 613(M) 7154 |
TYPE E3 CULVERT END TREATMENT | 2 | EA |
$1,800.00 |
$1,973.06 |
$1,700.00 |
$2,790.00 |
$2,800.00 |
| 35 | 613(M) 7156 |
TYPE BB3 CULVERT END TREATMENT | 4 | EA |
$2,000.00 |
$2,212.92 |
$2,200.00 |
$3,565.00 |
$2,400.00 |
| 36 | 613(M) 7157 |
TYPE CC3 CULVERT END TREATMENT | 2 | EA |
$2,200.00 |
$2,642.80 |
$2,400.00 |
$3,800.00 |
$3,150.00 |
| 37 | 619(B) 4725 |
REMOVAL OF FENCE | 38,207 | LF |
$1.00 |
$0.6900 |
$0.9300 |
$1.10 |
$2.00 |
| 38 | 619(B) 4778 |
REMOVAL OF EXISTING STRUCTURES | 4 | EA |
$3,000.00 |
$10,500.00 |
$10,000.00 |
$2,500.00 |
$4,250.00 |
| 39 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 532 | LF |
$4.50 |
$2.10 |
$10.00 |
$3.75 |
$5.00 |
| 40 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 187 | LF |
$15.00 |
$21.00 |
$28.25 |
$10.00 |
$43.00 |
| 41 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$3,000.00 |
$2,766.75 |
$2,635.00 |
$3,625.00 |
$2,897.50 |
| 42 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 36,639 | LF |
$5.00 |
$7.09 |
$6.75 |
$6.90 |
$7.55 |
| 43 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 4 | EA |
$200.00 |
$262.50 |
$100.00 |
$200.00 |
$165.00 |
| 44 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 67 | SF |
$23.00 |
$40.95 |
$39.00 |
$40.00 |
$44.00 |
| 45 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 117 | LF |
$20.00 |
$10.50 |
$10.00 |
$12.00 |
$11.00 |
| 46 | 853 9030 |
DELINEATORS(TYPE 1, CODE 3) | 24 | EA |
$25.00 |
$27.30 |
$26.00 |
$28.00 |
$28.60 |
| 47 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 31,170 | LF |
$0.5500 |
$0.4700 |
$0.4500 |
$0.4700 |
$0.5000 |
| 48 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,510 | SD |
$0.2500 |
$1.05 |
$1.00 |
$1.10 |
$1.10 |
| 49 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 8,100 | SD |
$0.5000 |
$1.05 |
$1.00 |
$1.10 |
$1.10 |
| 50 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 10,530 | SD |
$0.4500 |
$0.0500 |
$0.0500 |
$0.0800 |
$0.0600 |
| 51 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 22,140 | SD |
$0.1500 |
$0.4700 |
$0.4500 |
$0.4700 |
$0.5000 |
| 52 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 264 | CY |
$8.00 |
$9.45 |
$4.00 |
$8.50 |
$12.50 |
| 53 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 72 | CY |
$20.00 |
$36.75 |
$30.00 |
$13.00 |
$21.50 |
| 54 | 509(A) 1326 |
CLASS AA CONCRETE | 99 | CY |
$700.00 |
$676.59 |
$561.35 |
$600.00 |
$710.00 |
| 55 | 511(A) 1332 |
REINFORCING STEEL | 18,224 | LB |
$1.25 |
$1.28 |
$1.19 |
$1.00 |
$1.09 |
| 56 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 103 | TON |
$47.00 |
$61.58 |
$57.22 |
$45.00 |
$52.00 |
| 57 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 35 | TON |
$40.00 |
$50.17 |
$46.66 |
$37.00 |
$45.00 |
| 58 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$21,000.00 |
$35,000.00 |
$3,000.00 |
$50,000.00 |
| 59 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$110,240.00 |
$50,000.00 |
$85,000.00 |
$125,000.00 |
| 60 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$4,635.00 |
$7,500.00 |
$6,000.00 |
$20,000.00 |
| 61 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$345,500.00 |
$315,167.45 |
$347,270.18 |
$325,000.00 |
$361,000.00 |