| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$18,000.00 |
$15,900.00 |
$85,000.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 36,695 | CY |
$9.75 |
$4.25 |
$9.00 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 87,916 | CY |
$10.25 |
$8.50 |
$9.00 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$41,000.00 |
$68,900.00 |
$100,000.00 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 30,700 | LF |
$3.20 |
$3.05 |
$2.89 |
| 60 | 221(F) 0100 |
TEMPORARY SILT DIKE | 4,109 | LF |
$13.40 |
$18.95 |
$17.89 |
| 70 | 230(A) 2806 |
SOLID SLAB SODDING | 173,888 | SY |
$4.10 |
$3.70 |
$3.38 |
| 80 | 232(A) 2813 |
SEEDING METHOD A | 0.64 | AC |
$35,000.00 |
$5,178.00 |
$4,885.00 |
| 90 | 233(A) 2817 |
VEGETATIVE MULCHING | 37.22 | AC |
$1,960.00 |
$4,768.00 |
$4,498.00 |
| 100 | 234(A) 2824 |
FERTILIZING (10-20-10) | 16.12 | TON |
$920.00 |
$2,094.00 |
$1,975.00 |
| 110 | 241 2832 |
MOWING | 35.28 | AC |
$215.00 |
$413.00 |
$389.00 |
| 120 | 307(K) 4300 |
STABILIZED SUBGRADE | 57,634 | SY |
$7.05 |
$5.40 |
$7.50 |
| 130 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 240 | TON |
$61.00 |
$35.00 |
$65.00 |
| 140 | 407(B) 0250 |
TACK COAT | 35,452 | GAL |
$2.05 |
$3.50 |
$2.00 |
| 150 | 408 5774 |
PRIME COAT | 20,422 | GAL |
$2.75 |
$3.50 |
$2.60 |
| 160 | 409(A) 4242 |
FABRIC REINFORCEMENT | 23,233.93 | SY |
$3.10 |
$2.15 |
$2.20 |
| 170 | 409(B) 4268 |
BITUMINOUS BINDER | 5,808.48 | GAL |
$3.87 |
$3.50 |
$3.50 |
| 180 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 12,280.12 | TON |
$87.00 |
$97.25 |
$109.00 |
| 190 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 17,339.27 | TON |
$83.60 |
$78.80 |
$100.00 |
| 200 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 7,403.51 | TON |
$93.10 |
$97.85 |
$115.00 |
| 210 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,181.45 | TON |
$89.50 |
$91.05 |
$105.00 |
| 220 | 412 5267 |
COLD MILLING PAVEMENT | 1,511.1 | SY |
$6.15 |
$7.95 |
$5.50 |
| 230 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 201 | CY |
$38.50 |
$9.55 |
$35.00 |
| 240 | 509(B) 0321 |
CLASS A CONCRETE | 80 | CY |
$610.00 |
$541.00 |
$1,185.00 |
| 250 | 509(D) 0325 |
CLASS C CONCRETE | 40 | CY |
$430.00 |
$398.00 |
$220.00 |
| 260 | 511(A) 0332 |
REINFORCING STEEL | 9,651 | LB |
$1.25 |
$1.10 |
$1.42 |
| 270 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 302 | LF |
$78.24 |
$74.20 |
$114.00 |
| 280 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 33 | LF |
$85.10 |
$121.00 |
$104.00 |
| 290 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 312 | LF |
$41.60 |
$31.80 |
$58.65 |
| 300 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 11 | EA |
$1,720.00 |
$1,219.00 |
$1,880.00 |
| 310 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 1 | EA |
$2,200.00 |
$2,385.00 |
$2,100.00 |
| 320 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 5 | EA |
$1,400.00 |
$1,484.00 |
$2,520.00 |
| 330 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$21,400.00 |
$1,060.00 |
$25,000.00 |
| 340 | 619(B) 4725 |
REMOVAL OF FENCE | 38,463 | LF |
$3.05 |
$0.9500 |
$2.00 |
| 350 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 10,977.67 | SY |
$23.60 |
$4.75 |
$3.50 |
| 360 | 619(B) 8610 |
REMOVE AND RESET CATTLE GUARD | 2 | EA |
$2,700.00 |
$1,908.00 |
$2,000.00 |
| 370 | 619(C) 0924 |
SAWING PAVEMENT | 48,835 | LF |
$2.70 |
$1.95 |
$3.50 |
| 380 | 624 4100 |
(PL) ORNAMENTAL FENCE | 68 | LF |
$106.35 |
$132.50 |
$125.00 |
| 390 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 32,919 | LF |
$5.10 |
$5.25 |
$4.95 |
| 400 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 1 | EA |
$155.00 |
$53.00 |
$225.00 |
| 410 | 629(C) 4960 |
MAILBOX | 1 | EA |
$52.00 |
$26.50 |
$30.00 |
| 420 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 1 | EA |
$41.00 |
$26.50 |
$45.00 |
| 430 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 6,588 | EA |
$0.6500 |
$0.4000 |
$0.7200 |
| 440 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 460 | SD |
$12.00 |
$10.60 |
$6.00 |
| 450 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,760 | SD |
$0.3200 |
$0.2500 |
$1.20 |
| 460 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,300 | SD |
$1.50 |
$1.60 |
$1.20 |
| 470 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,600 | SD |
$2.00 |
$0.1100 |
$1.20 |
| 480 | 880(C) 8848 |
WING BARRICADES | 460 | SD |
$2.50 |
$1.05 |
$0.0200 |
| 490 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,530 | SD |
$0.7500 |
$2.10 |
$0.3000 |
| 500 | 880(F) 8878 |
DRUMS | 2,530 | SD |
$0.2700 |
$0.2700 |
$0.0200 |
| 510 | 880(G) 8890 |
CHANNELIZER CONES | 22,770 | SD |
$0.3200 |
$0.2700 |
$0.8500 |
| 520 | 880(I) 8902 |
FLAGGER | 170 | SD |
$150.00 |
$132.45 |
$450.00 |
| 530 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 488 | SD |
$17.00 |
$15.90 |
$6.00 |
| 540 | 413(A) 4870 |
RUMBLE STRIP-CENTERLINE HMA-CON | 24,023 | LF |
$0.2600 |
$0.1700 |
$0.2600 |
| 550 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 48,046 | LF |
$0.2100 |
$0.1700 |
$0.2300 |
| 560 | 804(A) 2915 |
STRUCTURAL CONCRETE | 2.28 | CY |
$950.00 |
$318.00 |
$400.00 |
| 570 | 804(B) 2916 |
REINFORCING STEEL | 318 | LB |
$3.00 |
$2.10 |
$2.25 |
| 580 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 235.54 | SF |
$40.00 |
$21.20 |
$26.00 |
| 590 | 851(A) 3207 |
6"@15 GALV.STEEL WIDE FLANGE BEAM POST | 63 | LF |
$30.00 |
$37.10 |
$36.00 |
| 600 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 104.5 | LF |
$8.00 |
$10.60 |
$7.00 |
| 610 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 73,577 | LF |
$0.6000 |
$0.4100 |
$0.4600 |
| 620 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$62,000.00 |
$68,750.00 |
$65,000.00 |
| 630 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$25,000.00 |
$15,805.00 |
$25,000.00 |
| 640 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$310,000.00 |
$408,000.00 |
$700,000.00 |