| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,761.36 | CY |
$9.07 |
$10.30 |
$15.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$2.23 |
$3.55 |
$3.44 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 168 | LF |
$8.81 |
$24.50 |
$23.80 |
| 4 | 221(K) 0600 |
TEMPORARY FIBER LOG | 32 | LF |
$30.00 |
$18.40 |
$17.88 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 22,980 | SY |
$2.25 |
$4.45 |
$4.19 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.75 | AC |
$302.35 |
$2,975.00 |
$2,888.00 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 482.26 | CY |
$86.01 |
$87.50 |
$85.00 |
| 8 | 307(A) 4200 |
FLY ASH | 2,220.38 | TON |
$82.00 |
$88.50 |
$86.00 |
| 9 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 44,108.75 | SY |
$3.17 |
$2.85 |
$2.75 |
| 10 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 14,880.9 | LF |
$5.00 |
$5.70 |
$10.00 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 760.52 | TON |
$46.84 |
$47.50 |
$50.00 |
| 12 | 407(B) 0250 |
TACK COAT | 3,720.69 | GAL |
$3.22 |
$3.90 |
$2.00 |
| 13 | 408 5774 |
PRIME COAT | 14,833.9 | GAL |
$4.18 |
$3.75 |
$2.50 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 12,848.07 | TON |
$78.00 |
$80.30 |
$88.00 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,408.22 | TON |
$88.00 |
$92.00 |
$95.00 |
| 16 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 3 | EAGP |
$1,400.00 |
$1,236.00 |
$1,500.00 |
| 17 | 509(B) 0321 |
CLASS A CONCRETE | 95.45 | CY |
$547.74 |
$740.00 |
$550.00 |
| 18 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 12.47 | CY |
$635.12 |
$927.00 |
$900.00 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$398.28 |
$463.50 |
$450.00 |
| 20 | 511(A) 0332 |
REINFORCING STEEL | 2,513 | LB |
$1.35 |
$2.05 |
$2.00 |
| 21 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 20 | TON |
$85.35 |
$66.95 |
$65.00 |
| 22 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 65.44 | SY |
$69.36 |
$83.50 |
$81.06 |
| 23 | 610(G) 0617 |
ASPHALT DRIVEWAY | 114.31 | TON |
$82.82 |
$176.10 |
$150.00 |
| 24 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 1 | EA |
$4,700.00 |
$4,841.00 |
$4,700.00 |
| 25 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$2,758.91 |
$3,090.00 |
$3,000.00 |
| 26 | 611(G) 6006 |
INLET (SMD-TYPE 2B) | 1 | EA |
$3,304.41 |
$3,605.00 |
$3,500.00 |
| 27 | 611(L) 0487 |
JUNCTION BOXES | 160.07 | CF |
$102.61 |
$113.30 |
$110.00 |
| 28 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 53 | LF |
$120.38 |
$151.40 |
$147.00 |
| 29 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 416 | LF |
$102.75 |
$142.10 |
$138.00 |
| 30 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 61 | LF |
$128.56 |
$166.85 |
$162.00 |
| 31 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 856 | LF |
$26.04 |
$30.90 |
$30.00 |
| 32 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 120 | LF |
$48.64 |
$41.20 |
$40.00 |
| 33 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$15,450.00 |
$2,500.00 |
| 34 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 414 | SY |
$17.00 |
$7.20 |
$7.00 |
| 35 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 510.33 | SY |
$7.27 |
$6.15 |
$6.00 |
| 36 | 619(C) 0924 |
SAWING PAVEMENT | 147 | LF |
$6.55 |
$6.15 |
$6.00 |
| 37 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 77.87 | SF |
$24.93 |
$41.20 |
$40.00 |
| 38 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 13,705 | LF |
$0.7000 |
$1.00 |
$1.00 |
| 39 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$8,897.31 |
$6,180.00 |
$6,000.00 |
| 40 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$34,800.00 |
$33,800.00 |
| 41 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,572.46 |
$10,750.00 |
$14,000.00 |
| 42 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$125,000.00 |
$192,425.00 |
$160,000.00 |