| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$25,000.00 |
$50,000.00 |
$33,000.00 |
$45,000.00 |
$85,470.00 |
$74,065.00 |
$78,000.00 |
$75,000.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,280 | LF |
$2.50 |
$5.82 |
$6.00 |
$5.29 |
$5.29 |
$2.50 |
$5.25 |
$7.00 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 238 | LF |
$11.50 |
$13.20 |
$24.00 |
$21.98 |
$21.98 |
$14.40 |
$32.00 |
$25.00 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 7,655 | SY |
$3.00 |
$7.08 |
$8.00 |
$6.44 |
$6.44 |
$7.73 |
$8.50 |
$8.00 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.58 | AC |
$1,250.00 |
$770.00 |
$5,375.00 |
$4,885.00 |
$4,885.00 |
$1,200.00 |
$12,800.00 |
$6,500.00 |
| 6 | 307(A) 4200 |
FLY ASH | 101 | TON |
$75.00 |
$115.50 |
$200.00 |
$105.00 |
$105.00 |
$129.00 |
$115.00 |
$200.00 |
| 7 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 2,667 | SY |
$3.00 |
$7.15 |
$5.00 |
$6.50 |
$6.50 |
$8.90 |
$7.45 |
$14.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 73 | TON |
$50.80 |
$56.00 |
$60.00 |
$100.00 |
$82.00 |
$67.00 |
$38.00 |
$90.00 |
| 9 | 407(B) 0250 |
TACK COAT | 127 | GAL |
$4.90 |
$4.40 |
$5.50 |
$4.00 |
$4.00 |
$4.40 |
$4.00 |
$30.00 |
| 10 | 408 5774 |
PRIME COAT | 940 | GAL |
$5.80 |
$5.50 |
$5.50 |
$5.00 |
$5.00 |
$5.50 |
$5.00 |
$10.00 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 583 | TON |
$121.70 |
$236.50 |
$208.00 |
$215.00 |
$215.00 |
$258.00 |
$218.00 |
$150.00 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 280 | TON |
$131.70 |
$258.50 |
$218.00 |
$235.00 |
$235.00 |
$282.00 |
$240.00 |
$150.00 |
| 13 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$376.00 |
$300.00 |
$475.00 |
$400.00 |
$610.00 |
$420.00 |
$290.00 |
$600.00 |
| 14 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 56 | LF |
$32.40 |
$38.00 |
$36.00 |
$57.04 |
$174.00 |
$31.00 |
$85.00 |
$100.00 |
| 15 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,240.30 |
$1,500.00 |
$1,800.00 |
$1,250.00 |
$2,204.00 |
$1,800.00 |
$1,285.00 |
$1,500.00 |
| 16 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,223 | SY |
$5.90 |
$7.00 |
$8.00 |
$15.22 |
$4.50 |
$6.75 |
$15.00 |
$15.00 |
| 17 | 619(C) 0924 |
SAWING PAVEMENT | 40 | LF |
$8.40 |
$5.00 |
$10.00 |
$12.68 |
$20.00 |
$22.00 |
$25.00 |
$12.00 |
| 18 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 880 | CY |
$8.40 |
$5.00 |
$10.00 |
$14.58 |
$27.00 |
$13.00 |
$18.00 |
$25.00 |
| 19 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 171 | CY |
$17.50 |
$30.00 |
$20.00 |
$5.00 |
$42.00 |
$17.50 |
$45.00 |
$25.00 |
| 20 | 509(A) 1326 |
CLASS AA CONCRETE | 499.2 | CY |
$515.00 |
$523.00 |
$600.00 |
$573.27 |
$660.00 |
$697.50 |
$685.00 |
$970.00 |
| 21 | 511(A) 1332 |
REINFORCING STEEL | 79,082 | LB |
$1.00 |
$0.9900 |
$1.00 |
$0.9000 |
$0.8000 |
$1.03 |
$1.15 |
$2.00 |
| 22 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 63 | TON |
$68.00 |
$73.00 |
$75.00 |
$95.08 |
$95.00 |
$86.50 |
$150.00 |
$85.00 |
| 23 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 21 | TON |
$48.60 |
$65.00 |
$70.00 |
$82.40 |
$81.00 |
$77.50 |
$145.00 |
$65.00 |
| 24 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$8,000.00 |
$8,000.00 |
$15,000.00 |
$12,590.45 |
$13,780.00 |
$17,000.00 |
$32,850.00 |
$35,000.00 |
| 25 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 2,000 | LF |
$1.50 |
$2.09 |
$2.10 |
$3.85 |
$1.90 |
$2.25 |
$2.40 |
$3.00 |
| 26 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,000.00 |
$3,586.00 |
$3,600.00 |
$4,200.00 |
$3,260.00 |
$4,260.00 |
$3,800.00 |
$5,000.00 |
| 27 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$5,390.00 |
$5,500.00 |
$4,900.00 |
$4,900.00 |
$6,900.00 |
$6,800.00 |
$8,000.00 |
| 28 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,000.00 |
$2,500.00 |
$3,000.00 |
$2,500.00 |
$3,000.00 |
$5,000.00 |
$7,850.00 |
$3,000.00 |
| 29 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$60,000.00 |
$67,000.00 |
$50,000.00 |
$78,216.62 |
$107,470.00 |
$64,000.00 |
$52,000.00 |
$75,000.00 |