| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$81,894.64 |
$61,100.00 |
$37,240.00 |
$297,000.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 30,153 | CY |
$6.00 |
$6.95 |
$8.90 |
$9.60 |
$12.80 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 29,419 | CY |
$8.50 |
$16.59 |
$10.45 |
$12.70 |
$15.50 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$60,000.00 |
$100,000.00 |
$73,150.00 |
$210,010.00 |
$250,000.00 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 36,065 | LF |
$3.00 |
$2.00 |
$2.40 |
$1.75 |
$2.02 |
| 60 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,904 | LF |
$15.00 |
$12.00 |
$13.45 |
$15.20 |
$12.25 |
| 70 | 229 4318 |
DITCH LINER PROTECTION | 300 | LF |
$3.00 |
$4.70 |
$2.40 |
$2.00 |
$7.00 |
| 80 | 230(A) 2806 |
SOLID SLAB SODDING | 316,306 | SY |
$5.00 |
$2.35 |
$2.60 |
$2.65 |
$2.50 |
| 90 | 233(A) 2817 |
VEGETATIVE MULCHING | 43.66 | AC |
$1,750.00 |
$900.00 |
$1,030.00 |
$911.00 |
$300.00 |
| 100 | 241 2832 |
MOWING | 87.32 | AC |
$80.00 |
$60.00 |
$193.00 |
$101.00 |
$60.00 |
| 110 | 307(K) 4300 |
STABILIZED SUBGRADE | 88,317 | SY |
$2.00 |
$5.90 |
$6.65 |
$6.50 |
$4.50 |
| 120 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 783 | TON |
$26.00 |
$42.56 |
$43.25 |
$87.30 |
$68.00 |
| 130 | 407(B) 0250 |
TACK COAT | 35,283 | GAL |
$3.50 |
$2.13 |
$3.05 |
$3.55 |
$1.00 |
| 140 | 408 5774 |
PRIME COAT | 31,578 | GAL |
$4.50 |
$2.41 |
$3.05 |
$3.55 |
$1.00 |
| 150 | 409(A) 4242 |
FABRIC REINFORCEMENT | 32,115 | SY |
$1.75 |
$1.70 |
$2.00 |
$2.15 |
$1.25 |
| 160 | 409(B) 4268 |
BITUMINOUS BINDER | 6,424 | GAL |
$3.50 |
$3.95 |
$3.70 |
$6.00 |
$5.00 |
| 170 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 29,366 | TON |
$80.00 |
$82.03 |
$82.50 |
$86.90 |
$86.25 |
| 180 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 27,451 | TON |
$70.00 |
$76.53 |
$74.00 |
$79.90 |
$81.00 |
| 190 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 19,390 | TON |
$84.00 |
$89.04 |
$86.90 |
$87.90 |
$91.00 |
| 200 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 839 | TON |
$74.00 |
$116.95 |
$92.75 |
$116.50 |
$190.00 |
| 210 | 411(J) 6410 |
(SP) RICH INTERMEDIATE LAYER | 5,611 | TON |
$86.00 |
$104.27 |
$98.20 |
$114.50 |
$100.00 |
| 220 | 412 5267 |
COLD MILLING PAVEMENT | 101,925 | SY |
$2.50 |
$0.9000 |
$4.00 |
$1.65 |
$0.5800 |
| 230 | 509(A) 0319 |
CLASS AA CONCRETE | 765 | CY |
$450.00 |
$580.00 |
$508.00 |
$612.00 |
$625.00 |
| 240 | 509(D) 0325 |
CLASS C CONCRETE | 80 | CY |
$300.00 |
$282.00 |
$230.00 |
$285.50 |
$300.00 |
| 250 | 511(A) 0332 |
REINFORCING STEEL | 110,991 | LB |
$1.40 |
$1.05 |
$1.15 |
$1.10 |
$1.25 |
| 260 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 545 | SY |
$85.00 |
$68.95 |
$78.40 |
$69.80 |
$98.00 |
| 270 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 94 | LF |
$60.00 |
$73.50 |
$83.60 |
$74.40 |
$81.00 |
| 280 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 130 | LF |
$70.00 |
$96.50 |
$115.00 |
$97.70 |
$112.00 |
| 290 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 1,294 | LF |
$35.00 |
$38.65 |
$40.00 |
$44.30 |
$38.25 |
| 300 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 112 | LF |
$45.00 |
$45.48 |
$44.00 |
$47.80 |
$43.00 |
| 310 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 90 | LF |
$75.00 |
$77.11 |
$83.50 |
$77.50 |
$82.00 |
| 320 | 613(C) 5230 |
42" X 29" PRECOATED CORR. STL. PIPE ARCH | 128 | LF |
$60.00 |
$63.97 |
$68.00 |
$58.00 |
$72.00 |
| 330 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 59 | EA |
$1,200.00 |
$1,280.00 |
$940.50 |
$1,295.00 |
$1,300.00 |
| 340 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 8 | EA |
$1,850.00 |
$1,492.00 |
$1,045.00 |
$1,510.00 |
$1,500.00 |
| 350 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 8 | EA |
$2,050.00 |
$2,445.00 |
$1,254.00 |
$2,474.00 |
$2,500.00 |
| 360 | 613(M) 7190 |
TYPE E4 CULVERT END TREATMENT | 2 | EA |
$2,500.00 |
$2,715.00 |
$1,568.00 |
$2,748.00 |
$2,750.00 |
| 370 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$81,350.23 |
$55,910.00 |
$40,595.00 |
$250,000.00 |
| 380 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 22,349 | SY |
$3.80 |
$4.05 |
$4.00 |
$4.20 |
$2.50 |
| 390 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 521 | SY |
$5.00 |
$27.27 |
$15.15 |
$25.70 |
$15.00 |
| 400 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 3,428 | SY |
$3.50 |
$8.64 |
$8.35 |
$23.20 |
$8.50 |
| 410 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 23,969 | LF |
$8.50 |
$7.11 |
$7.35 |
$6.95 |
$4.00 |
| 420 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 2 | EA |
$150.00 |
$100.65 |
$418.00 |
$152.00 |
$1,500.00 |
| 430 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 68,160 | LF |
$0.2000 |
$0.1600 |
$0.2000 |
$0.1600 |
$0.1100 |
| 440 | 413(A) 4870 |
RUMBLE STRIP-CENTERLINE HMA-CON | 42,080 | LF |
$0.2000 |
$0.1400 |
$0.2000 |
$0.1900 |
$0.1100 |
| 450 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 18 | EA |
$300.00 |
$225.00 |
$235.00 |
$202.50 |
$500.00 |
| 460 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 101,374 | LF |
$0.5000 |
$0.4300 |
$0.4500 |
$0.3500 |
$0.4500 |
| 470 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 72,264 | LF |
$0.2000 |
$0.1200 |
$0.1500 |
$0.1300 |
$0.1200 |
| 480 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 36,132 | EA |
$0.5000 |
$0.3300 |
$0.3500 |
$0.5100 |
$0.3300 |
| 490 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 72,264 | LF |
$0.1500 |
$0.1400 |
$0.3000 |
$0.2400 |
$0.1400 |
| 500 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 120 | SD |
$28.00 |
$10.00 |
$10.45 |
$22.30 |
$10.10 |
| 510 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 100 | SD |
$25.00 |
$20.00 |
$20.90 |
$6.05 |
$20.50 |
| 520 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 400 | LF |
$20.00 |
$25.12 |
$42.05 |
$14.60 |
$40.00 |
| 530 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 400 | LF |
$8.00 |
$10.00 |
$3.15 |
$3.05 |
$3.05 |
| 540 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 12,200 | SD |
$0.5000 |
$0.0600 |
$0.0600 |
$0.0200 |
$0.0600 |
| 550 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 440 | SD |
$1.20 |
$2.00 |
$2.10 |
$2.00 |
$3.00 |
| 560 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,780 | SD |
$2.00 |
$0.5000 |
$0.5500 |
$2.00 |
$0.5000 |
| 570 | 880(C) 8848 |
WING BARRICADES | 440 | SD |
$2.80 |
$2.00 |
$2.10 |
$1.00 |
$2.02 |
| 580 | 880(D) 8854 |
VERTICAL PANELS | 20,460 | SD |
$1.50 |
$0.2500 |
$0.2500 |
$0.3000 |
$0.2500 |
| 590 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 5,900 | SD |
$0.5500 |
$1.00 |
$1.05 |
$0.1000 |
$1.02 |
| 600 | 880(F) 8878 |
DRUMS | 5,140 | SD |
$0.8000 |
$0.1000 |
$0.1000 |
$0.0200 |
$0.1000 |
| 610 | 880(G) 8890 |
CHANNELIZER CONES | 51,520 | SD |
$0.5500 |
$0.0500 |
$0.0500 |
$0.3000 |
$0.0500 |
| 620 | 880(I) 8902 |
FLAGGER | 200 | SD |
$65.00 |
$1.00 |
$68.00 |
$121.50 |
$2.00 |
| 630 | 880(L) 8920 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BIDDABLE) | 1,760 | HOUR |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
| 640 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 220 | SD |
$12.00 |
$15.00 |
$15.70 |
$15.20 |
$16.00 |
| 650 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$27,813.58 |
$108,350.00 |
$173,970.00 |
$150,000.00 |
| 660 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$1,000.00 |
$32,860.00 |
$3,036.00 |
$80,000.00 |
| 670 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$475,000.00 |
$528,000.00 |
$417,650.00 |
$445,910.47 |
$550,000.00 |