Bid tab 190245

Let Aug 22, 2019 · Division 6 · Ellis Sign up free

‹ Aug 2019 results

BRIDGE AND APPROACHES COUNTY ROAD (EW-36): OVER DRY PRONG CREEK , 2.5 MILES EAST OF THE TEXAS STATE LINE NEAR CATESBY. PROJECT LENGTH = 0.189 MILE

Let date
Thursday, August 22, 2019
Contract
190245
J/P numbers
31125(04)
District
Division 6
County
Ellis
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (EW-36): OVER DRY PRONG CREEK , 2.5 MILES EAST OF THE TEXAS STATE LINE NEAR CATESBY. PROJECT LENGTH = 0.189 MILE
Project number
STP-223C(019)CI

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$648,429
1 Wyatt Contracting Low bidder $842,048 +29.9%
2 SEWELL BROS., INC. $855,079 +31.9% +1.5%
3 KLAVER CONSTRUCTION COMPANY, INC. $883,801 +36.3% +5.0%
4 Reece Construction Co, Inc. $988,690 +52.5% +17.4%
5 K & R BUILDERS, INC. $999,258 +54.1% +18.7%
6 Redlands Contracting, LLC $1,038,239 +60.1% +23.3%
7 EARTH BUILDERS, L.P. $1,230,996 +89.8% +46.2%

Bid tab: unit prices 29 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Wyatt Contracti…#2 SEWELL BROS., I…#3 KLAVER CONSTRUC…#4 Reece Construct…#5 K & R BUILDERS,…#6 Redlands Contra…#7 EARTH BUILDERS,…
1202(H) 0185 EARTHWORK1LSUM $25,000.00 $50,000.00 $33,000.00 $45,000.00 $85,470.00 $74,065.00 $78,000.00 $75,000.00
2221(C) 2801 TEMPORARY SILT FENCE2,280LF $2.50 $5.82 $6.00 $5.29 $5.29 $2.50 $5.25 $7.00
3221(F) 0100 TEMPORARY SILT DIKE238LF $11.50 $13.20 $24.00 $21.98 $21.98 $14.40 $32.00 $25.00
4230(A) 2806 SOLID SLAB SODDING7,655SY $3.00 $7.08 $8.00 $6.44 $6.44 $7.73 $8.50 $8.00
5233(A) 2817 VEGETATIVE MULCHING1.58AC $1,250.00 $770.00 $5,375.00 $4,885.00 $4,885.00 $1,200.00 $12,800.00 $6,500.00
6307(A) 4200 FLY ASH101TON $75.00 $115.50 $200.00 $105.00 $105.00 $129.00 $115.00 $200.00
7307(E) 4240 CEMENTITIOUS STABILIZED SUBGRADE2,667SY $3.00 $7.15 $5.00 $6.50 $6.50 $8.90 $7.45 $14.00
8402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E73TON $50.80 $56.00 $60.00 $100.00 $82.00 $67.00 $38.00 $90.00
9407(B) 0250 TACK COAT127GAL $4.90 $4.40 $5.50 $4.00 $4.00 $4.40 $4.00 $30.00
10408 5774 PRIME COAT940GAL $5.80 $5.50 $5.50 $5.00 $5.00 $5.50 $5.00 $10.00
11411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)583TON $121.70 $236.50 $208.00 $215.00 $215.00 $258.00 $218.00 $150.00
12411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)280TON $131.70 $258.50 $218.00 $235.00 $235.00 $282.00 $240.00 $150.00
13509(D) 0325 CLASS C CONCRETE10CY $376.00 $300.00 $475.00 $400.00 $610.00 $420.00 $290.00 $600.00
14613(B) 4527 21" X 15" CORR. GALV. STEEL PIPE ARCH56LF $32.40 $38.00 $36.00 $57.04 $174.00 $31.00 $85.00 $100.00
15613(M) 7186 TYPE A4 CULVERT END TREATMENT2EA $1,240.30 $1,500.00 $1,800.00 $1,250.00 $2,204.00 $1,800.00 $1,285.00 $1,500.00
16619(B) 4728 REMOVAL OF ASPHALT PAVEMENT2,223SY $5.90 $7.00 $8.00 $15.22 $4.50 $6.75 $15.00 $15.00
17619(C) 0924 SAWING PAVEMENT40LF $8.40 $5.00 $10.00 $12.68 $20.00 $22.00 $25.00 $12.00
18202(A) 1301 UNCLASSIFIED EXCAVATION880CY $8.40 $5.00 $10.00 $14.58 $27.00 $13.00 $18.00 $25.00
19501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED171CY $17.50 $30.00 $20.00 $5.00 $42.00 $17.50 $45.00 $25.00
20509(A) 1326 CLASS AA CONCRETE499.2CY $515.00 $523.00 $600.00 $573.27 $660.00 $697.50 $685.00 $970.00
21511(A) 1332 REINFORCING STEEL79,082LB $1.00 $0.9900 $1.00 $0.9000 $0.8000 $1.03 $1.15 $2.00
22601(B) 1353 TYPE I-A PLAIN RIPRAP63TON $68.00 $73.00 $75.00 $95.08 $95.00 $86.50 $150.00 $85.00
23601(C) 1355 TYPE I-A FILTER BLANKET21TON $48.60 $65.00 $70.00 $82.40 $81.00 $77.50 $145.00 $65.00
24619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $8,000.00 $8,000.00 $15,000.00 $12,590.45 $13,780.00 $17,000.00 $32,850.00 $35,000.00
25856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)2,000LF $1.50 $2.09 $2.10 $3.85 $1.90 $2.25 $2.40 $3.00
26880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $3,000.00 $3,586.00 $3,600.00 $4,200.00 $3,260.00 $4,260.00 $3,800.00 $5,000.00
27642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $7,500.00 $5,390.00 $5,500.00 $4,900.00 $4,900.00 $6,900.00 $6,800.00 $8,000.00
28220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $2,000.00 $2,500.00 $3,000.00 $2,500.00 $3,000.00 $5,000.00 $7,850.00 $3,000.00
29641 1399 MOBILIZATION1LSUM $60,000.00 $67,000.00 $50,000.00 $78,216.62 $107,470.00 $64,000.00 $52,000.00 $75,000.00