| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$17,850.00 |
$15,000.00 |
$18,550.00 |
$6,464.00 |
$45,000.00 |
$17,500.00 |
$15,300.00 |
$35,200.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 23,012 | CY |
$7.00 |
$8.24 |
$7.25 |
$6.90 |
$8.10 |
$9.00 |
$8.88 |
$7.95 |
$6.60 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$15,750.00 |
$21,500.00 |
$30,740.00 |
$15,080.00 |
$10,487.00 |
$32,500.00 |
$24,550.00 |
$18,700.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,096 | LF |
$2.00 |
$1.20 |
$1.20 |
$1.20 |
$1.20 |
$2.25 |
$1.50 |
$1.35 |
$1.25 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 224 | LF |
$8.00 |
$4.08 |
$4.10 |
$4.15 |
$4.15 |
$7.00 |
$4.65 |
$13.05 |
$4.28 |
| 6 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 37 | CY |
$90.00 |
$105.00 |
$100.00 |
$116.60 |
$95.00 |
$90.00 |
$55.00 |
$125.00 |
$113.58 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 923 | LF |
$2.00 |
$1.20 |
$1.20 |
$1.20 |
$1.20 |
$1.20 |
$1.35 |
$1.37 |
$1.25 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 31,317 | SY |
$1.50 |
$1.20 |
$1.20 |
$1.20 |
$1.20 |
$1.15 |
$1.55 |
$1.37 |
$1.25 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 7 | AC |
$150.00 |
$367.50 |
$350.00 |
$371.00 |
$374.50 |
$360.00 |
$425.00 |
$577.00 |
$385.00 |
| 10 | 241 2832 |
MOWING | 13 | AC |
$80.00 |
$47.25 |
$50.00 |
$47.70 |
$48.20 |
$47.00 |
$55.00 |
$68.45 |
$49.50 |
| 11 | 307(K) 4300 |
STABILIZED SUBGRADE | 19,293 | SY |
$8.00 |
$6.09 |
$7.00 |
$6.65 |
$12.70 |
$7.00 |
$6.33 |
$5.80 |
$6.38 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 157 | TON |
$35.00 |
$30.56 |
$30.00 |
$47.70 |
$30.20 |
$33.00 |
$27.50 |
$35.00 |
$38.50 |
| 13 | 407(B) 0250 |
TACK COAT | 3,459 | GAL |
$3.00 |
$2.29 |
$3.70 |
$3.55 |
$3.70 |
$3.60 |
$4.25 |
$3.50 |
$3.85 |
| 14 | 408 5774 |
PRIME COAT | 7,141 | GAL |
$6.00 |
$4.11 |
$4.70 |
$3.55 |
$6.75 |
$4.51 |
$4.99 |
$4.50 |
$4.95 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 7,316 | TON |
$90.00 |
$74.14 |
$84.00 |
$90.00 |
$79.50 |
$83.00 |
$83.90 |
$80.00 |
$88.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,602 | TON |
$90.00 |
$83.94 |
$85.00 |
$104.00 |
$76.50 |
$86.00 |
$89.70 |
$82.50 |
$90.75 |
| 17 | 412 5267 |
COLD MILLING PAVEMENT | 3,656 | SY |
$4.00 |
$5.13 |
$5.00 |
$5.50 |
$6.10 |
$5.15 |
$5.55 |
$3.50 |
$5.50 |
| 18 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 13 | CY |
$70.00 |
$52.50 |
$50.00 |
$21.20 |
$21.40 |
$40.00 |
$25.00 |
$16.00 |
$55.00 |
| 19 | 509(A) 0319 |
CLASS AA CONCRETE | 165 | CY |
$500.00 |
$425.72 |
$400.00 |
$382.00 |
$394.00 |
$550.00 |
$425.00 |
$600.00 |
$485.52 |
| 20 | 509(D) 0325 |
CLASS C CONCRETE | 132 | CY |
$300.00 |
$334.16 |
$300.00 |
$275.50 |
$321.00 |
$280.00 |
$333.00 |
$350.00 |
$363.80 |
| 21 | 511(A) 0332 |
REINFORCING STEEL | 27,078 | LB |
$1.00 |
$1.07 |
$0.9500 |
$1.00 |
$1.05 |
$1.20 |
$1.55 |
$1.15 |
$1.04 |
| 22 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 207 | TON |
$55.00 |
$47.88 |
$44.00 |
$47.70 |
$48.50 |
$40.00 |
$55.00 |
$55.00 |
$55.00 |
| 23 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 118 | LF |
$110.00 |
$121.80 |
$82.00 |
$143.10 |
$107.50 |
$120.00 |
$92.00 |
$80.00 |
$88.00 |
| 24 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 727 | LF |
$27.00 |
$29.03 |
$26.00 |
$31.85 |
$27.50 |
$33.00 |
$38.33 |
$34.50 |
$37.95 |
| 25 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 370 | LF |
$33.00 |
$33.76 |
$35.00 |
$37.10 |
$36.60 |
$41.00 |
$47.54 |
$40.00 |
$44.00 |
| 26 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 34 | LF |
$38.00 |
$40.53 |
$45.00 |
$42.40 |
$46.30 |
$50.00 |
$52.68 |
$44.50 |
$48.95 |
| 27 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 375 | LF |
$20.00 |
$16.80 |
$20.00 |
$9.55 |
$21.60 |
$17.00 |
$12.25 |
$18.00 |
$11.00 |
| 28 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 125 | LF |
$15.00 |
$16.80 |
$25.00 |
$15.90 |
$10.80 |
$17.00 |
$12.25 |
$16.00 |
$11.00 |
| 29 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 8 | EA |
$1,300.00 |
$1,522.50 |
$1,750.00 |
$954.00 |
$2,140.00 |
$950.00 |
$1,498.00 |
$1,650.00 |
$1,485.00 |
| 30 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$1,575.00 |
$1,950.00 |
$1,060.00 |
$2,997.00 |
$1,550.00 |
$1,999.00 |
$1,800.00 |
$1,980.00 |
| 31 | 613(M) 7202 |
TYPE BB6 CULVERT END TREATMENT | 2 | EA |
$2,600.00 |
$1,890.00 |
$2,750.00 |
$2,120.00 |
$3,211.00 |
$1,900.00 |
$4,122.00 |
$1,900.00 |
$3,575.00 |
| 32 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$6,500.00 |
$5,250.00 |
$5,000.00 |
$19,080.00 |
$8,618.00 |
$5,690.00 |
$4,750.00 |
$3,500.00 |
$3,850.00 |
| 33 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 111 | SY |
$5.00 |
$7.35 |
$15.00 |
$66.35 |
$21.60 |
$15.00 |
$100.00 |
$10.00 |
$11.00 |
| 34 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 13,858 | SY |
$5.00 |
$4.63 |
$5.00 |
$3.75 |
$6.70 |
$5.75 |
$2.12 |
$5.00 |
$6.60 |
| 35 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 625 | LF |
$5.00 |
$2.10 |
$4.00 |
$4.20 |
$5.10 |
$3.50 |
$6.00 |
$10.00 |
$5.50 |
| 36 | 619(C) 0924 |
SAWING PAVEMENT | 1,207 | LF |
$5.00 |
$5.25 |
$5.00 |
$4.20 |
$9.75 |
$3.00 |
$7.00 |
$5.00 |
$5.50 |
| 37 | 624(A) 4281 |
FENCE-STYLE WWF | 830 | LF |
$8.00 |
$7.35 |
$7.00 |
$6.75 |
$6.85 |
$6.65 |
$6.25 |
$6.40 |
$7.04 |
| 38 | 624(B) 4467 |
GATES-STYLE WWF (4.5'HIGH X 18' LONG) | 1 | EA |
$500.00 |
$1,575.00 |
$1,450.00 |
$1,457.50 |
$1,472.00 |
$1,397.00 |
$1,222.00 |
$1,375.00 |
$1,512.50 |
| 39 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 4,647 | LF |
$5.00 |
$6.14 |
$5.50 |
$5.40 |
$5.45 |
$5.25 |
$5.86 |
$5.10 |
$5.60 |
| 40 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 771 | LF |
$5.00 |
$6.56 |
$6.20 |
$6.00 |
$6.05 |
$5.90 |
$6.11 |
$5.65 |
$6.22 |
| 41 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 4,232 | CY |
$10.00 |
$5.25 |
$7.25 |
$21.20 |
$8.10 |
$10.00 |
$12.22 |
$8.50 |
$11.00 |
| 42 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 442 | CY |
$25.00 |
$31.50 |
$15.00 |
$21.20 |
$21.40 |
$40.00 |
$12.22 |
$18.00 |
$22.00 |
| 43 | 509(A) 1326 |
CLASS AA CONCRETE | 905.1 | CY |
$475.00 |
$344.24 |
$385.00 |
$329.75 |
$369.00 |
$365.00 |
$395.00 |
$650.00 |
$595.52 |
| 44 | 511(A) 1332 |
REINFORCING STEEL | 142,880 | LB |
$1.00 |
$0.9900 |
$0.9500 |
$1.00 |
$0.9600 |
$1.10 |
$1.55 |
$1.15 |
$1.07 |
| 45 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$7,875.00 |
$15,000.00 |
$21,200.00 |
$32,105.00 |
$45,000.00 |
$48,000.00 |
$20,000.00 |
$82,500.00 |
| 46 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 9,034 | LF |
$0.3000 |
$0.2100 |
$0.2200 |
$0.2000 |
$0.2100 |
$0.2100 |
$0.2500 |
$0.2000 |
$0.2200 |
| 47 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 1,100 | LF |
$1.60 |
$2.63 |
$1.05 |
$2.65 |
$2.70 |
$1.05 |
$1.25 |
$2.50 |
$2.75 |
| 48 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 500 | EA |
$1.50 |
$0.9500 |
$1.05 |
$0.9500 |
$0.9600 |
$1.05 |
$1.25 |
$0.9000 |
$0.9900 |
| 49 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,100 | LF |
$1.10 |
$2.63 |
$0.8300 |
$2.65 |
$2.70 |
$0.8200 |
$1.00 |
$2.50 |
$2.75 |
| 50 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 15,240 | SD |
$0.5000 |
$0.1100 |
$0.3600 |
$0.1000 |
$0.1100 |
$0.3600 |
$1.00 |
$0.1000 |
$0.1100 |
| 51 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 10,245 | SD |
$1.00 |
$0.1100 |
$0.2700 |
$0.1000 |
$0.1100 |
$0.2600 |
$1.00 |
$0.1000 |
$0.1100 |
| 52 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,760 | SD |
$1.80 |
$0.1100 |
$1.52 |
$0.1000 |
$0.1100 |
$1.55 |
$2.00 |
$0.1000 |
$0.1100 |
| 53 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,370 | SD |
$0.8000 |
$4.73 |
$1.52 |
$4.75 |
$4.80 |
$1.55 |
$2.00 |
$4.50 |
$4.95 |
| 54 | 880(C) 8848 |
WING BARRICADES | 1,440 | SD |
$0.3000 |
$1.37 |
$0.3000 |
$1.35 |
$1.40 |
$0.2600 |
$0.3300 |
$1.30 |
$1.43 |
| 55 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,560 | SD |
$0.3000 |
$0.4200 |
$0.5200 |
$0.4000 |
$0.4300 |
$0.5100 |
$0.6500 |
$0.4000 |
$0.4400 |
| 56 | 880(F) 8878 |
DRUMS | 15,570 | SD |
$0.3000 |
$0.0500 |
$0.6600 |
$0.0500 |
$0.0500 |
$0.6700 |
$0.7500 |
$0.0500 |
$0.0600 |
| 57 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 656 | SD |
$12.00 |
$21.00 |
$11.00 |
$21.20 |
$21.40 |
$10.25 |
$15.00 |
$20.00 |
$22.00 |
| 58 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 16 | EAGP |
$450.00 |
$551.25 |
$652.00 |
$556.50 |
$562.00 |
$670.00 |
$780.00 |
$525.00 |
$577.50 |
| 59 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 6,190 | LF |
$0.5000 |
$0.4300 |
$0.5200 |
$0.4500 |
$0.4400 |
$0.5200 |
$0.6000 |
$0.4100 |
$0.4500 |
| 60 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 29 | EA |
$50.00 |
$42.00 |
$105.00 |
$42.40 |
$42.80 |
$103.00 |
$125.00 |
$40.00 |
$44.00 |
| 61 | 805(A) 8726 |
(PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 1 | LSUM |
$5,500.00 |
$5,250.00 |
$5,500.00 |
$5,300.00 |
$5,351.00 |
$5,100.00 |
$25,000.00 |
$5,000.00 |
$5,500.00 |
| 62 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 8 | EA |
$65.00 |
$131.25 |
$255.00 |
$132.50 |
$134.00 |
$102.00 |
$300.00 |
$125.00 |
$137.50 |
| 63 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 184 | SF |
$20.00 |
$36.75 |
$17.00 |
$37.10 |
$37.50 |
$16.25 |
$17.50 |
$35.00 |
$38.50 |
| 64 | 850(D) 8121 |
SPECIAL SIGNS | 4 | EA |
$175.00 |
$2,189.25 |
$2,500.00 |
$2,110.00 |
$2,231.00 |
$2,450.00 |
$3,000.00 |
$2,085.00 |
$2,293.50 |
| 65 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 112 | LF |
$18.00 |
$23.10 |
$18.50 |
$23.30 |
$23.50 |
$18.50 |
$23.00 |
$22.00 |
$24.20 |
| 66 | 851(C) 8324 |
2" SQUARE TUBE POST | 210 | LF |
$10.00 |
$6.83 |
$11.50 |
$6.90 |
$6.95 |
$11.25 |
$15.00 |
$6.50 |
$7.15 |
| 67 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 13,850 | LF |
$0.9000 |
$0.5100 |
$0.6600 |
$0.6000 |
$0.5200 |
$0.6600 |
$0.8600 |
$0.4900 |
$0.5400 |
| 68 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 481 | LF |
$1.80 |
$0.6800 |
$2.10 |
$0.7000 |
$0.7000 |
$2.05 |
$2.50 |
$0.6500 |
$0.7200 |
| 69 | 855(A) 8818 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 519 | LF |
$4.00 |
$2.31 |
$3.05 |
$2.30 |
$2.35 |
$3.10 |
$3.60 |
$2.20 |
$2.42 |
| 70 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 26 | LF |
$10.00 |
$10.50 |
$22.00 |
$10.60 |
$10.70 |
$20.50 |
$30.00 |
$10.00 |
$11.00 |
| 71 | 855(B) 8824 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 12 | EA |
$640.00 |
$47.25 |
$205.00 |
$47.70 |
$48.20 |
$205.00 |
$250.00 |
$45.00 |
$49.50 |
| 72 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$21,000.00 |
$15,800.00 |
$14,310.00 |
$21,030.00 |
$19,650.00 |
$22,500.00 |
$9,730.00 |
$15,829.00 |
| 73 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$3,000.00 |
$13,095.00 |
$3,413.00 |
$1,750.00 |
$4,250.00 |
$1,275.00 |
$6,050.00 |
| 74 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$96,302.00 |
$115,000.00 |
$145,000.00 |
$128,117.56 |
$154,000.00 |
$127,500.00 |
$159,000.00 |
$162,028.81 |