| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,135.00 |
$219,400.60 |
$25,000.00 |
$170,000.00 |
$250,000.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 101,932 | CY |
$6.00 |
$7.50 |
$12.50 |
$9.75 |
$14.00 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 5,452 | CY |
$8.00 |
$5.00 |
$1.00 |
$8.50 |
$20.00 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$11,045.00 |
$75,000.00 |
$25,000.00 |
$104,000.00 |
$350,000.00 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 25,957 | LF |
$1.95 |
$2.10 |
$2.10 |
$2.15 |
$3.50 |
| 60 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,260 | LF |
$10.00 |
$13.00 |
$16.00 |
$13.25 |
$10.00 |
| 70 | 229 4318 |
DITCH LINER PROTECTION | 2,029 | LF |
$2.25 |
$7.00 |
$6.00 |
$6.50 |
$4.00 |
| 80 | 230(A) 2806 |
SOLID SLAB SODDING | 310,952 | SY |
$2.50 |
$2.30 |
$0.2500 |
$2.40 |
$3.00 |
| 90 | 233(A) 2817 |
VEGETATIVE MULCHING | 64.25 | AC |
$1,000.00 |
$900.00 |
$100.00 |
$950.00 |
$1,100.00 |
| 100 | 241 2832 |
MOWING | 64.25 | AC |
$100.00 |
$400.00 |
$205.00 |
$366.00 |
$115.00 |
| 110 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 27,348 | CY |
$45.00 |
$43.00 |
$55.00 |
$55.50 |
$75.00 |
| 120 | 307(K) 4300 |
STABILIZED SUBGRADE | 119,824 | SY |
$4.00 |
$5.50 |
$7.75 |
$5.05 |
$4.50 |
| 121 | 310(B) 0149 |
SUBGRADE, METHOD B | 11,878 | SY |
$4.00 |
$1.25 |
$2.00 |
$2.50 |
$15.00 |
| 130 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 119,824 | SY |
$4.50 |
$3.00 |
$2.25 |
$5.90 |
$2.00 |
| 140 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 5,870 | TON |
$35.00 |
$18.00 |
$32.33 |
$55.50 |
$50.00 |
| 150 | 407(B) 0250 |
TACK COAT | 16,460 | GAL |
$3.25 |
$2.00 |
$3.33 |
$3.75 |
$4.00 |
| 160 | 409(A) 4242 |
FABRIC REINFORCEMENT | 1,518 | SY |
$7.00 |
$2.00 |
$10.00 |
$9.00 |
$5.00 |
| 170 | 409(B) 4268 |
BITUMINOUS BINDER | 304 | GAL |
$10.00 |
$3.00 |
$10.00 |
$16.00 |
$10.00 |
| 180 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 10,321 | TON |
$75.00 |
$66.00 |
$87.50 |
$94.00 |
$93.00 |
| 190 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 37,301 | TON |
$65.00 |
$62.00 |
$82.50 |
$82.00 |
$85.00 |
| 200 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 6,881 | TON |
$85.00 |
$74.00 |
$87.50 |
$103.00 |
$105.00 |
| 210 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,790 | TON |
$85.00 |
$69.00 |
$82.50 |
$98.00 |
$98.00 |
| 220 | 412 5267 |
COLD MILLING PAVEMENT | 11,125 | SY |
$3.00 |
$2.00 |
$2.75 |
$4.80 |
$3.50 |
| 230 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 9 | CY |
$35.00 |
$50.00 |
$25.00 |
$53.00 |
$300.00 |
| 240 | 509(A) 0319 |
CLASS AA CONCRETE | 27 | CY |
$700.00 |
$700.00 |
$995.00 |
$901.00 |
$800.00 |
| 250 | 509(D) 0325 |
CLASS C CONCRETE | 318 | CY |
$300.00 |
$600.00 |
$350.00 |
$424.00 |
$400.00 |
| 260 | 511(A) 0332 |
REINFORCING STEEL | 4,698 | LB |
$1.25 |
$1.30 |
$2.00 |
$2.10 |
$1.50 |
| 270 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 153 | LF |
$54.00 |
$55.00 |
$60.00 |
$63.00 |
$150.00 |
| 280 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 78 | LF |
$50.00 |
$65.00 |
$65.00 |
$71.75 |
$160.00 |
| 290 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 186 | LF |
$45.00 |
$65.00 |
$65.00 |
$63.60 |
$150.00 |
| 300 | 613(B) 4531 |
49" X 33" CORR. GALV. STEEL PIPE ARCH | 12 | LF |
$74.00 |
$135.00 |
$156.00 |
$255.75 |
$400.00 |
| 310 | 613(B) 4532 |
57" X 38" CORR. GALV. STEEL PIPE ARCH | 25 | LF |
$90.00 |
$135.00 |
$200.00 |
$192.80 |
$400.00 |
| 320 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 20 | EA |
$1,400.00 |
$1,200.00 |
$1,750.00 |
$3,180.00 |
$3,000.00 |
| 330 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$1,300.00 |
$2,000.00 |
$4,240.00 |
$4,500.00 |
| 340 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$2,100.00 |
$1,500.00 |
$2,250.00 |
$5,300.00 |
$5,000.00 |
| 350 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$17,825.00 |
$8,500.00 |
$12,500.00 |
$25,440.00 |
$25,000.00 |
| 360 | 619(B) 0291 |
REMOVAL OF HEADWALL | 1 | EA |
$2,000.00 |
$1,200.00 |
$2,500.00 |
$3,180.00 |
$2,500.00 |
| 370 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 7,973 | SY |
$6.50 |
$7.00 |
$3.00 |
$6.85 |
$10.00 |
| 380 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 90,494 | SY |
$5.00 |
$9.00 |
$2.50 |
$8.50 |
$15.00 |
| 390 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 4,459 | LF |
$3.40 |
$4.00 |
$2.25 |
$3.85 |
$2.50 |
| 400 | 619(C) 0924 |
SAWING PAVEMENT | 3,416 | LF |
$4.00 |
$4.00 |
$12.22 |
$6.35 |
$10.00 |
| 410 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 2,463 | LF |
$20.00 |
$25.00 |
$27.90 |
$18.10 |
$24.00 |
| 420 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 24 | EA |
$2,500.00 |
$2,800.00 |
$3,720.00 |
$3,975.00 |
$2,700.00 |
| 430 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 75 | EA |
$20.00 |
$16.00 |
$24.00 |
$14.60 |
$15.00 |
| 440 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 70,000 | LF |
$0.1500 |
$0.1500 |
$0.1400 |
$0.2000 |
$0.1900 |
| 450 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 70,000 | LF |
$0.2500 |
$0.1500 |
$0.1400 |
$0.1600 |
$0.1500 |
| 460 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 2,135 | EA |
$1.10 |
$1.00 |
$1.00 |
$0.6900 |
$0.6500 |
| 470 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,000 | LF |
$0.2000 |
$1.00 |
$1.20 |
$1.59 |
$1.50 |
| 480 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 5,460 | SD |
$6.30 |
$11.00 |
$1.20 |
$4.24 |
$4.00 |
| 490 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 420 | SD |
$20.00 |
$7.00 |
$5.99 |
$6.35 |
$6.00 |
| 500 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 6,000 | LF |
$23.35 |
$15.00 |
$1.00 |
$15.50 |
$15.00 |
| 510 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 30,000 | LF |
$3.50 |
$1.25 |
$1.00 |
$1.33 |
$2.00 |
| 520 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,620 | SD |
$0.3500 |
$0.3000 |
$0.3600 |
$1.59 |
$1.50 |
| 530 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 5,880 | SD |
$0.7000 |
$0.5000 |
$0.6000 |
$1.80 |
$1.70 |
| 540 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,090 | SD |
$1.35 |
$2.50 |
$3.00 |
$3.70 |
$3.50 |
| 550 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 5,460 | SD |
$0.6500 |
$1.00 |
$0.6000 |
$6.35 |
$6.00 |
| 560 | 880(C) 8848 |
WING BARRICADES | 840 | SD |
$2.00 |
$1.00 |
$1.20 |
$0.0200 |
$0.0200 |
| 570 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 6,510 | SD |
$0.3000 |
$2.00 |
$2.40 |
$0.8000 |
$0.7500 |
| 580 | 880(F) 8878 |
DRUMS | 18,900 | SD |
$0.2500 |
$0.2000 |
$0.2000 |
$0.0200 |
$0.0200 |
| 590 | 880(G) 8890 |
CHANNELIZER CONES | 27,720 | SD |
$0.3000 |
$0.3000 |
$0.3000 |
$0.4200 |
$0.4000 |
| 600 | 880(I) 8902 |
FLAGGER | 70 | SD |
$150.00 |
$150.00 |
$500.00 |
$267.00 |
$250.00 |
| 610 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 896 | SD |
$16.00 |
$10.00 |
$9.60 |
$8.50 |
$8.00 |
| 620 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 32,600 | LF |
$0.3000 |
$0.3000 |
$0.1800 |
$0.1900 |
$0.1800 |
| 630 | 413(A) 4870 |
RUMBLE STRIP-CENTERLINE HMA-CON | 16,300 | LF |
$0.3000 |
$0.3500 |
$0.2600 |
$0.3200 |
$0.3000 |
| 640 | 804(A) 2915 |
STRUCTURAL CONCRETE | 4.8 | CY |
$503.00 |
$400.00 |
$425.00 |
$318.00 |
$300.00 |
| 650 | 804(B) 2916 |
REINFORCING STEEL | 576 | LB |
$2.50 |
$3.00 |
$2.40 |
$2.40 |
$2.25 |
| 660 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 72 | EA |
$60.00 |
$35.00 |
$42.00 |
$106.00 |
$100.00 |
| 670 | 805(A) 8726 |
(PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 1 | LSUM |
$5,000.00 |
$15,000.00 |
$42,500.00 |
$11,660.00 |
$10,000.00 |
| 680 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 3 | EA |
$350.00 |
$500.00 |
$375.00 |
$265.00 |
$250.00 |
| 690 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 398.36 | SF |
$21.50 |
$20.00 |
$22.00 |
$19.10 |
$18.00 |
| 700 | 851(C) 8324 |
2" SQUARE TUBE POST | 932.5 | LF |
$9.50 |
$10.00 |
$10.80 |
$6.35 |
$6.00 |
| 710 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 75,000 | LF |
$0.6000 |
$0.7000 |
$0.7500 |
$0.8200 |
$0.5000 |
| 720 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 400 | LF |
$1.25 |
$2.00 |
$1.40 |
$1.38 |
$1.30 |
| 730 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 600 | LF |
$1.40 |
$3.00 |
$2.80 |
$1.50 |
$1.40 |
| 740 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 205 | LF |
$6.85 |
$6.00 |
$10.00 |
$5.30 |
$5.00 |
| 750 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 16 | EA |
$135.35 |
$200.00 |
$255.00 |
$291.50 |
$275.00 |
| 760 | 890 7700 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$24,000.00 |
$53,000.00 |
$52,000.00 |
$13,780.00 |
$13,000.00 |
| 770 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$110,000.00 |
$87,000.00 |
$125,000.00 |
$109,710.00 |
$60,000.00 |
| 780 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$15,000.00 |
$2,500.00 |
$16,350.00 |
$5,000.00 |
| 790 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$6,500.00 |
$25,000.00 |
$27,250.00 |
$5,000.00 |
| 800 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$450,000.00 |
$490,000.00 |
$525,000.00 |
$610,400.00 |
$375,000.00 |