| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$25,000.00 |
$20,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 9,651 | CY |
$6.50 |
$11.00 |
$6.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 25,815 | CY |
$8.00 |
$10.00 |
$11.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$20,000.00 |
$14,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,990 | LF |
$1.50 |
$4.40 |
$6.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 126 | LF |
$8.50 |
$31.75 |
$32.00 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 276 | LF |
$3.00 |
$7.50 |
$11.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 19,077 | SY |
$1.50 |
$7.50 |
$7.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 4 | AC |
$400.00 |
$4,265.00 |
$4,000.00 |
| 10 | 241 2832 |
MOWING | 8 | AC |
$75.00 |
$605.00 |
$400.00 |
| 11 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 1 | EA |
$3,000.00 |
$4,500.00 |
$5,500.00 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 325 | TON |
$31.00 |
$40.00 |
$65.00 |
| 13 | 407(B) 0250 |
TACK COAT | 1,853 | GAL |
$4.00 |
$4.40 |
$11.00 |
| 14 | 408 5774 |
PRIME COAT | 3,919 | GAL |
$8.46 |
$6.60 |
$17.00 |
| 15 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 587 | TON |
$105.00 |
$126.00 |
$135.00 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,955 | TON |
$80.00 |
$116.00 |
$125.00 |
| 17 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 382 | TON |
$125.00 |
$125.00 |
$165.00 |
| 18 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 703 | TON |
$115.00 |
$120.00 |
$160.00 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 71 | CY |
$300.00 |
$385.00 |
$320.00 |
| 20 | 613(B) 0698 |
72" CORR. GALV. STEEL PIPE | 104 | LF |
$105.00 |
$150.00 |
$250.00 |
| 21 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 109 | LF |
$30.00 |
$30.00 |
$90.00 |
| 22 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 110 | LF |
$30.00 |
$40.00 |
$150.00 |
| 23 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,100.00 |
$1,350.00 |
$2,500.00 |
| 24 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$1,650.00 |
$2,600.00 |
| 25 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$3,600.00 |
| 26 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 7,682 | SY |
$4.00 |
$10.00 |
$3.00 |
| 27 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 849 | LF |
$5.00 |
$5.00 |
$3.00 |
| 28 | 619(C) 0924 |
SAWING PAVEMENT | 662 | LF |
$7.50 |
$5.00 |
$2.00 |
| 29 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 2,597 | LF |
$5.00 |
$6.00 |
$8.00 |
| 30 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,890 | CY |
$10.00 |
$11.00 |
$13.00 |
| 31 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 438 | CY |
$20.00 |
$25.00 |
$20.00 |
| 32 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$25,000.00 |
$30,000.00 |
$30,000.00 |
| 33 | 509(A) 1326 |
CLASS AA CONCRETE | 826.1 | CY |
$500.00 |
$500.00 |
$450.00 |
| 34 | 511(A) 1332 |
REINFORCING STEEL | 143,480 | LB |
$1.00 |
$1.00 |
$1.50 |
| 35 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 120 | TON |
$55.00 |
$52.00 |
$100.00 |
| 36 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 40 | TON |
$45.00 |
$42.00 |
$60.00 |
| 37 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$45,000.00 |
$45,000.00 |
$48,213.00 |
| 38 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 9,100 | LF |
$0.1500 |
$0.2700 |
$0.4000 |
| 39 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 120 | SD |
$10.00 |
$21.00 |
$7.00 |
| 40 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 350 | LF |
$22.00 |
$30.00 |
$32.00 |
| 41 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,160 | SD |
$0.3500 |
$0.6700 |
$1.00 |
| 42 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,440 | SD |
$0.6500 |
$2.10 |
$1.25 |
| 43 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,880 | SD |
$1.30 |
$2.10 |
$2.50 |
| 44 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,160 | SD |
$0.8500 |
$0.2700 |
$1.00 |
| 45 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$1.30 |
$0.5500 |
$1.25 |
| 46 | 880(D) 8854 |
VERTICAL PANELS | 13,500 | SD |
$0.1500 |
$0.0700 |
$0.5000 |
| 47 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 6,480 | SD |
$0.3500 |
$0.5300 |
$0.5000 |
| 48 | 880(F) 8878 |
DRUMS | 5,400 | SD |
$0.2500 |
$0.5300 |
$0.5000 |
| 49 | 880(G) 8890 |
CHANNELIZER CONES | 7,650 | SD |
$0.3000 |
$0.1200 |
$0.5000 |
| 50 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 388 | SD |
$12.00 |
$22.00 |
$20.00 |
| 51 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 52 | SF |
$18.00 |
$36.00 |
$12.00 |
| 52 | 851(C) 8324 |
2" SQUARE TUBE POST | 106 | LF |
$9.00 |
$12.00 |
$6.00 |
| 53 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 4,800 | LF |
$1.00 |
$0.9000 |
$1.25 |
| 54 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$10,000.00 |
$10,000.00 |
| 55 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$1,200.00 |
| 56 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$110,000.00 |
$100,000.00 |
$149,000.00 |